Land Acquisition and Resettlement Plan (LARP) Project number: 46528–002 January 2020 PAK: Jalalpur Irrigation Project Prepared by the Irrigation Department, Government of the Punjab for the Asian Development Bank (ADB). This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. IRRIGATION DEPARTMENT, GOVERNMENT OF THE PUNJAB JALALPUR IRRIGATION PROJECT Updated Land Acquisition and Resettlement Plan (LARP) for ICB-P3 ( RD 225+500 to RD 379+750) (PART-1) June, 2019 NATIONAL ENGINEERING SERVICES PAKISTAN (PVT) LIMITED NESPAK House, 1-C, Block-N, Model Town Extension, Lahore-54700, Pakistan PABX: 92 42 99090000 Fax: 92 42 99231940 E-mail: [email protected] Website: www.nespak.com.pk Sub-Consultants INTEGRATED CONSULTING Technical Resource Services SERVICES (PVT) LIMITED766- (PVT) LIMITED13- L Model G/4 JOHAR TOWN, LAHORE Town Extension, Lahore PAKISTAN JIP-ADB PDA 6006: PAK Detailed Design Land Acquisition and Resettlement Plan of Jalalpur Irrigation Project ICB-P3 - RD 225+500 to RD 379+750 DETAILED DESIGN OF JALALPUR IRRIGATION PROJECT (JIP) LAND ACQUISITION AND RESETTLEMENT PLAN (LARP) June, 2019 Issue/ Date Originator Reviewer Description Revision Final LARP Updated June, Rana Rafaquat Ali (PM) ICB-P3 LARP Abdur Rehman 2019 ICB-P3 (Social Safeguards Specialist) This LARP has been prepared of Main Canal from RD 225+500 to RD 379+750 covering 10distributaries and 8 Flood Carrier Channels (FCCs) for ICB-P3, the titled Project and should not be relied upon or used for any other project without an independent check being carried out as to its suitability and prior written authority of PDA Consultants hired for the purpose. The PDA Consultants accept no responsibility or liability for the consequences of this document being used for a purpose other than the purposes for which it was commissioned. Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm his agreement to indemnify PDA Consultants for all loss or damage resulting therefore. The PDA Consultants accept no further responsibility or liability for this document to any party other than the person by whom it was commissioned. NESPAK with sub-consultants ICS and TRS i JIP-ADB PDA 6006: PAK Detailed Design Land Acquisition and Resettlement Plan of Jalalpur Irrigation Project ICB-P3 - RD 225+500 to RD 379+750 IMPORTANT FOR REVIEWER/READER Due to huge data of Annexure-II (Land Record Data), the LARP is devided into two Parts: Part-1 Comprises main text Chapters 1 to 9, Appendix and all Annexures except Annexure-II Part-2 Annexure-II, it comprises all data of land to be acquired along with DPs and compensation of land, crop and trees etc. NESPAK with sub-consultants ICS and TRS ii JIP-ADB PDA 6006: PAK Detailed Design Land Acquisition and Resettlement Plan of Jalalpur Irrigation Project ICB-P3 - RD 225+500 to RD 379+750 PART-1 NESPAK with sub-consultants ICS and TRS iii JIP-ADB PDA 6006: PAK Detailed Design Land Acquisition and Resettlement Plan of Jalalpur Irrigation Project ICB-P3 - RD 225+500 to RD 379+750 ADB PDA 6006: PAK Detailed Design of Jalalpur Irrigation Project LAND ACQUISITION AND RESETTLEMENT PLAN TABLE OF CONTENTS Page No. LIST OF CONTENTS ............................................................................................................................... i LIST OF ANNEXURES .......................................................................................................................... iii LIST OF TABLES ................................................................................................................................... iv LIST OF FIGURES .................................................................................................................................. v ABBREVIATIONS ................................................................................................................................ viii DEFINITIONS OF TERMS ..................................................................................................................... ix EXECUTIVE SUMMARY .................................................................................................................. ES-1 1. INTRODUCTION ......................................................................................................................... 1-1 1.1 BACKGROUND .................................................................................................................. 1-1 1.2 DESIGN LEVEL DETAILS .................................................................................................. 1-2 1.3 ROW AND MEASURES TO MINIMIZE RESETTLEMENT IMPACTS ............................... 1-3 1.4 OBJECTIVE OF THE LARP ............................................................................................... 1-3 1.5 RESETTLEMENT PROCESSING REQUIREMENTS ........................................................ 1-4 2. SCOPE OF LAND ACQUISITION AND RESETTLEMENT ....................................................... 2-1 2.1 APPROACH AND METHODOLOGY ................................................................................. 2-1 2.1.1 Collection and Review of Secondary Data/Information .................................................. 2-2 2.1.2 Pre-Test of Questionnaires ............................................................................................ 2-2 2.1.3 Collection of Primary Data .............................................................................................. 2-2 2.2 PROJECT IMPACTS ASSESSMENT ................................................................................ 2-4 2.2.1 Impact on Private Land .................................................................................................. 2-4 2.2.2 Project Impact on Government Land.............................................................................. 2-6 2.2.3 Impact on Private Residential structures, Cattlesheds and Fixtures .............................. 2-6 2.2.4 DPs‟ Assessment of Relocation ..................................................................................... 2-6 2.2.5 Impact on Crops ............................................................................................................. 2-7 2.2.6 Impacts on Private Owned Non-Fruit Trees ................................................................... 2-7 2.2.7 Impacts on Fruit Trees .................................................................................................. 2-8 2.2.8 Impacts on Government Trees ...................................................................................... 2-8 2.2.9 Impact on Public Structures ........................................................................................... 2-8 2.2.10 Impact on Community Structures ............................................................................... 2-9 2.3 SOCIO-ECONOMIC CHARACTERISTICS OF THE DPS‟ HOUSEHOLDS ...................... 2-9 2.3.1 Household Composition and Working Household Members ......................................... 2-9 2.3.2 Education and Literacy Level of Household Members ................................................... 2-9 2.4 OCCUPATION, INCOME AND EXPENDITURE OF THE SAMPLE RESPONDENTS ... 2-10 2.4.1 Income of the Respondents ......................................................................................... 2-12 2.4.2 Expenditures of Respondents ...................................................................................... 2-12 2.4.3 Land Holding Status of Respondents ........................................................................... 2-13 2.4.4 Vulnerable DPs............................................................................................................. 2-13 2.4.5 Indigenous People ........................................................................................................ 2-14 2.4.6 Available Social Amenities in the Project Area ............................................................ 2-14 2.4.7 Housing Conditions ...................................................................................................... 2-15 2.5 GENDER SURVEY ........................................................................................................... 2-15 2.5.1 Women‟s Role in Socio-economic Activities ................................................................ 2-17 NESPAK with sub-consultants ICS and TRS iv JIP-ADB PDA 6006: PAK Detailed Design Land Acquisition and Resettlement Plan of Jalalpur Irrigation Project ICB-P3 - RD 225+500 to RD 379+750 2.6 CONFLICT RESOLUTION MECHANISM IN THE PROJECT AREA ............................... 2-18 2.7 ASSET VALUATION ......................................................................................................... 2-18 2.7.1 Valuation of Land ......................................................................................................... 2-18 2.7.2 Valuation of Structures ................................................................................................
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages186 Page
-
File Size-