TIMED Launch Operations

TIMED Launch Operations

S. R. VERNON AND S. F. KOZUCH TIMED Launch Operations Steven R. Vernon and Stanley F. Kozuch Completion of all ground-based environmental testing of a spacecraft marks the start of the launch campaign. Launch operations are the hand-off point when the ground teams (design, development, assembly, and test) relinquish control and responsibility to the launch vehicle provider and Mission Operations Team that will actually operate the spacecraft in orbit. This article describes the TIMED launch operations, including ship- ment and transportation of the spacecraft and associated support hardware to the launch site, testing conducted at the Payload Processing Facility, launch vehicle integration operations, spacecraft system software and electrical testing, and preparation for launch. INTRODUCTION Launch operations typically start immediately after the facility was ready to accept the spacecraft, thus meet- the completion of spacecraft environmental testing. For ing the program requirements for cleanliness. Once the the TIMED (Thermosphere, Ionosphere, Mesosphere facility was certifi ed and the necessary support equipment Energetics and Dynamics) mission, the launch delay and personnel were deemed ready, the program offi ce was associated with the co-manifested Jason spacecraft notifi ed and the process for shipment of the TIMED considerably extended the time between environmental spacecraft by military aircraft from APL to VAFB com- testing and shipment to the fi eld for launch operations menced. (Complete information on the TIMED mission, to approximately 18 months. The joint NASA/French including participants, status, science, etc., may be found Jason spacecraft delays forced the TIMED spacecraft at http://www.timed.jhuapl.edu/mission/.) into storage twice, once at APL and again at Vanden- berg Air Force Base (VAFB). Launch site operations offi cially commenced with the SHIPMENT AND TRANSPORTATION overland truck shipment of mechanical and electrical Shipment of the spacecraft began when it was loaded ground support equipment (GSE) to the VAFB launch onto a fl atbed, air-ride, low-deck truck at APL (Fig. 1) site in Lompoc, California, approximately 1 week before for over-the-road transportation to Andrews Air Force shipment of the spacecraft. Early shipment and arrival of Base under security escort. A Maryland state–issued the GSE allowed personnel to clean the required equip- transportation waiver for oversized and critical loads ment, organize the fi eld offi ce, establish the critical exter- requiring an escort dictated early morning transporta- nal communication links back to APL, and certify that tion to avoid disruption to local traffi c. 170 JOHNS HOPKINS APL TECHNICAL DIGEST, VOLUME 24, NUMBER 2 (2003) TIMED LAUNCH OPERATIONS was monitored at 30-min intervals by APL spacecraft personnel using portable oxygen monitors to ensure crew safety. During these monitor- ing activities, the nitrogen fl ow rates and purity of the purge system were also checked and the data recorded. Upon arrival at VAFB, the TIMED spacecraft and supporting hardware were off-loaded to fl at- bed trucks and transported to the Figure 1. TIMED spacecraft shipment. The spacecraft (inside the container) is secured Payload Processing Facility (PPF) for land shipment to Andrews Air Force Base. located several miles from the air- craft runway. The spacecraft itself was protected from the elements PAYLOAD PROCESSING FACILITY and other hazards by a metallic shipping container. This container was under constant nitrogen purge supplied Site Selection by boil-off of liquid nitrogen from dewars that accom- The remotely located PPF originally chosen by panied the spacecraft at all times. It was instrumented NASA/Kennedy Space Center (KSC) for the TIMED to record shocks and incorporated externally readable mission, based on a competitive procurement, was gauges to measure the internal temperature, pressure, approximately 20 miles from the launch pad, Space and humidity. Internal shock isolation mounts provided Launch Complex (SLC)-2W. Selection was based on a dynamic protection of the payload against jolts encoun- requirements document produced by APL early in the tered during transportation and handling events. program and the fi ndings of several subsequent Ground All loading and transportation activities were con- Operations Working Group meetings involving Boeing, trolled and overseen by a mechanical payload team that NASA, Vandenberg Range Safety, and APL. It soon also accompanied the payload throughout its journey. became apparent that the initially selected NASA Constant communication links were maintained via facilities at VAFB were inadequate to support a dual two-way radios and cell phones between the payload payload (i.e., Jason and TIMED) attach fi tting mission. team and APL. As a result, NASA/KSC instituted a competitive pro- Upon arrival at Andrews, personnel inspected the curement between two available commercial PPFs. The cargo and ensured that the proper clearances and waiv- APL requirements document served as a technical basis ers had been approved and all hazardous materials were for contract bid evaluations and eventual award, which accounted for and labeled properly. Equipment and the went to Spaceport Systems International (SSI). spacecraft were then packaged onto cargo pallets for rapid loading onto a C-17 military aircraft. Figure 2 depicts the loading of the shipping container as viewed from inside the C-17. Because of the requirement for continuous nitrogen purge, coupled with aircraft emergency contingency planning (e.g., unscheduled aircraft diversions due to weather or national emergencies, aircraft maintenance or mechanical problems encountered on the ground), it was determined that three dewars of liquid nitrogen totaling 1080 L be shipped with the TIMED spacecraft. This was calculated to cover at least 9.5 days at full fl ow rates. The large amount of liquid nitrogen required that the dewar pressure-relief safety burst-disk devices be plumed and vented to one of the overboard fi ttings located inside the C-17 aircraft. This was done to ensure crew safety should a rupture of a dewar burst disk occur in fl ight. Figure 2. Air Force C-17 loading operation. Air Force personnel direct the loading operations of the TIMED spacecraft within the In addition to the onboard aircraft monitoring sys- shipping container for the fl ight to Vandenberg Air Force Base in tems, the oxygen content of the cargo compartment Lompoc, California. JOHNS HOPKINS APL TECHNICAL DIGEST, VOLUME 24, NUMBER 2 (2003) 171 S. R. VERNON AND S. F. KOZUCH The SSI commercial PPF (Fig. 3)—the primary location at VAFB where team then removed the last bag the fi eld crew, equipment, spacecraft, and fi eld offi ce were located—was and hoisted the spacecraft into designated as SLC-6W. It contained clean rooms, cranes, a multilayer insu- the processing cell, mounting it to lation (MLI) fabrication area, storage for the GSE, offi ce space, a precision a work stand for testing and fl ight cleaning station, forklifts, and a dewar storage refi ll station. Onsite testing buildup. The processing cell doors laboratories, fabrication capabilities, and a metrology laboratory for tool and were closed and sealed from the measurement calibration and certifi cation were contracted out to various other facility clean areas to prevent on-base facilities organizations as required. cross contamination from opera- The PPF was originally constructed for Space Shuttle payload integration tions of other payloads and tasks in and subsequent West Coast launch operations. Existing Boeing Delta-IV preparation for launch vehicle (LV) facility and launch pad modifi cations were ongoing near the PPF during the mating. entire period in which the TIMED spacecraft was present, but these con- SLC-6W, with its cranes, air han- struction operations had no impact on the TIMED fi eld operations. dling and cleaning systems, power systems, communications systems, Contamination Control environmental controls, and moni- toring systems, proved more than suf- Once at the PPF, the TIMED spacecraft was moved inside, and the fi cient for the TIMED mission. Facil- shipping container cover and outer contamination bag surrounding it were ity personnel responded instantly to removed. The inner bag and shipping container base were cleaned, and any and all requests with creative the system was rolled into the high-bay clean room. After the entry doors and satisfactory solutions. Contami- were closed, the clean room was allowed time to stabilize to meet program nation control and cleaning teams requirements for temperature, humidity, and cleanliness. The mechanical performed with diligence, care, and complete respect for the security of the payload. Security, 24-h monitor- ing, separation of Jason and TIMED personnel and hardware, and access to the TIMED spacecraft and sup- port equipment—both during times of activity and storage—were all under PPF personnel control. The spacecraft underwent fi nal mechanical assembly, installation of MLI, integration with the LV inter- face hardware and separation sys- tems, and fi nal software and system checkout while still at the PPF. After buildup and checkout were complete, the spacecraft system was readied for shipment to the launch pad. These operations and tests are detailed in the section below. SPACECRAFT FLIGHT BUILDUP AND FINAL ASSEMBLY The TIMED spacecraft was shipped with several nonfl ight instrument aperture protective covers in place, but minus critical power system components. In addi- tion, the fl ight

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    9 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us