Final Updated Environmental and Social Impact Assessment

Final Updated Environmental and Social Impact Assessment

Final Updated Environmental and Social Impact Assessment Aurora Gold Project Prepared for Guyana Goldfields, Inc. Georgetown, Guyana Toronto, ON Prepared by: ENVIRON International Corporation Washington, DC Seattle, WA July 2013 Project Number: 01-25901A1 1 Introduction 1-1 1.1 General Background 1-1 1.2 Regulatory Setting 1-6 1.3 Resolution of Comments from IFC Review of ERM (2010) 1-8 1.4 Organization of ESIA Report 1-21 2 Project Description 2-1 2.1 Project Setting 2-2 2.1.1 Geographical and Geological Setting 2-1 2.1.2 Environmental Setting 2-6 2.1.3 Social Setting 2-6 2.2 Early Works Construction Phase 2-9 2.3 Major Construction Phase 2-9 2.3.1 Cuyuni River Dike Construction, Airstrip Renovation, and Open Pit Area Clearances 2-9 2.3.2 Mine Waste Rock Stockpile Footprint Preparation 2-12 2.3.3 Mill Area Infrastructure Construction 2-12 2.3.4 Tailings and Reclaim Pipeline and Initioal Tail Mining Area (TMA Clearance and Construction 2-14 2.3.5 MWP and Fresh Water Pond (FWP) Clearance and Construction 2-15 2.3.6 Underground Mine Construction 2-15 2.3.7 Man-Camp Completion 2-15 2.3.8 Decommissioning and Closure of Tapir Camp 2-16 2.3.9 Final Construction Activities, Buckhall 2-16 2.4 Operational Phase 2-17 2.4.1 Power Generation 2-17 2.4.2 Open Pit Mining Operations 2-17 2.4.3 Underground Mining Operations 2-18 2.4.4 Mineral Processing Operations 2-20 2.5 Decommissioning, Reclamation, and Closure Phase 2-23 2.6 Post-closure Phase 2-29 ENVIRON 3 Alternatives Assessment 3-2 3.1 Environmental Footprint Reduction 3-2 3.2 Description of Changes in Major Project Components 3-2 3.2.1 Open Pits 3-9 3.2.2 Tailings Mining Area (TMA) 3-9 3.2.3 Mine Water Management, Diversion, and Fresh Water Ponds 3-9 3.2.4 Waste Rock, Saprolite, and Overburden Stockpiles 3-10 3.2.5 Man Camp 3-10 3.2.6 Airstrip 3-10 3.2.7 General Industrial Areas – Mineral Processing and Support Facilities 3-10 3.2.8 Cuyuni River Dike System 3-10 3.2.9 Internal Roads 3-10 3.2.10 Power Generation Alternatives, Energy Demand, and Fuelling Schemes 3-11 3.2.11 Access to Aurora Site 3-11 3.3 Summary of Advantaages of the Selected Alternatives 3-11 4 Environmental Baseline 4-6 4.1 Area of Influence 4-9 4.2 History of Baseline Data Collection 4-12 4.2.1 Groundwater Sampling 4-12 4.2.2 Surface Water/Sediment Sampling 4-12 4.2.3 Biological Sampling 4-12 4.3 Climate 4-14 4.4 Air Quality 4-17 4.5 Hydrology 4-18 4.5.1 Surface Waters 4-18 4.5.2 Groundwater 4-21 4.5.3 2011 Investigation 4-24 4.6 Water Quality 4-27 4.7 Geology 4-43 4.7.1 Structural Geology 4-44 4.7.2 Geomorphology and Soils 4-47 4.7.3 Acid Rock Drainage and Metal Leaching Studies 4-49 4.8 Biodiversity 4-49 4.8.1 Scope of Biodiversity Assessment 4-49 4.8.2 General Characterization of the Region 4-50 4.8.3 Biological Sampling of the Study Area 4-52 4.8.4 Regional and Biogeographic Settings 4-53 4.8.5 Biological Sampling Methodologies 4-58 4.8.6 Biological Sampling Results 4-65 4.8.7 Fish 4-70 4.8.8 Amphibians 4-73 4.8.9 Non-avian Reptiles 4-76 4.8.10 Birds 4-78 4.8.11 Mammals 4-90 4.8.12 Species Accumulation Curves 4-95 ENVIRON 4.8.13 Invasive Alien Species 4-96 4.8.14 Critical Habitat Assessment 4-96 4.8.15 Legally Protected and Internationally Recognized Areas 4-116 4.8.16 Ecosystem Services 4-119 5 Socioeconomic Baseline 5-1 5.1 Introduction and Methodology 5-1 5.2 National Context 5-2 5.3 Regional Context 5-2 5.4 Social Area of Influence 5-3 5.5 Communities Studied in the Baseline 5-5 5.5.1 Communities in the DAI 5-5 5.5.2 Detailed Baseline for Communities in the Project’s DAI 5-6 5.5.3 Communities in the Project’s IAI 5-20 5.5.4 Other Project Beneficiaries 5-22 5.5.5 Summary of Findings 5-24 6 Risk and Impact Assessment 6-2 6.1 Introduction 6-2 6.2 Application of the Mitigation Hierarchy in Development of Project Design 6-3 6.3 Risk and Impact Assessment Methodology 6-4 6.3.1 Risk and Impact Screening 6-4 6.3.2 Quantification of Risk and Impact Significance 6-4 6.3.3 Consideration of Residual Impacts 6-23 6.4 Cumulative Impacts 6-24 6.4.1 Definition and Assessment Approach 6-13 6.4.2 Cumulative Impacts on the Physical and Biological Environment 6-14 6.4.3 Cumulative Socioeconomic Impacts 6-15 7 Assessment and Management Environmental and Social Risks (Ref: IFC PS-1) 7-2 7.1 Summary of PS 1 Requirements 7-2 7.2 Project ESMS Description 7-2 7.2.1 ESMS Plan 7-9 7.2.2 Management and Mitigation Plans 7-9 7.2.3 Standard Operating Procedures 7-16 8 Labor and Working Conditions (Ref: IFC PS-2) 8-2 8.1 Summary of PS 2 Requirements 8-2 8.2 Working Conditions and Management of Workforce Relationships 8-2 8.2.1 Human Resources Policies and Procedures 8-2 8.2.2 Working Conditions and Terms of Employment 8-3 8.2.3 Workers’ Organizations 8-4 8.2.4 Non-Discrimination and Equal Opportunity 8-4 8.2.5 Retrenchment 8-4 8.2.6 Grievance mechanism 8-5 8.3 Workforce Protection 8-5 ENVIRON 8.4 Occupational Health and Safety 8-5 8.5 Workers Engaged by Third Parties 8-9 8.6 Supply Chain Considerations 8-10 9 Resource Efficiency and Pollution Prevention (Ref: IFC PS-3) 9-3 9.1 Summary of PS 3 Requirements 9-3 9.2 General Resource Efficiency Considerations 9-3 9.2.1 Power Generation, Fuel Use, and Minimization of GHG Emissions 9-4 9.2.2 Use of Water Resources 9-4 9.3 Polllution Prevention 9-9 9.3.1 Air Quality Management Strategy 9-10 9.3.2 Water Quality Management 9-10 9.3.3 Land Impact Management Strategy 9-33 9.4 Management of Pesticides 9-38 10 Community Health, Safety and Security (Ref: IFC PS-4) 10-2 10.1 Summary of PS 4 Requirements 10-2 10.2 General Considerations – Health and Safety of Affected Communities 10-2 10.3 Safety Considerations in Infrastructure and Equipment Design 10-2 10.4 Hazardous Materials Management 10-5 10.5 Adverse Community Health and Safety Risk in Provisioning and Regulating (Ecosystem) Services 10-8 10.6 Community Exposure to Disease 10-9 10.6 Emergency Preparedness and Response 10-10 10.7 Security Services 10-11 11 Land Acquisition and Involuntary Resettlement (Ref: IFC PS-5) 11-2 11.1 Summary of PS 5 Requirements 11-2 11.2 Applicability of PS 5 to Project 11-2 11.3 Displacement Potential in Project Design 11-4 11.4 Compensation and Benefits for Displaced Persons 11-4 11.5 Community/Stakeholder Engagment 11-5 11.6 Grievance Mechanisms 11-5 11.7 Resettlement and Livelihood Restoration Considerations 11-5 12 Biodiversity Conservation and Sustainable Natural Resource Management (Ref: IFC PS-6) 12-2 12.1 Summary of PS 6 Requirements 12-2 12.2 Protection and Conservation of Biodiversity 12-3 12.2.1 Modified Habitat 12-3 12.2.2 Natural Habitat 12-3 12.2.3 Critical Habitat 12-4 12.3 Invasive Alien Species 12-4 12.4 Management of Ecosystem Services 12-5 12.5 Sustainable Management of Living Natural Resources 12-6 ENVIRON 12.6 Supply Chain Considerations 12-6 13 Indigenous Peoples (Ref: IFC PS-7) 13-1 13.1 Summary of PS 7 Requirements 13-1 13.2 Applicability of PS 7 to Aurora Gold Project 13-1 13.3 Other Considerations Involving Idigenous Peoples 13-4 14 Cultural Heritage (Ref: IFC PS-8) 14-1 14.1 Description of Cultural Heritage Considerations in Area Affected by Project 14-1 14.2 Protective Measures for Cultural Artifacts 14-2 15 Master Reference List 15-2 List of Tables Table 1.2-1: Summary of Major Permit and License Requirements - Aurora Gold Project Table 1.3-1: Concordance Table: Resolution of IFC Comments on Original ESIA Table 2.1.3.2-1: Estimated Life of Mine Staffing Levels – Aurora Gold Project Table 3.1: Comparison of Major Project Alternatives Table 3.1.2: Comparison of Modified and natural Habitats and Streams to Be Converted by Mine Footprint and Internal Roads for July 2010 and January 2013 Site Layouts Table 4.2-1: History of biodiversity field surveys in the vicinity of the Aurora Project site, 2006 to 2012 Table 4.3-1: Summary of average monthly climate data from the Aurora Station from June 2006 to September 2011 Table 4.3-2: Overall 2006-2011 summary of available climate data from the Aurora Station Table 4.5-1: Depth to groundwater in meters Table 4.5-2: Summary of hydraulic conductivities in centimeters per second Table 4.5-3: Locations, depths, and identification of well nests at Aurora and formation in which each is screened Table 4.5-4: Groundwater elevations and hydraulic conductivity in centimeters per second (cm/s) for each screened geologic formation at Aurora Table 4.6-1: Surface water analytical results in milligrams per liter (mg/L), February 10, 2006 Table 4.6-2: Surface water analytical results in milligrams per liter (mg/L), July 6, 2006 Table 4.6-3: Surface water analytical results in milligrams per liter (mg/L), October 12, 2006 Table 4.6-4: Surface water analytical results in milligrams per liter (mg/L), March 4, 2007 Table 4.6-5: 2009 Surface water analytical results Table 4.6-6: 2009 sediment analytical results ENVIRON Table 4.6-7: Results of analytical tests on surface water samples at Aurora (2011).

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    421 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us