Phase I Template

Phase I Template

MnDOT CMMT Phase I ESA Report Text Outline On Cover Page (at a minimum): Project Name, Report Title, TH #, SP #, date report (different dates on draft vs. final), company name/logo Executive summary: High level summary of concerns likely to impact the corridor # of each ranked sites Section 1 Introduction: In any order - A purpose statement; why is work being completed. AAI, property acquisitions, construction, and any other purpose. - A scope of work/services statement - Definitions/Terms used, if needed. - Parcel ranking definitions copied from project specific contract - User Reliance - Significant Assumptions/Data Gaps/Limitations/Methodologies Section 2 Corridor Description: Location & legal descriptions: TRS, County, Street, other Historical corridor use: first development, large business use, railroad and road construction timeframes Current corridor use: general current corridor use Section 3 Physical setting: Topography Geology & soils Hydrogeology Section 4 Historical Land Use Review: Historical Maps, FIM, Aerials, CD, Topo, other - Short statement on how the data was obtained - Summary of what was observed for each type of record Section 5 Regulatory Database Review: ERIS review MPCA/MDA file reviews: List/table of the follow items: - Common name of site and regulatory ID # requested, along with associated Phase I Site ID - Files obtained (y/n/p {yes, no, pending}) - Simple one phrase of significant findings (off-site free product/tank pull, no residual impacts/TCE in groundwater/Superfund Site/MGP plant/active metal recycler). Statement about orphan sites: How many total, how many inside project area, how many outside area, how many were not located. List which ones become Site #s. Section 6 Additional Records: MnDOT R/W mapping, MWI, Env. Covenant (if found), prior reports, City/County Records, museums, other. Section 7: Site Recon: Date, weather, person Additional Site ID #s identified during site reconnaissance that were not previously ranked based on historical and regulatory reviews. List sites up-ranked based on site recon, discuss why. Discussion of additional property use/activities observed of concern. Summary of tanks and monitoring wells within R/W. Section 8 Interviews: Museums/Visitor centers, City hall entry way info, local government officials (as required by ASTM), District staff (as appropriate). Parcel owner, if appropriate to Scope of Work such as total-take. Do not list CMMT Project Manager unless specific knowledge shared. Section 9 Findings: Tables H, M, L. # of sites and discussion Summary paragraph about how many de minimis sites/blocks identified and general discussion of what type of properties. Section 10 Corridor-wide Concerns: - Vapor considerations - Groundwater plumes, extending into multiple parcels or into TH - Superfund sites (both within 500-ft and outside buffer that have contamination extending into buffer). - Other highly contaminated sites likely to impact corridor - Additional features such as, demolished buildings & tanks in R/W (both site recon & historical knowledge), Vaults, Coal Chutes, Steam pipes or known asbestos utilities, abandoned rail/streetcar lines, debris or surface dumping, obvious filling (wetlands, quarry, large depressions, shoreline). Section 11 Conclusions: Based on Phase I ESA findings and Corridor-wide Concerns which Site ID#s would benefit from further investigation as it pertains to anticipated property acquisition and proposed construction (state current design plan level [ie. District hand drawn, Scoping, ENM, preliminary or final layout, 30% plans, etc.]). Based on regulatory file reviews or previous reports which Sites ID#s have historical soil, groundwater or vapor results for: • Petroleum levels above MPCA offsite reuse levels or I-SRVs, • Non-petroleum levels (solvents, PCBs, agricultural chemicals, PFOS, etc.) above lab detections limits, • Metals above background levels. Section 12 Standard of Care Signatures with date (dd/mm/yyyy) To be appended: Tables (print) Figures (print) Site Summaries (print) ERIS (on CD) Historical Data (print, 11x17 as appropriate) Other Historical Data (on CD) File Reviews (on CD with e-fly sheet between each file) Qualifications (on CD) Information to include on the CD label (at a minimum): Truck highway number State Project (SP) number Title of report (Phase I ESA/Phase II/ RAP, etc.) City or other Geographic Area Month and Year of the report .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us