BAM Turns 45

BAM Turns 45

About the Company Strategic report Performance overview BAM turns 45 The BAM is one of the key elements of transport infrastructure ensuring fast-paced economic growth in Russian regions. “ The BAM project is a powerful driver for the economy and social infrastructure development still relevant nowadays. Its practical and strategic significance is unquestionable because of great opportunities it offers for exploration and mining, as well as for freight transportation between Asia and Europe.” Andrey Makarov Deputy CEO 1977 1984 The BAM–Tynda section So-called golden spike was hammered was commissioned. The construction at the Kuanda station to link of the Severomuysky Tunnel started the two sections of the mainline 1974 1979 1989 A train carrying the first Komsomol The Tynda–Berkakit A 3,000 km section members to become BAM construction section of the mainline workers departed from the Yaroslavsky was commissioned was commissioned station in Moscow 22 Russian Railways Sustainable development Corporate governance Appendices Tynda Komsomolsk-on-Amur Novy Urgal Sovetskaya Gavan Severobaikalsk Neryungri Khabarovsk Novaya Chara Taksimo Vladivostok Lena Ust-Kut Tayshet Railway bridges Railway stations Railway tunnels 2003 2018 The Severomuysky Tunnel The last section of the Baikalsky Tunnel was commissioned was completed 2013 2019 Russian Railways’ comprehensive development programme Five railway bridges for the Eastern Operating Domain were commissioned. was launched The Vladivostoksky Tunnel renovation and the Baikalsky Tunnel construction were completed Revamping stations for the BAM’s anniversary To mark the 45th anniversary of the BAM, Russian Railways completed the overhaul of eight railway stations: Tynda, Neryungri, Novy Urgal, Komsomolsk-on-Amur, Novaya Chara, Taksimo, Lena and Severobaykalsk. The Company refreshed the stations’ interiors and exteriors, improved the adjacent territories, upgraded the utility systems, and renovated ticket office areas. The biggest project worth nearly RUB 185 m was implemented at the Tynda station. It included: • refurbishment of the station’s exterior and lighting system, replacement of doors and windows; • repairs of the roofing and the island passenger platform; • adjacent area improvement; • installation of three variable-message signs and a queue management system; • security system upgrade; • installation of new security screening equipment. Annual report 2019 23.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us