Director's Report

Director's Report

DIRECTOR’S REPORT TRANSPORTATION BOARD MARCH 14, 2016 NEVADA RANKED #1 IN BRIDGE CONDITION US 95 ELECTRIC HIGHWAY UPDATE FEDERAL UPDATE - EARMARKS DESCRIPTION OWNER % REMAINING REMAINING BALANCE CONSTRUCT I 15/ LAS VEGAS BELTWAY CITY OF NLV 59% $5,286,127 INTERCHANGE CONSTRUCT I 15 STARR INTERCHANGE NDOT 41% $2,982,149 CONSTRUCT I 15/LAS VEGAS BOULEVARD NDOT 7% $205,275 INTERCHANGE LAUGHLIN-BULLHEAD CITY: COLORADO RIVER RTC SNV 100% $1,439,840 BRIDGE (CLARK CO.) LAUGHLIN-BULLHEAD CITY: COLORADO RIVER RTC SNV 100% $2,699,700 BRIDGE (CLARK CO.) LAUGHLIN-BULLHEAD CITY: COLORADO RIVER RTC SNV 89% $14,523,450 BRIDGE (CLARK CO.) LAKE MEAD PARKWAY, PHASE 2 DEVELOPER 100% $237,500 TOTAL $27,374,041 FEDERAL UPDATE – TIGER GRANTS • $500M (20% TO BE SPENT IN RURAL AREAS) • $5M MINIMUM AWARD ($1M RURAL) • 20% MATCH REQUIRED (0% RURAL) • APPLICATIONS DUE APRIL 29, 2016 • OBLIGATE BY 9/30/19, EXPEND BY 9/30/24 • HIGHWAY, BRIDGE, PUBLIC TRANSPORTATION, PASSENGER & FREIGHT RAIL, PORT INFRASTRUCTURE, AND INTERMODAL PROJECTS ARE ELIGIBLE FEDERAL UPDATE – FASTLANE GRANTS • NATIONALLY SIGNIFICANT FREIGHT AND HIGHWAY PROJECTS (NSFHP) GRANT PROGRAM IS FASTLANE • $800M ($190M TO BE SPENT OUTSIDE OF URBAN AREAS) • LARGE PROJECTS –$25M - $100M • SMALL PROJECTS – AT LEAST $5M • 40% MATCH REQUIRED (OTHER FEDERAL FUNDS ARE ALLOWED TO MATCH, 80% MAX. TOTAL FED) • APPLICATIONS DUE APRIL 14, 2016 • HIGHWAY FREIGHT PROJECTS ON THE NATIONAL HIGHWAY FREIGHT NETWORK AND HIGHWAY OR BRIDGE PROJECTS ON THE NATIONAL HIGHWAY SYSTEM THAT ADD CAPACITY TO INTERSTATE SYSTEM ARE ELIGIBLE FEDERAL UPDATE – FASTLANE GRANTS NATIONAL HIGHWAY SYSTEM (NHS) IN NEVADA APEX INDUSTRIAL CENTER TRANSPORTATION INVESTMENTS • I-15 AND US 93 IMPROVEMENTS RFP FOR SCOPING, ENVIRONMENTAL AND PRELIMINARY ENGINEERING • WSP PARSONS BRINCKERHOFF SELECTED • NEGOTIATE AGREEMENT AND ANTICIPATE REQUESTING BOARD APPROVAL IN APRIL 2016 I-515 CITY PARKWAY INTERCHANGE BOULDER FALLS ON US 50 NEAR CAVE ROCK PROJECT UPDATES • PEDESTRIAN BRIDGE PROJECT SCHEDULE TO ACCOMMODATE NEW ARENA OPENING PROJECT UPDATES • PROJECT NEON GROUND BREAKING APRIL 7TH • $292.6M HIGHWAY REVENUE IMPROVEMENT AND REFUNDING BONDS SOLD – MORE THAN $14M SAVED PROJECT UPDATES • CARSON FREEWAY HITS MILESTONE PROJECT UPDATES • USA PARKWAY – GROUNDBREAKING SCHEDULED FOR JUNE 10, 2016 – PARTNERING MEETING HELD WITH AMES AND NDOT EXECS AND PROJECT TEAM – RIGHT-OF-WAY ACQUISITIONS CONTINUING RENO SPAGHETTI BOWL UPDATE • HDR IS UNDER CONTRACT FOR THE “CHARRETTE” FOR RENO SPAGHETTI BOWL INTERCHANGE • NDOT AND RTC OF WASHOE COUNTY TO COLLABORATE ON PLANNING DETAILS • APRIL 28TH AT THE RENO-SPARKS CONVENTION CENTER, TENTATIVE DATE & LOCATION • NDOT TRAFFIC STUDY ONGOING; EARLY RECOMMENDATIONS IN SEPTEMBER 2016 REGIONAL PROJECT COORDINATION IN SO. NEVADA • RTC OF SOUTHERN NEVADA LEADS EFFORTS WITH NDOT, CLARK COUNTY, CITIES OF LAS VEGAS, NORTH LAS VEGAS, AND HENDERSON • UTILITY COMPANIES AND DEVELOPERS’ CONTRACTORS ALSO INSTALL WORK ZONES IN STREETS AND HIGHWAYS UNDER NDOT AND LOCAL PUBLIC AGENCY TEMPORARY ENCROACHMENT PERMITS REGIONAL PROJECT COORDINATION IN SO. NEVADA • REGIONAL PROJECT COORDINATION COMMITTEE MEETS MONTHLY – RTC, NDOT, ALL LOCAL PUBLIC WORKS AGENCIES – CLARK COUNTY WATER RECLAMATION DISTRICT, REGIONAL FLOOD CONTROL – UTILITY COMPANIES – PUBLIC AGENCY REPRESENTATIVES KNOWLEDGABLE ABOUT PERMITTED TRAFFIC CONTROL ACTIVITIES ON STATE AND LOCAL ROADS • CONE MANAGEMENT WORKING GROUP MEETS BI-WEEKLY – INCLUDES THE LOCAL PUBLIC AGENCIES – INCLUDES TRAFFIC CONTROL COMPANIES THAT ACTUALLY SET UP DEVICES FOR WORK ZONES REGIONAL PROJECT COORDINATION IN SO. NEVADA www.seeingorange.rtcsnv.com HOTLINE: 702-928-CONE (2633) REGIONAL PROJECT COORDINATION IN SO. NEVADA www.seeingorange.rtcsnv.com REGIONAL PROJECT COORDINATION IN SO. NEVADA • RTC OF SOUTHERN NEVADA PARTNERSHIP WITH WAZE REGIONAL PROJECT COORDINATION IN SO. NEVADA REGIONAL PROJECT COORDINATION IN SO. NEVADA • NEXT STEPS – REGIONAL PROJECT COORDINATION COMMITTEE WILL SET ROLES AND RESPONSIBILITIES FOR ITS MEMBERS – ESTABLISH THE DATA NEEDS FOR THE GROUP – WORK WITH GOOGLE/WAZE TO ENSURE THAT INFORMATION REMAINS ON THE MAP APPLICATION FOR AS LONG AS THE WORK ZONE IS IN PLACE – DISCUSS WAYS TO MINIMIZE DELAY TO THE PUBLIC • EXAMPLE OF BORE PITS FOR A SEWER LINING PROJECT • EXAMPLE OF INCORPORATING UTILITY WORK INTO THE PUBLIC WORKS CONTRACT TO MAXIMIZE THE WORK SCHEDULE • USE MARATHON WORK TO GET IN, GET OUT AND STAY OUT • CONSIDER SPECIFYING REMOVAL OF TRAFFIC CONTROL DEVICES IF NO WORK IS BEING PERFORMED WITHIN A CERTAIN PERIOD OF TIME (PROJECT SPECIFIC) • RTC OF SOUTHERN NEVADA IS HIRING A REGIONAL TRAFFIC CONTROL COORDINATOR RECENT SETTLEMENTS & VERDICTS • NO SETTLEMENTS AT MARCH 2016 BOE QUESTIONS?.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    26 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us