NOTICE MASS RAPID TRANSIT SUNGAI BULOH – KAJANG LINE UPDATES on CONSTRUCTION WORKS ALONG LEBUHRAYA DAMANSARA-PUCHONG (LDP) 1 June 2014 – 31 December 2014

NOTICE MASS RAPID TRANSIT SUNGAI BULOH – KAJANG LINE UPDATES on CONSTRUCTION WORKS ALONG LEBUHRAYA DAMANSARA-PUCHONG (LDP) 1 June 2014 – 31 December 2014

NOTICE MASS RAPID TRANSIT SUNGAI BULOH – KAJANG LINE UPDATES ON CONSTRUCTION WORKS ALONG LEBUHRAYA DAMANSARA-PUCHONG (LDP) 1 June 2014 – 31 December 2014 Please be informed that below are the construction updates for works along the LDP Highway for the next six months from 1 June 2014 to 31 December 2014. This stretch along the LDP Highway (Kepong-bound) will be from Damansara Utama (Jalan SS21/23) until the 1 Utama shopping centre. The MRT-related works will include the construction of the special span crossing across the LDP Highway from Jalan Damansara and MRT 1U Station works. The construction activities are as follows: Construction of riverbank RC (reinforced concrete) wall, bore pile and caisson works, piers construction, concreting and launching of segmented box girders (SBGs) which will form the guideway for the MRT elevated line. Special span crossing across the LDP Highway from Jalan Damansara – Launching of SBGs (starting July 2014 onwards) Station works – bore piling, piers construction, launching of SBGs, launching of cross beam and T- beam, and station floor works. Working hours will be from 8am to 10pm, Monday to Sunday (including Public Holidays). Boring works will stop at 7pm and concreting works will continue until 10pm. At times, night works may go beyond 10pm due to unforeseen circumstances. Night works are subjected to Authorities’ approval and advance notice will be given to residents/ establishments via mail drops for night works involving lane closures or traffic diversions. Together with this notice is a MRT Community Info board for display on your Notice Board. As part of MRT Corp’s Standard Operating Procedure, safety barriers, traffic cones and traffic flagman will be placed at the work site to ensure road users are pre-warned of on-going works. In addition, a 24-hour MRT Ronda will be patrolling along the route to attend to any emergencies. MRT Corp apologizes for any temporary inconvenience caused to the public during the construction of this world-class public transport facility that will benefit Malaysians at large. For more information: MRT construction works at Persiaran Surian: MCB: Project Manager, Mr. Paul Ong; Hp: 012 3298 460; Email: [email protected] MRT: MRT Hotline:1800 82 6868; www.mymrt.com.my; [email protected] MUDAJAYA CORPORATION BHD .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us