London Borough of Tower Hamlets TRAFFIC MANAGEMENT ORDER 2015 No.78 -------------------------------------------------------------------------------------------------------------- The Tower Hamlets (Waiting and Loading Restriction) (No.1) Order 2015 (Amendment No.1) Order 2015 No.78 Made: 06th July 2015 Coming into Operation: 27th July 2015 -------------------------------------------------------------------------------------------------------------- The London Borough of Tower Hamlets, after consulting the Commissioner of Police of the Metropolis, in exercise of the powers conferred by Sections 6 and 124 of and Part IV of Schedule 9 of the Road Traffic Regulation Act 1984 (a) as amended by Section 8 of and Part 1 of Schedule 5 of the Local Government Act 1985 (b) and the Traffic Management Act 2004 (c) and all other powers thereunto enabling hereby, make the following order: - 1. This Order shall come into operation on 27th July 2015 and may be cited as the Tower Hamlets (Waiting and Loading Restriction) (No.1) Order 2015 (Amendment No.1) Order 2015 No.78 2. In this Order the expression "Enactment" means any enactment, whether public, general or local, and includes any order, by law, rule, regulation scheme or other instrument having effect by virtue of an enactment and any reference in this Order to any enactment shall be construed as a reference to that enactment as amended, applied, consolidated, re-enacted by or as having effect by virtue of any subsequent enactment. 3. Without prejudice to the validity of anything done or to any liability incurred in respect of any act or omission before the coming into operation of this Order, the Tower Hamlets (Waiting and Loading Restriction) Order 2015 (e) shall have effect as though there was substituted for the item numbered (i) 226, 601, 762,790 and 969 in Schedule 1 and (ii) 29 and 65 in schedule 2; there was added item numbered 134, 181 and 182 in schedule 2 to this Order. Dated this: 06th July 2015 SIMON BAXTER Service Head, Public Realm (The Officer appointed for the purpose) _______________________________________________________________________ (a) 1984 C.27 (b) 1985 C.51 (c) 2004 C.18 (d) LBTH 2012/14 (e) LBTH 2015/67 U:\shared drive access\tmos\2015-07-06\2015 no.78 amend 1 Waiting and Loading.doc 1 SCHEDULE 1 1 2 3 969 UNDERWOOD ROAD (a) the north side, from the western kerb line of Deal Street A westwards for a distance of 46m; (b) so much as does not lie within (a) above. C 762 RAINE STREET A 990 VYNER STREET (a) From the eastern kerb line of Cambridge Heath Road, A eastwards for 14m; (b) So much as does not lie within (a) above B 226 CLAVE STREET (a) From the northern kerb-line of Wapping High Street A northwards for 14m (b) So much as does not lie within (a) above B 601 MANCHESTER ROAD The east side, from a point 11m north of the north kerb line of A Amsterdam Road to a point 14.5m south of the south kerb line of Amsterdam Road. SCHEDULE 2 1 2 3 134 UNDERWOOD ROAD The Southside, from a point 89m west of the west kerb line of 1 Vallance Road, westwards for a distance of 13m 181 RAINE STREET (a) Northside, from a point 15m east of the east kerb line of 1 Wapping Lane, eastwards for a distance of 15m (b) Northside, from a point 30m east of the east kerb line of 1 Wapping Lane, eastwards for a distance of 11.5m 182 VYNER STREET From the eastern kerb line of Cambridge Heath Road, eastwards for 1 14m. U:\shared drive access\tmos\2015-07-06\2015 no.78 amend 1 Waiting and Loading.doc 2 29 CLAVE STREET From the northern kerb-line of Wapping High Street northwards for 28 14m 65 MANCHESTER ROAD From the south kerb line of Amsterdam Road southwards for 14.5m 1 SCHEDULE 3 1 2 3 BB 8.30am to 10am and 4pm to 5.30pm Monday to Friday 28 A At Any Time 1 B 8.30am to 5.30pm Monday to Friday C 8.30am to 5.30pm Monday to Friday and 8.30am to 2pm Sunday U:\shared drive access\tmos\2015-07-06\2015 no.78 amend 1 Waiting and Loading.doc 3 .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages3 Page
-
File Size-