
FC 1-300-09N 1 May 2014 Change 6, 9 July 2021 FACILITIES CRITERIA (FC) NAVY AND MARINE CORPS DESIGN PROCEDURES APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED FC 1-300-09N 1 May 2014 Change 6, 9 July 2021 FACILITIES CRITERIA (FC) NAVY AND MARINE CORPS DESIGN PROCEDURES Any copyrighted material included in this FC is identified at its point of use. Use of the copyrighted material apart from this FC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND (Preparing Activity) AIR FORCE CIVIL ENGINEER CENTER Record of Changes (changes are indicated by \1\ ... /1/) Change No. Date Location 1 1 Apr 2015 Added Building Information Management/Modeling (BIM) Requirements to Chapter 12 Updated Drawing Requirements for Chapter 12 Updated Special Inspection Requirements Added eOMSI Facility Data Workbook to Design Phase Chapters 2 1 Sep 2015 Revised Posting of Controlled, Unclassified Information in Chapter 2, clarified signature requirements in Chapter 12, and updated BIM submittal requirements. 3 1 Apr 2018 Cybersecurity: added new paragraphs 1-4, 5-9, 13-5.3 and 14-3.3. Fire Protection: changes to or added new paragraphs 4- 6, 5-8, 6-8, 7-5, 7-9, 17-14, 17-15. Low Impact Development: changes to 6-6.1, 19-1. Sustainability: changes to 5-3, 13-6, 14-4.3, 14-7, 15- 2.1, 16-2.2, 16-5.2, 16-11, 17-3, 17-7.2, 19-1.1, 19-1.4. SI Definitions: 2-2.2. Changes to 12-3.6.1, 12-4.1, 13-3.4, 17-4.1, App. A and B, and other minor changes throughout. 4 14 Jun 2018 Revised Chap. 13 and Added App. D and Landscape Architecture requirements; coordinated minor changes throughout. Deleted Chapter 9 paragraphs for Success and PACES, and added AACE reference. FC 1-300-09N 1 May 2014 Change 6, 9 July 2021 5 9 Nov 2020 Removed references to cancelled ECBs: Updated SAPF requirements in paragraph 3-2.8; added detailed requirements to Chapter 9; revised paragraph 13-9.4 to reference UFC 3-701-01; and updated Appendix D. 6 9 July 2021 Incorporated BIM and Cost requirements from cancelled ECBs, clarified eOMSI requirements, updated Sustainability reporting requirements, updated Appendix D, and added Appendix E. This FC supersedes UFC 1-300-09N, dated 25 May 2005, with Changes 1-9. FC 1-300-09N 1 May 2014 Change 6, 9 July 2021 This Page Intentionally Left Blank FC 1-300-09N 1 May 2014 Change 6, 9 July 2021 FOREWORD Facilities Criteria (FC) provide functional requirements (i.e., defined by users and operational needs of a particular facility type) for specific DoD Component(s), and are intended for use with unified technical requirements published in DoD Unified Facilities Criteria (UFC). FC are applicable only to the DoD Component(s) indicated in the title, and do not represent unified DoD requirements. Differences in functional requirements between DoD Components may exist due to differences in policies and operational needs. All construction outside of the United States is also governed by Status of Forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA.) Therefore, the acquisition team must ensure compliance with the most stringent of the UFC (replace w/ FC), the SOFA, the HNFA, and the BIA, as applicable. Because FC are coordinated with unified DoD technical requirements, they form an element of the DoD UFC system applicable to specific facility types. The UFC system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applicable to the Military Departments, Defense Agencies, and the DoD Field Activities. The UFC System also includes technical requirements and functional requirements for specific facility types, both published as UFC documents and FC documents. FC are living documents and will be periodically reviewed, updated, and made available to users as part of the Services’ responsibility for providing criteria for military construction. Headquarters, U.S. Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Command (NAVFAC), and the Air Force Civil Engineer Center (AFCEC) are responsible for administration of the UFC system. Defense agencies should contact the preparing service for document interpretation and improvements. Technical content is the responsibility of the cognizant DoD working group. Recommended changes with supporting rationale should be sent to the respective service proponent office by the following electronic form: Criteria Change Request. The form is also accessible from the Internet site listed below. FC are effective upon issuance and are distributed only in electronic media from the following source: • Whole Building Design Guide web site http://www.wbdg.org/ffc/dod/. Refer to UFC 1-200-01, General Building Requirements, for implementation of new issuances on projects. AUTHORIZED BY: JOSEPH E. GOTT, P.E. Chief Engineer Naval Facilities Engineering Systems Command FC 1-300-09N 1 May 2014 Change 6, 9 July 2021 FACILITIES CRITERIA (FC) REVISION SUMMARY SHEET Document: FC 1-300-09N, Navy and Marine Corps Design Procedures Superseding: UFC 1-300-09N, Design Procedures, 25 May 2005, with Changes 1-9 Description: This FC provides specific guidance on how and when to provide a project design deliverable for NAVFAC. This document is organized into design deliverables and design phases. Requirements for design deliverables, beyond or in more detail of what is already required by a Core UFC, are provided for NAVFAC-only. The requirements for when or to what extent these deliverables are provided are in the Phase chapters. Reasons for Document: • Update procedures to coordinate with current commercial and government standards, procedures, and governing UFC’s. • Update sustainable documents and requirements to coordinate with UFC 1-200- 02. Impact: • Improve efficiency and consistency of design procedures across NAVFAC. Unification Issues Design and Submittal procedures contained herein are pertinent to standards, software, and templates used, required, and unified within NAVFAC, and centered around the NAVFAC organization and operation. Procedures for NAVFAC may not work for USACE and Air Force operations due to organizational and operational differences. Similar uniform standardization and procedures are not available from the other Services. FC1-300-09N 1 May 2014 Change 6, 9 July 2021 TABLE OF CONTENTS INTRODUCTION ....................................................................................... 1 PURPOSE AND SCOPE. .......................................................................... 1 Organization of Document. .................................................................... 1 APPLICABILITY. ....................................................................................... 1 GENERAL BUILDING REQUIREMENTS. ................................................ 1 CYBERSECURITY. ................................................................................... 1 EXCEPTIONS. ........................................................................................... 2 REFERENCES. ......................................................................................... 2 GLOSSARY. .............................................................................................. 2 POLICY ...................................................................................................... 3 CRITERIA. ................................................................................................. 3 METRIC POLICY. ...................................................................................... 3 SI Definitions. ......................................................................................... 3 General Policy. ...................................................................................... 3 OWNERSHIP OF PROJECT DOCUMENTS AND DATA. ........................ 4 OPERATION SECURITY (OPSEC)........................................................... 4 OPSEC Review. .................................................................................... 4 Mission Information. ............................................................................... 4 Information Compilation. ........................................................................ 4 Sensitive or Critical Information. ............................................................ 4 REGISTRATION. ....................................................................................... 5 Certification. ........................................................................................... 6 PROHIBITION OF POSTING CONTROLLED UNCLASSIFIED INFORMATION DESIGN DELIVERABLES ON UNSECURED SERVERS. .............................................................................................. 6 DESIGN DELIVERABLES FOR NAVAL CONSTRUCTION FORCES - MARINE LOGISTICS GROUPS AND NAVY CONSTRUCTION BATTALIONS (SEABEES). .................................................................... 6 OVERSEAS LOCATIONS TRANSLATIONS. ........................................... 6 ROLES AND RESPONSIBILITIES ............................................................ 9 DESIGNER OF RECORD \1\(DOR)/1/. ..................................................... 9 Coordination with Command, Major Claimant, Region, and Activity. ..... 9 i FC1-300-09N 1 May 2014 Change 6, 9 July 2021 Coordination with Other Government Organizations. ............................ 9 Document Review and Checking System. ............................................. 9 Response
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages218 Page
-
File Size-