Download Closures and Detours

Download Closures and Detours

Type of Type of Date City Location Closure Closure Limits Time Frame Detour Closure Work 9/27/21 9/27/21 Costa Mesa 9/27/21 Costa Mesa I-405/SR-73 Connector I-405/SR-73 SB 405 from SR-73 to Bear 9/27/21 Costa Mesa Lane Reduction 8:30 pm to 5 am Right 4 Lanes Bridge Work None Connector St. 9/27/21 Costa Mesa Fairview Road SB 405 off-ramp onto Highway SB I-405 Harbor Blvd. off-ramp, NB Harbor Blvd., EB South 9/27/21 Costa Mesa Fairview Road SB 405 off-ramp 9 pm to 5 am Full Closure Fairview Rd. construction Coast Dr., Fairview Rd. 9/27/21 Costa Mesa Harbor Boulevard Harbor NB Harbor Blvd. on-ramp NB Harbor Blvd., EB Baker St., NB Bristol St., SB I-405 loop 9/27/21 Costa Mesa SB 405 on-ramp 8:30 pm to 5 am Full Closure Bridge Work Boulevard onto SB 405 on-ramp Harbor NB 405 lane NB 405 between Harbor Highway 9/27/21 Costa Mesa 10 pm to 1 am Right 2 Lanes None Boulevard reduction Blvd. and Euclid St. construction SB I-405 Freeway SB I-405 between Harbor 9/27/21 Costa Mesa Fairview Road 9 pm to 5 am Right 3 Lanes Bridge Work None Lane Reduction Blvd and Fairview Rd. 9/27/21 Costa Mesa Hyland Avenue Hyland Ave./ South Coast NB Harbor Blvd., WB MacArthur Blvd/Talbert Ave., SB 9/27/21 Costa Mesa Hyland Avenue NB 405 on-ramp 10 pm to 7 am Full Closure Bridge Work Dr. on-ramp onto NB 405 Newhope St., NB I-405 on-ramp 9/27/21 Fountain ValleEuclid Street/ Ellis Avenue Euclid Street/ NB I-405 off-ramp to Euclid Paving NB I-405 Harbor Blvd off-ramp, NB Harbor Blvd., WB 9/27/21 Fountain Valley NB 405 off-ramp 9/8 to 10/12 Full Closure Ellis Avenue St. Operation MacArthur Blvd., Euclid St. Euclid Street/ SB 405 off-ramp onto SB Highway SB I-405 Brookhurst St. off-ramp, SB Brookhurst St., EB Ellis 9/27/21 Fountain Valley SB 405 off-ramp 10 pm to 5 am Full Closure Ellis Avenue Euclid St./Ellis Ave. construction Ave./Euclid St. Euclid Street/ NB I-405 Lane NB 405 between Euclid St. Highway 9/27/21 Fountain Valley 10 pm to 5 am Right 3 Lanes None Ellis Avenue Reductions and Talbert Ave construction Euclid Street/ NB I-405 Lane NB 405 between Euclid St. Highway 9/27/21 Fountain Valley 10 pm to 5 am Right 4 Lanes None Ellis Avenue Reductions and Ward St. construction SB Euclid St. between Euclid Street/ SB Full Street Condor Ave./ Mt. Full Street Water Line 9/27/21 Fountain Valley 10 pm to 5 am WB Talbert Ave., SB Ward St., Ellis Ave. Ellis Avenue Closure Washington St. and Closure Shutdown freeway ramps Euclid Street/ Euclid St. on-ramp onto NB Highway NB Euclid St., WB Slater Ave., SB Brookhurst St., NB I-405 9/27/21 Fountain Valley NB 405 on-ramp 10 pm to 5 am Full Closure Ellis Avenue 405 construction on-ramp Euclid Street/ NB I-405 Lane NB I-405 between Euclid Highway 9/27/21 Fountain Valley 10 pm to 5 am Right 3 Lanes None Ellis Avenue Reductions St. and Warner Ave. construction 9/27/21 Fountain ValleTalbert Avenue EB Talbert Ave. on-ramp 1: Talbert Ave., Euclid St., SB I-405 on-ramp 9/27/21 Fountain Valley Talbert Avenue SB 405 on-ramp 9/20 to 10/20 Full Closure Bridge Work onto SB 405 2: NB Magnolia St., EB Warner Ave., SB I-405 on-ramp 9/27/21 Fountain ValleBrookhurst Street Brookhurst NB 405 off-ramp onto NB Highway 9/27/21 Fountain Valley NB 405 off-ramp 10 pm to 5 am Full Closure NB Warner Ave off-ramp, Brookhurst St. Street Brookhurst St. construction 9/27/21 Fountain ValleWarner Avenue Full Bridge Warner Ave. between Highway 9/27/21 Fountain Valley Warner Avenue 6/1/21 to 6/1/23 Full Closure Magnolia St., WB McFadden Ave., Brookhurst St. Closure freeway ramps construction NB I-405 CD off- NB I-405 CD off-ramp onto Highway NB I-405 Brookhurst St. off-ramp, NB Brookhurst St., WB 9/27/21 Fountain Valley Warner Avenue 10 pm to 5 am Full Closure ramp Warner Ave./Magnolia St. construction Warner Ave. 9/27/21 Huntington Beach 9/27/21 Huntington BeHeil Avenue Full Street Heil Ave. between Ross Ln. 12/30/20 to Highway 9/27/21 Huntington Beach Heil Avenue Full Closure Heil Ave., Ross Ln., Royal Dr., Landau Ln. Closure and Savoy Cir. 12/31/21 construction 9/27/21 Westminster Beach Boulevard NB I-405 Warner Ave. off-ramp, WB Warner Ave., NB Beach NB 405 loop off- NB 405 loop off-ramp onto Highway 9/27/21 Westminster Beach Boulevard 11 pm to 5 am Full Closure Blvd. ramp SB Beach Blvd. construction 1. SB Beach Blvd., EB Edinger Ave., SB I-405 On-Ramp 2. SB Beach Blvd., EB Warner Ave., SB I-405 On-Ramp SB 405 loop on- Beach Blvd./Center Ave. Highway 9/27/21 Huntington Beach Beach Boulevard 10 pm to 5 am Full Closure 3. SB Beach Blvd., EB Warner Ave., SB Brookhurst St., SB I- ramp loop on-ramp onto SB 405 construction 405 Loop On-Ramp 4. McFadden Ave., Magnolia St., SB 405 Loop On-Ramp 9/27/21 Westminster/Huntington Beach 9/27/21 Westminster/Edinger Avenue 1: NB Newland St., WB McFadden Ave., SB Beach Blvd. Westminster/Hun Full Bridge 10/22 for 18 Full Street Highway 2: NB Beach Blvd., EB McFadden Ave., SB Newland St. 9/27/21 Edinger Avenue Edinger Ave. Bridge tington Beach Closure months Closure construction 3: SB Beach Blvd., EB Heil Ave., NB Newland St. 4: SB Newland St., WB Heil Ave., NB Beach Blvd. Westminster/Hun NB I-405 between Edinger Striping 9/27/21 Edinger Avenue Lane Reduction 10 pm to 1 am Right 3 Lanes None tington Beach Ave. and McFadden Ave. Operation Westminster/Hun NB I-405 between Edinger Striping 9/27/21 Edinger Avenue Lane Reduction 12 am to 1 am Right 4 Lanes None tington Beach Ave. and McFadden Ave. Operation 9/27/21 Westminster/McFadden Avenue SB I405 between Westminster/ McFadden SB I-405 Freeway Highway 9/27/21 McFadden Ave. and 10 pm to 5 am Left 3 Lanes None Huntington Beach Avenue Closure construction Newland St. 9/27/21 Westminster 9/27/21 Westminster Bolsa Avenue 1: NB I-405 Westminster Willow Ln. off-ramp, Goldenwest NB I-405 loop off- NB 405 loop off-ramp onto Highway St., Bolsa Ave. 9/27/21 Westminster Bolsa Avenue 6/18 for to 11/23 Full Closure ramp WB Bolsa Ave. construction 2: NB I-405 Beach Blvd. off-ramp, NB Beach Blvd., Bolsa Ave. SB 405 loop off- SB 405 loop off-ramp onto SB I-405 Westminster Mall Rd. off-ramp, EB Westminster 9/27/21 Westminster Bolsa Avenue 10 pm to 5 am Full Closure Bridge Work ramp EB Bolsa Ave. Mall Rd., SB Goldenwest St., EB Bolsa Ave. NB I-405 Freeway NB I-405 between Bolsa 10 pm to 5 am Highway 9/27/21 Westminster Bolsa Avenue Right 2 Lanes None Lane Closures Ave. and Goldenwest St. until 11/23 construction SB I-405 between SB I-405 Freeway 5 am to 12 pm Highway 9/27/21 Westminster Bolsa Avenue Goldenwest St. and Bolsa Left 2 Lanes None Lane Closures until 11/23 construction Ave. 9/27/21 Westminster Goldenwest Street SB I-405 between Goldenwest SB I-405 Freeway 5 am to 12 pm SB I-405 Goldenwest St./Westminster Mall Rd off-ramp, SB 9/27/21 Westminster Goldenwest St. and Bolsa Full Closure Bridge Work Street Lane Reductions until 11/23 Goldenwest St., EB Edinger Ave., SB I-405 on-ramp Ave. Goldenwest St./ Goldenwest SB 405 loop on- 1: SB Goldenwest St., EB Bolsa Ave., SB I-405 on-ramp 9/27/21 Westminster Westminster Mall Rd. loop 10 pm to 5 am Full Closure Bridge Work Street ramp 2: SB Goldenwest St., EB Warner Ave., SB I-405 on-ramp on-ramp onto SB 405 9/27/21 Westminster Springdale Street Springdale SB 405 off-ramp onto Highway EB SR-22, Garden Grove Blvd., Valley View St./Bolsa Chica 9/27/21 Westminster SB 405 off-ramp 10 pm to 5 am Full Closure Street Springdale St. construction Rd., SB Bolsa Chica Rd., Westminster Blvd., Springdale St. SB I-405 between Springdale SB I-405 Freeway Highway 9/27/21 Westminster Springdale St. and 10 pm to 5 am Right 2 Lanes None Street Lane Reductions construction Newland St. 9/27/21 Westminster Edwards Street NB: WB Bolsa Ave., NB Springdale St., EB Westminster Full Bridge 6/23 for 12 Full Street Highway 9/27/21 Westminster Edwards Street Edwards St. Bridge Blvd. Closure months Closure construction SB: EB Westminster Blvd., SB Springdale St., EB Bolsa Ave. 9/27/21 Westminster Westminster Boulevard Westminster SB I-405 loop off- SB I-405 loop off-ramp 8/26/20 to Highway SB I-405 Springdale St. off-ramp, SB Springdale St., 9/27/21 Westminster Full Closure Boulevard ramp onto EB Westminster Blvd. 10/26/21 construction Westminster Blvd. 9/27/21 Westminster Springdale Street NB: 1: WB Westminster Blvd, NB Bolsa Chica Rd, EB Lampson Ave, NB Springdale St SB Springdale St.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    23 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us