DATE: 05-16-2018 LOCATION RESTRICTION DATE CONTRACTOR PHILADELPHIA *I-95 North ITS Installation: LANE CLOSURE Between 5/14/18-5/15/18 Miller Bros

DATE: 05-16-2018 LOCATION RESTRICTION DATE CONTRACTOR PHILADELPHIA *I-95 North ITS Installation: LANE CLOSURE Between 5/14/18-5/15/18 Miller Bros

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 6-0 PHILADELPHIA REGION TRAFFIC BULLETIN NOTE: SCHEDULES ARE SUBJECT TO CHANGE PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX-ROAD TO CHECK REAL-TIME HIGHWAY CONDITIONS VISIT 511PA.COM; DOWNLOAD THE 511PA APP; OR CALL 5-1-1 DATE: 05-16-2018 LOCATION RESTRICTION DATE CONTRACTOR PHILADELPHIA *I-95 North ITS Installation: LANE CLOSURE between 5/14/18-5/15/18 Miller Bros. Wanamaker Ave. & Philadelphia International Airport. 9 PM - 5 AM. Aramingo Ave. on-ramp to I-95 Deck & Joint Repair: RAMP CLOSED & DETOURED. 5/14/18 & 5/16/18 Maintenance South & Betsy Ross Bridge 8 PM - 5 AM. DETOUR POSTED. *US 1 N & S (Roosevelt Extension) Drain Cleaning/Debris Removal: INTERMITTENT 5/14/18-5/17/18 Maintenance LANE RESTRICTIONS between I-76 & 9th St. 9:30 AM - 2 PM. *I-676 E & W Drain Cleaning/Debris Removal: INTERMITTENT 5/14/18-5/17/18 Maintenance LANE RESTRICTIONS between I-76 & I-95. 9:30 AM - 2 PM. *I-95 N & S Drain Cleaning/Debris Removal: INTERMITTENT 5/14/18-5/17/18 Maintenance LANE RESTRICTIONS between Phila. Int. Airport & PA 63 (Woodhaven Rd.). 9:30 AM - 2 PM. *I-76 E & W Drain Cleaning/Debris Removal: INTERMITTENT 5/14/18-5/17/18 Maintenance LANE RESTRICTIONS between US 1 (City Ave.) & 26th St. 9:30 AM - 2 PM. *I-76 West Viaduct Construction: LANE CLOSURE between 5/14/18-5/17/18 Buckley & Company, South St. & I-676 Interchanges. 9 PM - 5 AM. Inc. *I-676 E & W Clean-up & Removal of Shielding: CLOSED & 5/14/18-5/17/18 Buckley & Company, DETOURED between I-76 & Broad St. (PA 611). 11 Inc. PM - 5 AM. DETOUR POSTED. 5/16/2018 Page 1 of 33 LOCATION RESTRICTION DATE CONTRACTOR Passyunk Ave. Bridge Rehabilitation: RIGHT LANE CLOSED on Hon. 5/14/18-5/18/18 Buckley & Company, Robert C. Donatucci Memorial Bridge over Schuylkill Inc. River. 9 AM - 3 PM. Walnut Lane Debris Removal & Concrete Repair: LANE 5/14/18-5/18/18 Buckley & Company, CLOSURES between Magdelena St. & Park Lane Inc. Drive. Weekdays. 9 AM - 3 PM. JFK Blvd. East Bridge Rehabilitation: CLOSED & DETOURED 5/14/18-5/18/18 Abbonizio between 20th St. & Schuylkill Ave. 7 AM - 5 PM. Contractors, Inc. DETOUR POSTED. Lewis St./Wheatsheaf Lane Shared Pathway: PARKING LANE CLOSED between 5/14/18-5/18/18 James J. Anderson Aramingo Ave. & Delaware Ave. 9 AM - 3 PM. Lincoln Drive Roadwork: CLOSED & DETOURED between Ridge 5/14/18-5/18/18 A.P. Construction, Pike & Wayne Ave. 9 PM - 6 AM. DETOUR Inc. POSTED. Academy Rd. Paving: LANE RESTRICTIONS between I-95 & 5/14/18-5/18/18 James J. Anderson Knights Rd. 7 PM - 5 AM. Academy Rd. Prep: LANE RESTRICTIONS between I-95 & Knights 5/14/18-5/18/18 James J. Anderson Rd. 9 AM - 3 PM. Knights Rd. Paving: LANE RESTRICTIONS between Frankford 5/14/18-5/18/18 James J. Anderson Ave. & Bucks County line. 7 PM - 5 AM. *I-95 North Light Installation: RIGHT LANE CLOSURE between 5/14/18-6/1/18 PKF MARK III,INC. Washington Ave. & Columbus Blvd. Weeknights. 9PM - 5AM. PA 63 West (Woodhaven Rd.) Sign Structure Inspection: RIGHT LANE CLOSED 5/15/18 Pickering, Corts & between I-95 & US 1 (Roosevelt Blvd.). 9 AM - 12 PM. Summerson *US 1 South (East Roosevelt Blvd.) Sign Structure Inspection: RIGHT LANE CLOSED 5/15/18 Pickering, Corts & between Old Lincoln Hwy. & Southampton Rd. 12 PM - Summerson 3 PM. 5/16/2018 Page 2 of 33 LOCATION RESTRICTION DATE CONTRACTOR Vine St. Sign Structure Inspection: TWO RIGHT LANES 5/16/18 Pickering, Corts & CLOSED between PA 611 (North Broad St.) & North Summerson 13th St. 9 AM - 10 AM. Vine St. Sign Structure Inspection: TWO CENTER LANES 5/16/18 Pickering, Corts & CLOSED between PA 611 (North Broad St.) & North Summerson 13th St. 10 AM - 11 AM. Vine St. Sign Structure Inspection: LEFT LANE CLOSED 5/16/18 Pickering, Corts & between PA 611 (North Broad St.) & North 13th St. 11 Summerson AM - 1 PM. North 8th St. Sign Structure Inspection: TWO LEFT LANES 5/16/18 Pickering, Corts & CLOSED between Vine St. & Race St. 1 PM - 2 PM. Summerson North 8th St. Sign Structure Inspection: TWO RIGHT LANES 5/16/18 Pickering, Corts & CLOSED between Vine St. & Race St. 2 PM - 3 PM. Summerson Betsy Ross off-ramp to Aramingo Sign Structure Inspection: RIGHT LANE CLOSED on 5/17/18 Pickering, Corts & Ave. the ramp. 9 AM - 10 AM. Summerson *I-95 on-ramp from Aramingo Ave. Sign Structure Inspection: RIGHT LANE CLOSED on 5/17/18 Pickering, Corts & the ramp. 10 AM - 11 AM. Summerson Callowhill St. Sign Structure Inspection: RIGHT LANE CLOSED 5/17/18 Pickering, Corts & between 4th St. & 6th St. 11 AM - 12 PM. Summerson Callowhill St. Sign Structure Inspection: TWO LEFT LANE CLOSED 5/17/18 Pickering, Corts & between 4th St. & 6th St. 12 PM - 1 PM. Summerson Callowhill St. Sign Structure Inspection: TWO CENTER LANES 5/17/18 Pickering, Corts & CLOSED between 4th St. & 6th St. 2 PM - 3 PM. Summerson *I-76 East Bridge Inspection: RIGHT LANE CLOSED between 5/17/18-5/18/18 Pickering, Corts & South St. & 28th St. Interchanges. 9 AM - 3 PM. Summerson 5/16/2018 Page 3 of 33 LOCATION RESTRICTION DATE CONTRACTOR Allegheny Ave. Milling & Paving: LANE RESTRICTIONS between 17th 5/16/18-5/21/18 New Courtland at St. & 20th St. Weeknights. 7 PM - 5 AM. Allegheny, Inc. State Rd. North Bridge Inspection: RIGHT LANE CLOSED between 5/18/18 Pickering, Corts & Rhawn St. & Ashburner St. 8 AM - 12 PM. Summerson State Rd. South Bridge Inspection: RIGHT LANE CLOSED between 5/18/18 Pickering, Corts & Ashburner st. & Rhawn St. 11 AM - 4 PM. Summerson *I-676 West Bridge Inspection: RIGHT LANE CLOSED between I- 5/19/18 Pickering, Corts & 95/Ben Franklin Bridge & Ben Franklin Parkway exits. Summerson 8 AM - 4 PM. *I-676 East Bridge Inspection: RIGHT LANE CLOSED between 5/19/18 Pickering, Corts & Ben Franklin Parkway/23rd St. & 8th St. exits. 8 AM - Summerson 4 PM. *I-76 E & W Viaduct Construction: LANE CLOSURE between 5/21/18-5/24/18 Buckley & Company, South St. & I-676 Interchanges. 9 PM - 5 AM. Inc. *I-76 West off-ramp to 30th St. Viaduct Construction: RAMP CLOSED & 5/21/18-5/24/18 Buckley & Company, DETOURED. 9 PM - 5 AM. DETOUR POSTED. Inc. Enterprise Ave. on-ramp to I-95 Steel Repairs: SHOULDER CLOSURE on the ramp. 5/21/18-5/25/18 PennDOT North Weekdays. 9 AM - 3 PM. *I-95 North Steel Repairs: SHOULDER CLOSURE between 5/21/18-5/25/18 PennDOT Enterprise Ave. & Girard Point Bridge. Weekdays. 9 AM - 3 PM. Passyunk Ave. Bridge Rehabilitation: RIGHT LANE CLOSED on Hon. 5/21/18-5/25/18 Buckley & Company, Robert C. Donatucci Memorial Bridge over Schuylkill Inc. River. 9 AM - 3 PM. Walnut Lane Debris Removal & Concrete Repair: LANE 5/21/18-5/25/18 Buckley & Company, CLOSURES between Magdelena St. & Park Lane Inc. Drive. Weekdays. 9 AM - 3 PM. 5/16/2018 Page 4 of 33 LOCATION RESTRICTION DATE CONTRACTOR Academy Rd. Prep: LANE RESTRICTIONS between I-95 & Knights 5/21/18-5/25/18 James J. Anderson Rd. 9 AM - 3 PM. Academy Rd. Paving: LANE RESTRICTIONS between I-95 & 5/21/18-5/25/18 James J. Anderson Knights Rd. 7 PM - 5 AM. South Phila. Access Rd. Milling & Paving: LANE CLOSURE between Walt 5/21/18-5/25/18 Tony DePaul & Son Whitman Bridge & Oregon Ave. 7 AM - 4 PM. US 13 (33rd St.) Utility Installation: CLOSED & DETOURED at 5/29/18-6/22/18 Philadelphia Water Diamond St. Weekdays. 9 AM - 3 PM. DETOUR Department POSTED. Passyunk Ave. Stage Change: 24-HOUR BRIDGE CLOSURE. USE 6/8/18-6/11/18 Buckley & Company, PLATT BRIDGE. Friday 7 PM thru Monday 5 AM. Inc. DETOUR POSTED. South Delaware Ave. Milling & Paving: LANE CLOSURE between Walt 5/7/18-5/25/18 Tony DePaul & Son Whitman Bridge & Oregon Ave. Weekdays. 7 AM - 4 PM. Roosevelt Blvd. N & S ADA Ramp Construction: LANE CLOSURE between 5/1/18-5/18/18 A.P. Construction, Grant Ave. & Red Lion Rd. 7 AM - 4 PM. Inc. *US 1 E & W (City Ave.) Core Boring: LANE RESTRICTIONS between 5/1/18-6/1/18 City Avenue Special Wynnewood Ave. & North 51st St. Weekdays. 9 AM - Services 3 PM. Roosevelt Blvd. N & S ADA Ramp Construction: LANE CLOSURE at Grant 5/1/18-6/12/18 A.P. Construction, Ave. & Red Lion Rd. 9 AM - 3 PM. Inc. Enterprise Ave. on-ramp to I-95 Steel Repairs: SHOULDER CLOSURE on the ramp. 4/12/18-5/11/18 PennDOT North Weekdays. 9 AM - 3 PM. *I-95 North Steel Repairs: SHOULDER CLOSURE between 4/12/18-5/11/18 PennDOT Enterprise Ave. & Girard Point Bridge. Weekdays. 9 AM - 3 PM. 5/16/2018 Page 5 of 33 LOCATION RESTRICTION DATE CONTRACTOR Enterprise Ave. on-ramp to I-95 Steel Repairs: SHOULDER CLOSURE on the ramp. 4/12/18-5/18/18 PennDOT North Weekdays. 9 AM - 3 PM. *I-95 North Steel Repairs: SHOULDER CLOSURE between 4/12/18-5/18/18 PennDOT Enterprise Ave. & Girard Point Bridge. Weekdays. 9 AM - 3 PM. Market St. East on-ramp to I-95 Light Installation: SHOULDER CLOSURE between 4/2/18-6/30/18 PKF MARK III,INC. South Market St. Eastbound & I-95 South. 6 AM - 4:30 PM. I-95 North ramp from S. Christopher Light Installation: SHOULDER CLOSURE on the 4/2/18-6/30/18 PKF MARK III,INC.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    33 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us