STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES:- Sl. Information required Information to be furnished by the No. proponents 1 Name of the project or activity Asram Hospital & Medical College 2 Name of the organization/owner M/s. Alluri Sitarama Raju Educational Society 3 Address for communication Asram Hospital & Medical College Malkapuram Village, Eluru Mandal, Pin: 534005, West Godavari District, Andhra Pradesh. 4 Telephone numbers 08812-288288,288299 5 Email ID of the organization or [email protected], [email protected] contact person 6 Location of the Proposed project Survey. Nos .are given in Annexure-2. or activity 7 Appraisal Category (B2 or B1) Category B2 8 Nearest habitation and distance Kornadvolu- 0.52 Km in SE direction from the project or activity 9 Installed capacity / Production Total Plot Area : 87.73 acres Capacities (3,55,030.71 m2) Built up area : 1,08,340.57 m2 No. beds in : 1000 (Occupancy Hospital 550) Total No. of : 1075 students 10 Specify the Fuel (Coal / CNG / biomass/Others) and quantity During power failure HSD will be used to run required standby DG sets. 11 Details of Land use/Land Cover The project is already developed into Asram hospital, Medical College & Nursing College. 12 Occupancy, ownership of the land Private Land in which the activity is proposed: (Government land / Private land / Forest land /Revenue land /Temple land /leased land/ land belongs to other Department) 13 If it is a Forest land, the following Not Applicable details shall be furnished : (Whether it is a Reserved forest / Protected forest/Demarcated forest/ National Parks/ Sanctuaries/ any land in possession of Forest Department.) (The village map with Sy. No. indicating nearest forest boundary line from the site shall be enclosed) 14 Total investment of the Rs. 99.5 Crores project/activity. a. Funds allocated for EMP Capital: Rs. 91 Lakhs (capital cost and recurring cost Recurring: Rs. 6 Lakhs per annum) 15 Brief description of the project Adequate stack height for DG sets is provided with special reference to specific as per norms. pollution and its control Back up DG sets is used only during power measures. failure. DG room is treated acoustically as per norms to control the noise from DG sets. Pumps, STP, Compressors, DG sets etc. is properly maintained for fuel efficiency and noise control. Personal protective equipment is provided to the maintenance staff working in high noise areas. About 457 KLD of wastewater is generated during operational phase. STP of 500 KLD is installed and treated wastewater is used for greenbelt development and flushing purpose. Regular monitoring of STP effluent quality is carried out as per norms. The total municipal waste generated as of now from the project is 500 kg/day but as per occupancy of the project, generation would be 1540.50Kg/day. Solid wastes is segregated into organic and inorganic components. The recyclable inorganic wastes is sold to prospective buyers. Organic waste is handed over to local authorities Total Biomedical Waste generated as of now from the project is 70 Kg/day but as per occupancy of the project, generation would be 165 Kg/day which will be handled and treated in accordance with the Biomedical Waste (Management and Handling) Rules, 1998 and as per norms and guidelines of CPCB. Dewatered / dried sludge from STP will be used as manure in horticulture. Proper Environment Management Plan is followed as per the CPCB norms. 16 Compliance report on the NA following : i. Status of compliance of the - conditions and environmental safeguards stipulated in the earlier clearance letters. ii. Details of the court cases, if - any, pending in any Court of Law against the project as well as any directions passed by the Court relating to the project directly or indirectly. iii. Details of the notices, if any, - given to the project under Section 5 of the Environmental (Protection) Act, 1986 and Section 18 of the Air (Prevention & Control of Pollution) Act, 1981. 17. Whether the project attracts the Yes provisions laid under the OM dt.16.11.2010 issued by the MoE&F, GOI, w.r.t. violation of EIA Notification, 2006 and its amendments there of ? (Yes / No) Present stage and status of the Hospital, Medical college, Nursing College, Project : Hostels and staff quarters & STP has been constructed. 18. Name of the Consultant: M/s. Sri Sai Manasa Nature Tech Private Limited Plot no: 74/A, Flat no: 102, Central bank Building, Kalyan Nagar, Hyderabad- 500 038., Telangana DECLARATION (a) We M/s. Alluri Sitarama Raju Educational Society, Asram Hospital & Medical College, Malkapuram Village, Eluru Mandal, Pin: 534005, West Godavari District, Andhra Pradesh hereby declare that our organization does not /do not have conflict of interest with the Chairmen and members of SEAC, A.P. and SEIAA, A.P. (b) We hereby declare that M/s. Sri Sai Manasa Nature Tech Private Limited, Plot No. 74/A Flat No. 102, Central Bank Building, Kalyan Nagar, Hyderabad-500 038, Telangana is authorized to submit the application and to do all necessary correspondence for obtaining environmental clearance from State Level Environment Impact Assessment Authority (SEIAA), A.P. and to attend the meeting (s) of State level Expert Appraisal Committee (SEAC), A.P. to present our case and to clarify the points raised by the Members of SEAC and SEIAA., (c) I/we here by declare that the information furnished above is true to best of my/our knowledge and I/we shall hold personal liability for any deliberate misrepresentation and or concealment of factual information. If the information furnished is found to be false, the EC issued to our organization can be withdrawn and I/we are liable for action as per rules applicable. Date Place Signature of the Applicant /12/2014 M/s. Alluri Sitarama Raju Educational Society, Asram Hospital & Medical College, Malkapuram Village, Eluru Mandal, Pin: 534005, West Godavari District, Andhra Pradesh. To The Member Secretary, State Level Environmental Impact Assessment Authority, AP, A-3, Industrial Estate, Sanatnagar, HYDERABAD - 500018. Sir, Sub: SEIAA, AP- M/s. Alluri Sitarama Raju Educational Society, Asram Hospital & Medical College, Malkapuram Village, Eluru Mandal, Pin: 534005, West Godavari District, Andhra Pradesh.–Intimation of the Authorized Signatory- Reg. Ref: Amendments to EIA-2006 notification issued vide S.O.3067 (E) dt. 01.12.2009 by MoE&F, GOI. With reference to above, it is to inform that the project proponent M/s. Alluri Sitarama Raju Educational Society, Asram Hospital & Medical College, Malkapuram Village, Eluru Mandal, Pin: 534005, West Godavari District, Andhra Pradesh., has authorized Sri. Dr. K. Hanumantha Rao, Chief Administrative Officer of our organization, to make all necessary correspondence with the SEAC, AP & SEIAA, AP on behalf of the proponent for obtaining the Environmental Clearance for the project at Malkapuram Village, Eluru Mandal, Pin: 534005, West Godavari District, Andhra Pradesh. Passport size Photograph of the Authorized Person to be attested by the proponent Yours faithfully, (Name & address of the Authorized Signatory) Dr. K. Hanumantha Rao M/s. Alluri Sitarama Raju Educational Society, Asram Hospital & Medical College, Malkapuram Village, Eluru Mandal, Pin: 534005, West Godavari District, Andhra Pradesh. Signature of the proponent .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages6 Page
-
File Size-