Westtown-Thornbury Elementary School New Classroom Addition West Chester Area School District 29 April 2021 Project Number: 2531 Specifications Volume 2 of 4 Divisions 02-14 Westtown-Thornbury Elementary School Addition For West Chester Area School District TABLE OF CONTENTS DIVISION 00 - PROCUREMENT REQUIREMENTS 00 0010 TABLE OF CONTENTS 00 1113 ADVERTISEMENT FOR BIDS 00 2113 INSTRUCTIONS TO BIDDERS 00 21BA A701-2018 INSTRUCTIONS TO BIDDERS 00 3100 AVAILABLE PROJECT INFORMATION 00 3100.1 FINAL GEOTECHNICAL REPORT 00 3100.2 STORMWATER PERC REPORT - HC 00 4100.01 BID FORM - STIPULATED SUM, GENERAL CONSTRUCTION 00 4100.02 BID FORM - STIPULATED SUM, MECHANICAL CONSTRUCTION 00 4100.03 BID FORM - STIPULATED SUM, PLUMBING CONSTRUCTION 00 4100.04 BID FORM - STIPULATED SUM, ELECTRICAL CONSTRUCTION 00 4313 BID SECURITY FORM 00 4513 BIDDER’S QUALIFICATION QUESTIONNAIRE 00 4519 NON-COLLUSIVE AFFIDAVIT 00 5200 AGREEMENT FORM 00 5200A AIA A101-2017 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR 00 6113.13 PERFORMANCE BOND 00 6113.16 PAYMENT BOND 00 7200 GENERAL CONDITIONS 00 7200A AIA A201-2017 GENERAL CONDITIONS 00 7343 WAGE RATE REQUIREMENTS 00 7343.1 PREVAILING WAGE RATE FORMS 00 7343.2 PREVAILING WAGE INSTRUCTIONS 00 7343.3 PREVAILING WAGE PROJECT RATES DIVISION 01 - GENERAL REQUIREMENTS 01 1100 SUMMARY OF WORK 01 1200 MULTIPLE CONTRACT SUMMARY 01 2300 ALTERNATES 01 2600 CONTRACT MODIFICATION PROCEDURES 01 2900 PAYMENT PROCEDURES 01 3113 PROJECT COORDINATION 01 3119 PROJECT MEETINGS 01 3216 CONSTRUCTION PROGRESS SCHEDULE 01 3300 SUBMITTAL PROCEDURES 01 4000 QUALITY REQUIREMENTS 01 4100 REGULATORY REQUIREMENTS 01 4100A ARREST OR CONVICTION FORM 01 4200 REFERENCES 01 5000 TEMPORARY FACILITIES AND CONTROLS 01 6000 PRODUCT REQUIREMENTS 01 7300 EXECUTION 01 7329 CUTTING AND PATCHING 01 7700 CLOSEOUT PROCEDURES 017900 DEMONSTRATION AND TRAINING 2531.00 TABLE OF CONTENTS KKKCKCCCBABA ArcArchitectshitects 04/29/2021 000110 - 1 Westtown-Thornbury Elementary School Addition For West Chester Area School District DIVISION 02 - EXISTING CONDITIONS 02 4116 STRUCTURE DEMOLITION 02 4119 SELECTIVE STRUCTURE DEMOLITION DIVISION 03 - CONCRETE 03 3000 CAST-IN-PLACE CONCRETE DIVISION 04 - MASONRY 04 2000 UNIT MASONRY 04 7200 CAST STONE MASONRY DIVISION 05 - METALS 05 1200 STRUCTURAL STEEL FRAMING 05 2100 STEEL JOISTS 05 3100 STEEL DECK DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES 06 1000 ROUGH CARPENTRY DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 1326 SELF-ADHERING SHEET WATERPROOFING 07 2100 THERMAL INSULATION 07 5216 MODIFIED BITUMINOUS MEMBRANE ROOFING 07 7100 MANUFACTURED ROOF SPECIALTIES 07 9200 JOINT SEALANTS 07 9500 EXPANSION CONTROL DIVISION 08 - OPENINGS 08 1113 HOLLOW METAL DOORS AND FRAMES 08 1416 FLUSH WOOD DOORS 08 3113 ACCESS DOORS AND FRAMES 08 4113 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS 08 5113 ALUMINUM WINDOWS 08 7100 DOOR HARDWARE 08 8000 GLAZING DIVISION 09 - FINISHES 09 2116 GYPSUM BOARD ASSEMBLIES 09 3000 TILING 09 5100 ACOUSTICAL CEILINGS 09 6500 RESILIENT FLOORING 09 9133 PAINTING AND COATINGS DIVISION 10- SPECIALTIES 10 1100 VISUAL DISPLAY SURFACES 10 2113 TOILET COMPARTMENTS 10 2813 TOILET ACCESSORIES 10 4400 FIRE PROTECTION SPECIALTIES 2531.00 TABLE OF CONTENTS KKKCKCCCBABA ArcArchitectshitects 04/29/2021 000110 - 2 Westtown-Thornbury Elementary School Addition For West Chester Area School District DIVISION 11- EQUIPMENT (NOT USED) DIVISION 12- FURNISHINGS 12 3216 MANUFACTURED LAMINATE-CLAD CASEWORK DIVISION 13 - 20 NOT USED DIVISION 21 - FIRE PROTECTION 21 0100 GENERAL PROVISIONS 21 0500 COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 0553 IDENTIFICATING FOR FIRE SUPPRESSION PIPING AND EQUIPMENT 21 1300 FIRE SURPRESSION SPRINKLER SYSTEMS DIVISION 22- PLUMBING 22 0100 GENERAL PROVISIONS 22 0502 EXCAVATION, BACKFILL, COMPACTION FOR UTILTY TRENCHES 22 0516 EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING 22 0519 METERS AND GAGES FOR PLUMBING PIPING 22 0553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 22 0719 PLUMBING PIPING INSULATION 22 1005 PLUMBING PIPING 22 1006 PLUMBING PIPING SPECIALTIES 22 0116 DOMESTIC WATER PITPING 22 4000 PLUMBING FIXTURES DIVISION 23- HEATING, VENTILATION AND AIR CONDITIONING 23 0501 GENERAL PROVISIONS 23 0513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 23 0515 REMOVALS 23 0516 EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING 23 0519 METERS AND GAGES FOR HVAC PIPING 23 0549 VIBRATION ISOLATION 23 0554 MECHANICAL IDENTIFICATION 23 0593 TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 0714 HVAC DUCT INSULATION 23 0716 HVAC EQUIPMENT INSULATION 23 0719 HVAC PIPING INSULATION 23 0923 AUTOMATIC TEMPERATURE CONTROLS 23 0993 HVAC CONTROL SEQUENCE 23 2113 HYDRONIC PIPING 23 2114 HYDRONIC SPECIALTIES 23 2117 PIPE HANGERS, SUPPORTS AND ANCHORS 23 2500 HVAC WATER TREATMENT 23 3100 HVAC DUCTS AND CASINGS 23 3300 AIR DUCT ACCESSORIES 23 3423 HVAC POWER VENTILATORS 23 3700 AIR OUTLETS AND INLETS 23 8101 TERMINAL HEAT TRANSFER UNITS 2531.00 TABLE OF CONTENTS KKKCKCCCBABA ArcArchitectshitects 04/29/2021 000110 - 3 Westtown-Thornbury Elementary School Addition For West Chester Area School District DIVISION 24 - NOT USED DIVISION 25 - NOT USED DIVISION 26 – ELECTRICAL 26 0100 GENERAL REQUIREMENTS 26 0501 MINOR ELECTRICAL DEMOLITION 26 0519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 0526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 26 0529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 26 0534 CONDUIT 26 0537 BOXES 26 0538 FIRESTOPPING 26 0553 IDENTIFICATION FOR ELECTRICAL SYSTEMS 26 0923 LIGHTING CONTROL DEVICES 26 2416 PANELBOARDS 26 2726 WIRING DEVICES 26 2813 FUSES 26 2818 ENCLOSED SWITCHES 26 5100 INTERIOR LIGHTING DIVISION 27 – COMMUNICATIONS 27 1005 STRUCTURED CABLING FOR VOICE AND DATA – OUTSIDE PLANT AND INSIDE PLANT 27 5134 INTERCOM PA AND MASTER CLOCK DIVISION 28 – ELECTRONIC SAFETY AND SECURITY 28 1325 INTEGRATED PLATFORM ACCESS CONTROL 28 3100 FIRE ALARM AND DETECTION SYSTEM DIVISION 29 - NOT USED DIVISION 30 - NOT USED DIVISION 31- EARTHWORK 31 0000 EARTHWORK 31 1100 CLEARING AND GRUBBING 31 2316 EXCAVATION FOR PAVEMENT 31 2333 TRENCH EXCAVATION FOR UTILITIES 31 2500 SOIL EROSION AND SEDIMENT CONTROL DIVISION 32 - EXTERIOR IMPROVEMENTS 32 1216 ASPHALTIC CONCRETE PAVING 32 1313 CONCRETE PAVING 32 1613 CURB AND SIDEWALK 32 1723 PAVEMENT MARKINGS 32 9100 TOPSOIL 32 9200 LAWN AND GRASSES 32 9300 LANDSCAPE PLANTING 2531.00 TABLE OF CONTENTS KKKCKCCCBABA ArcArchitectshitects 04/29/2021 000110 - 4 Westtown-Thornbury Elementary School Addition For West Chester Area School District DIVISION 33 - UTILITIES 33 4100 STORM SEWER SYSTEMS 33 4600 SUBDRAINAGE 33 7119 ELECTRICAL UNDERGROUND DUCTS AND MANHOLES END OF SECTION 00 0110 2531.00 TABLE OF CONTENTS KKKCKCCCBABA ArcArchitectshitects 04/29/2021 000110 - 5 Westtown-Thornbury Elementary School Addition For West Chester Area School District SECTION 02 4116 - STRUCTURE DEMOLITION PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Demolition and removal of buildings and structures. 2. Removing below-grade construction. 3. Disconnecting, capping or sealing, and removing site utilities. B. Related Sections include the following: 1. Division 01 Section "Summary": Site restrictions. 2. Division 01 Section "Temporary Facilities and Controls": Temporary construction, protection facilities, and environmental-protection measures for building demolition operations. 3. Division 02 Section "Selective Structure Demolition": Partial demolition of buildings, structures, and site improvements. 4. Division 31 Section "Site Clearing": Site clearing and removal of above-grade improvements not part of building demolition. 5. Division 31 Section "Site Clearing": Site stripping, removal of plants and trees, and protection of plants and trees indicated to remain. 6. Division 22 and 23 Sections: Demolishing or relocating site plumbing and HVAC items. 7. Division 26 Sections: Demolishing or relocating site electrical items. 1.2 DEFINITIONS A. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or recycled. B. Remove and Salvage: Detach items from existing construction and deliver them to Owner ready for reuse. C. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or recycled. 1.3 MATERIALS OWNERSHIP A. Historic items, relics, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, antiques, and other items of interest or value to Owner that may be encountered during building demolition remain Owner's property. Carefully remove and salvage each item or object in a manner to prevent damage and deliver promptly to Owner. 1.4 SUBMITTALS A. Qualification Data: For demolition firm. 2531.00 STRUCTURE DEMOLITION KCBA Architects 04/29/2021 SECTION 02 4116 - 1 Westtown-Thornbury Elementary School Addition For West Chester Area School District B. Proposed Environmental-Protection, Dust-Control, and Noise-Control Measures: Submit statement or drawing that indicates the measures proposed for use, proposed locations, and proposed time frame for their operation. Identify options if proposed measures are later determined to be inadequate. C. Schedule of Building Demolition Activities: Indicate the following: 1. Detailed sequence of demolition and removal work, with starting and ending dates for each activity. 2. Interruption of utility services. 3. Coordination for shutoff, capping, and continuation of utility services. 4. Locations
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages271 Page
-
File Size-