The Tameside MBC Local Development Scheme

The Tameside MBC Local Development Scheme

The Tameside MBC Local Development Scheme Approved April 2007 Tameside Metropolitan Borough Council Planning and Building Control Council Offices Wellington Road Ashton-under-Lyne OL6 6DL Tel: 0161 342 3346 Web: www.tameside.gov.uk/planning Tameside MBC Local Development Scheme April 2007 Contents 1 1 Introduction 2 The New Planning System 2 2 Structure of Tameside's Local Development Framework 4 Development Plan Documents 4 Supplementary Planning Documents 5 Statement of Community Involvement 6 Saved Plan Policies 6 3 Development Control Guidance Notes 7 4 Schedule of Local Development Documents 8 5 Overall Programme of Production 11 6 Document Profiles 12 Ashton-under-Lyne Town Centre Strategy 12 Core Strategy of the Local Development Framework and Development Control Policies 13 Stalybridge Town Centre Strategy 15 Site Allocations 16 Greater Manchester Joint Waste Development Plan Document (JWDPD) 18 Employment Land 21 Conservation Area Policy Statement 22 Hyde Town Centre Strategy 23 7 Supporting Statement 24 Regional Planning Context 24 The Link with Other Council and External Strategies 24 Sustainability Appraisal and Strategic Environmental Assessment 24 Managing the Process 24 Evidence Base 26 Monitoring and Review of the Scheme 27 0 Appendix A Saved Tameside Replacement UDP Policies 29 Tameside Metropolitan Borough Council 2 Tameside MBC Local Development Scheme April 2007 1 Introduction 1.1 The planning system for England & Wales has changed. As part of this change the Council is required to prepare this Local Development Scheme to inform the public about the current planning polices for Tameside as well as to set out the programme for preparation of the Local Development Framework. This will contain new planning policy documents to progressively replace existing policies over the next four years. 1.2 This Local Development Scheme sets out a programme, which details the key stages of production of planning documents to 2010. The purpose is to inform stakeholders and the community about when they can become involved in the production of planning documents, particularly the periods of consultation. The schedule of documents and programme of production are contained in sections 4 & 5 of this report respectively. 1.3 The Scheme also contains a supporting statement which details the technical and procedural matters that the Council will need to consider in the production of the Local Development Framework. 1.4 The scheme has been approved by government and is now available to the public on the Council’s website: http://www.tameside.gov.uk/strategicplanning The New Planning System 1.5 The new planning system came into force in September 2004, when it replaced existing Development Plans with Local Development Frameworks. The underlying principles driving this change are: To produce a system that allow plans and policy to be more responsive to change and capable of being updated in shorter timeframes, To facilitate continuous stakeholder and community involvement to build consensus in plan making, To have a clear approach to community involvement, To have a requirement for a comprehensive evidence base, To have a requirement for Sustainability Appraisal (including Strategic Environmental Assessments ) for all plans, To have a wider spatial approach to planning to make the Local Development Framework the spatial expression of the Community Strategy and other local partnership strategies. There is more detail on this in paragraphs 7.2 & 7.3. A programme managed approach to plan making that adds greater certainty to plan production timescales that can be measured. 1.6 A Local Development Framework will consist of three types of document: Development Plan Documents: these will be the statutory Development Plan along with the Regional Spatial Strategy. The Development Plan Documents must be in conformity with the Regional Spatial Strategy and government policy. These will be subject to an independent examination by the Planning Inspectorate whose recommendations will be binding on the Council. The adopted Proposals Map is also considered a Development Plan Document that must be included in the Local Development Framework. It should be revised each time a new Development Plan Document is adopted. Up-to-date Plans / Policies adopted under the old planning regime can be brought forward and “saved” in the Local Development Framework.Tameside’s Replacement Unitary Development Plan (Nov 2004) will therefore be saved. There is more detail on this in paragraph 2.5. Statement of Community Involvement: this sets out how the Council will engage stakeholders and the community in the preparation of planning documents. It is subject to independent examination by the Planning Inspectorate. Supplementary Planning Documents: these will provide detailed guidance on specific sites and topic areas to supplement Development Plan Policies, but will not form part of the statutory Development Plan. Tameside Metropolitan Borough Council Tameside MBC Local Development Scheme April 2007 3 Introduction 1 They will, however, carry more weight in determining planning applications than old style Supplementary Planning Guidance, because they will be produced in line with new statutory regulations. Tameside Metropolitan Borough Council 4 Tameside MBC Local Development Scheme April 2007 2 Structure of Tameside's Local Development Framework 2.1 Figure 1 shows the relationship between the Local Development Framework, the Community Strategy and others, alongside the relationship between Local Development Documents. Tameside Community Strategy Local Development Framework Documents The Development Plan Development Plan Supplementary Planning Documents (DPDs) Documents (SPDs) Core Strategy and Statement of Brookbottom Mossley Employment Development Control Community Development Land Policies DPD Involvement Brief SPD SPD Regional Site Sustainable Design Ashton Town Spatial Allocations and Construction Centre Strategy Strategy DPD Guide SPD SPD Trees, Landscaping Stalybridge Proposals and Development Town Centre Map SPD Strategy SPD Greater Residential Dev’t Conservation Saved Policies Manchester Joint Guidelines & House Areas Policy Waste DPD Extension SPD Statement SPD Local Development Future Scheme A Guide to Hyde Town Development Developer Centre Strategy Plan Documents Contributions SPD SPD Annual Monitoring Report Replacement Unitary Development Plan Key to LDF Documents: (UDP) Required Adopted / Mossley Mills Hattersley & Mottram Completed Supplementary Supplementary Planning Guidance Planning Guidance Optional In progress / future document Project Plan Figure 1 Relationship between LDF documents, the Community Strategy and others Development Plan Documents 2.2 The Council intends to produce the following Development Plan Documents within the timeframe of this Scheme: The Core Strategy & Development Control Policies will be prepared to co-ordinate with the 1st review of the Regional Spatial Strategy. It will contain the key spatial policies/proposals of the Local Development Framework for Tameside. It will comprise a spatial vision and strategic objectives for the Borough, a spatial strategy, core policies and a monitoring and implementation framework with clear objectives for achieving delivery. A suite of generic Development policies will also be developed. Greater Manchester Joint Waste Development Plan Document (“the JWDPD”). Agreement has been reached across the Greater Manchester sub-region by Bolton Council, Bury Council, Manchester City Council, Oldham Council, Rochdale Council, Salford City Council, Stockport Council, Tameside Council, Trafford Council and Wigan Council to prepare a joint Development Plan Document, the Greater Manchester Tameside Metropolitan Borough Council Tameside MBC Local Development Scheme April 2007 5 Structure of Tameside's Local Development Framework 2 Joint Waste Development Plan Document (JWDPD). The proposed JWDPD is Greater Manchester’s preferred approach to implementing the principles of sustainable waste management for all waste streams. Context The area of Greater Manchester has the largest population within the Northwest, and consequently it is the largest producer of waste for all streams including Municipal Solid Waste (MSW), Commercial and Industrial (C&I), and Hazardous waste. In 2004/2005, total waste arisings for Greater Manchester were estimated to be over 8 million tonnes. European legislation, government targets, increasing waste generation, the need for improved environmental protection and rising public expectations are all driving the need for rapid changes in our approach to managing waste. Greater Manchester currently relies on landfill as its main source of waste management and therefore needs to reduce its reliance on this disposal option by providing alternative facilities for recycling, reprocessing, treatment and disposal of waste. The Regional Waste Strategy(1) sets overall objectives, mandatory targets and appropriate timescales for these changes, which are reinforced by policies in the Submission Draft Regional Spatial Strategy (RSS), which was submitted to the Secretary of State in January 2006. The JWDPD for Greater Manchester will seek to ensure that the right mixes of sites are identified to maximise the potential for driving waste up the hierarchy. It is intended to produce the JWDPD in just over 3.5 years for adoption by June 2010. Current Waste Policies and Status The waste policies which apply to the area of Greater Manchester are to be found in the Regional Spatial Strategy for the

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    36 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us