Coil coating line no.2 Voestalpine AG, Austria Indonesia Headquarters Jembatan Tiga Raya No.6A, Jakarta-14440 WIN GROUP 021-66600050 / [email protected] www.win‒therm.com www.andritz.com Coil coating line for highest quality Coating stations primer and top coat Enamelling furnace Cooler Looper Inspection Inspection table Laser welding Strip entry Strip exit Strip cleaning and pre-treatment machine (chromate-free technology) ▲ Schematic description of a coil coating line ▲ Entry section of color coating line no. 2 ▲ Cleaning section ▲ Coater room Entry section Strip cleaning and Coater This section consists of two pay-off reel pre-treatment The top and bottom coating applies at groups each equipped with a leveller and After passing the entry accumulator the three stations: Prime coater a crop shear. The head and tail ends of the strip continues through a horizontal, alka- (basecoat on top and bottom) coils are welded together through a laser line strip cleaning to achuieve optimal sur- Finish coater A (topcoat on top) welding process in order to create a con- face conditions for painting. Finish coater B (topcoat on top and tinuous strip. This is done in the following zones: bottom) Alkaline spray cleaning 1 Example for coating: Exit section Brushing machine Cover coat (20 µm) The exit section consits of one coiling reel Alkaline spray cleaning 2 Base coat (5 µm) Pre-treatment coat (< 1µm) group as well as a bypass to a separate Cascade rinsing with demineralized Zinc coat (4-25 µm) (also sometimes soft or desalted) water crop shear in order to cut larger sample quantities. Chromium-free pre-treatment Base material (0.4-2.0 mm) Dryer Zinc coat (5-25 µm) Pre-treatment coat (1µm) Base coat (5 µm) Cover coat (20 µm) Performance and optimized yield for color coated products ▲ Exit section, coil transport Enamelling furnace The strip passes through a horizontal fur- nace in order to condition the coat. Basi- cally, the holding time is approximately 20 to 25 seconds, in which the hot air is blown directly on the strip. Finally, the outgoing strip has a temperature of about 240 °C. Cooler ▲ Enamelling furnace Directly after beeing enamelled the strip is cooled down from 240°C to approximately 40°C. The cooling takes place in a horizon- tal stainless steel tank by quenching the strip with demineralized water. Looper The vertical entry and exit accumulators compensate any down time to avoid stops and provide a continuous strip travel in the ▲ Waterquench process section. ▲ Vertical entry looper ▲ Vertical exit looper Coil coating line no. 2 voestalpine AG, Austria Features Scope of supply and services of ANDRITZ METALS Coil coating line for the produstion of organically coated sheets Process turn-key incl. steel structure Project data Project start September 2002 Start of installation February 2003 Start of commissioning December 2003 Technical data Capacity 200,000 t/a Strip thickness 0.4-2.0 mm Strip width 700-1,850 mm Entry section speed max. 210 m/min Process section speed max. 120 m/min Exit section speed max. 210 m/min ANDRITZ AG 4031 Linz, Austria Phone: +43 (732) 6987 76210 [email protected] ANDRITZ AG Eibesbrunnergasse 20 ANDRITZ Sundwig GmbH ANDRITZ Selas SAS 1121 Vienna, Austria 58675 Hemer, Germany 92600 Asnières-sur-Seine, France Phone: +43 50805 0 Phone: +49 (2372) 540 Phone: +33 (1) 4080 3400 [email protected] [email protected] [email protected] www.andritz.com All data, information, statements, photographs, and graphic illustrations in this leaflet are without any obligation and raise no liabilities to or form part of any sales contracts ofANDRITZ AG or any affiliates for equipment and/or systems referred to herein. ©ANDRITZ AG 2012. All rights reserved. No part of this copyrighted work may be reproduced, modified or distributed in any form or by any means, or stored in any database or retrieval system, without the prior written permission of ANDRITZ AG or its affiliates. Any such unauthorized use for any purpose is a violation of the relevant copyright laws. ANDRITZ AG, Stattegger Strasse 18, 8045 Graz, Austria AM.Bandbeschichtung2.02.eng.08.12.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages4 Page
-
File Size-