WRR 30 April 2018

WRR 30 April 2018

LITHGOW / BATHURST DISTRICT (Inc. Lithgow, Bathurst, Orange and Mudgee areas) To Fr Weekly Road Report Western Region 30 April 2018 LITHGOW / BATHURST DISTRICT (Inc. Lithgow, Bathurst, Orange and Mudgee areas) PRIMARY LOCATION: MITCHELL HIGHWAY – HW7 Work type: Widening, slope stability and safety barrier installation. Location: 12km East of Orange, Lucknow. Lane closures: One lane closed during work shift. Impact: Delays up to 5 minutes can be expected. Speed restrictions: 40, 60km/h as directed. Working days: Mon to Fri. Working hours: 0700 to 1800 hrs. Expected completion: June 2018. Advice / comments: Work will impact traffic on Favell Rd. Please obey all signs and proceed with care. PRIMARY LOCATION: SOFALA ROAD - MR 54 Work type: Sofala Hill Widening and Curves Project. Location: 2km south of Crossley bridge and 2km North of Hill End Road. Lane closures: Intermittent. Impact: Delays up to 5 minutes can be expected. Speed restrictions: 40, 60,80km/h as directed. Working days: Mon to Fri and occasional Saturdays 7am-1pm. Working hours: 0700 to 1800 hours. Expected completion: 25 June 2018. Advice / Comments: Please obey all signs and proceed with care. PRIMARY LOCATION: OLYMPIC HIGHWAY - MR 78 Work type: Pavement Rehabilitation Location: 0.5km to 2.5km south of Grenfell Road Intersection (Cowra) Lane closures: Intermittent. Impact: Delays up to 5 minutes can be expected. Speed restrictions: 40, 60km/h as directed. Working days: Mon to Fri. Working hours: 0700 to 1800 hours. Expected completion: 1 June 2018. Advice / Comments: Please obey all signs and proceed with care. Page 1 of 13 LITHGOW / BATHURST DISTRICT (Inc. Lithgow, Bathurst, Orange and Mudgee areas) PRIMARY LOCATION: CASTLEREAGH HIGHWAY – HW18 Work type: Shoulder Widening Location: 0 - 2km North of Mount Vincent Road Intersection, Running Stream. Lane closures: Intermittent. Impact: Delays up to 5 minutes can be expected Speed restrictions: 40, 60, 80km/h as directed Working days: Mon to Fri. Working hours: 0700 to 1800 hrs. Expected completion: 12 May 2018. Advice / Comments: Please obey all signs and proceed with care. PRIMARY LOCATION: GREAT WESTERN HIGHWAY – HW5 Work type: Asphalt resurfacing Location: Lawsons Creek, 23km West of Lithgow. Lane closures: Two lanes of three during shift work. Possible one of three lanes overnight Impact: Delays of 5 minutes can be expected. Speed restrictions: 40, 60 km/h as directed. Working days: Mon - Sat. Working hours: 0700 to 0600 hrs. Expected completion: 19 May 2018. Advice / comments: Please obey all signs and proceed with care. PRIMARY LOCATION: MID WESTERN HIGHWAY – HW6 Work type: Pavement and Intersection Reconstruction. Location: Adelaide and Martha Streets Blayney. Lane closures: One of two lanes closed. Impact: Delays of 5 minutes can be expected. Speed restrictions: 40km/h as directed. Working days: Mon to Sat. Working hours: 0700 to 1800 Hours Mon to Fri. 0700 to 1600 Hours on Sat. Expected Completion: 30 June 2018 Advice / Comments: please obey all signs and proceed with care. PRIMARY LOCATION: GREAT WESTERN HIGHWAY – HW5 Work type: Vegetation Control Location: 34km to 38km West of Lithgow – Yetholme Lane closures: Intermittent. Impact: Delays up to 5 minutes can be expected Speed restrictions: 40,60km/h as directed Working days: Mon to Fri. Working hours: 0700 to 1700 hrs. Expected completion: 4 May 2018. Advice / Comments: Please obey all signs and proceed with care. Page 2 of 13 LITHGOW / BATHURST DISTRICT (Inc. Lithgow, Bathurst, Orange and Mudgee areas) PRIMARY LOCATION: MITCHELL HIGHWAY – HW7 Work type: Highway realignment and reconstruction. Location: 30km north of Orange. Lane closures: Intermittent. Impact: Delays up to 5 minutes can be expected. Speed restrictions: 40, 60, 80 km/h as directed. Working days: Mon to Sat. Working hours: 0700 to 1800 hours. Expected completion: June 2018. Advice / Comments: 600m Sidetrack in operation on the Eastern Orange end from 8th and 9th March. There will be 2 x 3.5m wide lanes with 1m sealed Shoulders, speed reduction to 60km. 500m Sidetrack in operation on the Western (Molong) end from 12th July. There will be 2 x 3.5m wide lanes with 1m sealed Shoulders, speed reduction to 60km. Additional information: A 2km section of the new works in the middle of the project was opened to traffic on 17 March. There are 2 x 3.5m wide lanes with 1m sealed shoulders. Roadworks at the Western (Molong) end of the project with pavement construction under traffic. Contraflow in operation 24hrs/day. Works expected to continue until 27 April. Please obey all signs and proceed with care. PRIMARY LOCATION: MILLTHORPE ROAD – MR559 Work type: Culvert Replacement Location: Junction of Millthorpe Road and Mitchell Hwy, 4km East of Lucknow. Lane closures: Intermittent. Reduced lane widths of 3.5m past work area. Impact: Delays up to 5 minutes can be expected. Speed restrictions: 40 km/h as directed. Working days: Mon to Sat. Working hours: 0700 to 1800 hours. Expected completion: 30 June 2018. Advice / Comments: Please obey all signs and proceed with care. PRIMARY LOCATION: DUCKMALOI ROAD – MR558 Work type: Bridge maintenance – paint repair, scour remediation, barrier upgrade. Location: Duckmaloi Bridge over Duckmaloi River, 15km East of Oberon. Lane closures: Nil. Reduction in speed limits only. Impact: Delays up to 5 minutes can be expected. Speed restrictions: 40, 60, 80 km/h as directed. Working days: Mon to Fri. Working hours: 0700 to 1700 hours. Expected completion: 28 June 2018. Advice / Comments: Please obey all signs and proceed with care. Page 3 of 13 LITHGOW / BATHURST DISTRICT (Inc. Lithgow, Bathurst, Orange and Mudgee areas) PRIMARY LOCATION: O’CONNELL ROAD – MR253 Work type: Bridge Repainting Works, commencing 15 March 2018. Location: Bridge over Wisemans Creek, 9.7km N of Oberon Lane closures: Intermittent lane closures may be required during site establishment. Impact: Delays up to 5 minutes can be expected. Speed restrictions: 40, 60, 80 km/h as directed. Working days: Mon – Sat Working hours: 0700 – 1800 hours Expected completion: 18 May 2018 Advice / Comments: Please obey all signs and proceed with care. PRIMARY LOCATION: SOFALA ROAD (CURVES) – MR 54 Work type: Barrier Curve installation and widening Location: 4.6 to 6.2km’s North of Sofala from Hill End Road Lane closures: Intermittent Impact: Delays up to 5 minutes can be expected. Speed restrictions: 40, 60, 80 km/h as directed. Working days: Mon to Fri. Working hours: 0700 to 1700 hours. Expected completion: 30 June 2018. Advice / Comments: Please obey all signs and proceed with care. PRIMARY LOCATION: SOFALA ROAD NORTH – MR 54 Work type: Widening and drainage works. Location: Arthur Street Trunkey Creek Village Lane closures: Intermittent Impact: Delays up to 5 minutes can be expected. Single lane closures during working times. Speed restrictions: 40, 60, 80 km/h as directed. Working days: Mon to Fri and Sat 7-1pm Working hours: 0700 to 1700 hours. Expected completion: 30 May 2018. Advice / Comments: Please obey all signs and proceed with care. Page 4 of 13 DUBBO DISTRICT (Inc. Forbes, Cobar, Coolah, Bourke, Parkes, Walgett & Wellington areas) PRIMARY LOCATION: GOLDEN HIGHWAY – HW27 Work type: Fitzells to Plains Creek Rehabilitation. Location: 60.4km to 67.0km West of Dunedoo (24.1km to 30.7km East of Dubbo). Lane closures: Intermittent. Impact: Delays up to 5 min can be expected during work hours. Speed restrictions: 40, 60 km/h as directed. Working days: Mon to Sat. Working hours: 0700 to 1800 hours Mon to Fri & 0800 to 1300 Sat. Expected completion: 15 June 2018. Advice / Comments: Please obey all signs and proceed with care. PRIMARY LOCATION: GOLDEN HIGHWAY - HW27 Work type: HW27 & Cobbora Rd West Intersection Upgrade Location: 33km West of Dunedoo. Lane closures: Intermittent. Impact: Delays up to 5 min can be expected during work hours. Speed restrictions: 40, 60 km/h as directed. Working days: Mon to Sat. Working hours: 0700 to 1800 hours Mon to Fri. 0700 to 1600 Saturday Expected completion: June 2018 Advice / Comments: Please obey all signs and proceed with care. PRIMARY LOCATION: MITCHELL HIGHWAY – HW07 Work type: Clearzone Improvement Works – Trangie to Nevertire Location: 7 to 21km West of Trangie Lane closures: Intermittent. Impact: Delays up to 5 min can be expected during work hours. Speed restrictions: 40, 60 km/h as directed. Working days: Mon to Sat. Working hours: 0700 to 1800 hours Mon to Sat. Expected completion: June 2018 Advice / Comments: Please obey all signs and proceed with care. PRIMARY LOCATION: NEWELL HIGHWAY – HW17 Work type: Heavy Patching Location: 35km South of Dubbo Lane closures: Intermittent. Impact: Delays up to 5 min can be expected during work hours. Speed restrictions: 40, 60 km/h as directed. Working days: Mon to Sat. Working hours: 0700 to 1800 hours Mon to Sat. Expected completion: 5 May 2018 Advice / Comments: Please obey all signs and proceed with care. Page 5 of 13 DUBBO DISTRICT (Inc. Forbes, Cobar, Coolah, Bourke, Parkes, Walgett & Wellington areas) PRIMARY LOCATION: TILPA ROAD – MR61 Work type: Bridge rehabilitation Location: Bridge over Darling River at Tilpa. Lane closures: One lane may be closed during working hours. Portable traffic lights in operation during working hours. Full road closure over Tilba Bridge on 25th, 26th, 27th & 28th May and 22nd, 23rd and 24th June from 7am – 5pm Impact: Delays up to 5 min can be expected on standard days. On days of Bridge Closures, plan to travel via alternate routes and allow additional travel time. Speed restrictions: 40, 60, 80 km/h as directed during work hours. Working days: Mon – Fri Working hours: 0700 – 1800 hours. Expected completion: 30 June 2018. Advice / comments: Please obey all signs and proceed with care. PRIMARY LOCATION: PAYTENS BRIDGE ROAD – LR1570003 Work type: Timber Bridge Rehab. Location: Paytens Bridge, Lachlan River at Collett’s Crossing. Lane closures: One Lane Bridge.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    13 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us