JAXA IXO Status Report

JAXA IXO Status Report

JAXA IXO status report Tadayasu Dotani (ISAS/JAXA) Hideyo Kunieda (Nagoya Univ.) Tadayuki Takahashi (ISAS/JAXA) Kazuhisa Mitsuda (ISAS/JAXA) Contents 1. History of mission studies 2. Conceptual Design of IXO Old(XEUS)/Current study 3. Possible area of Japanese contribution EOB Cryogenic HXT/HXI Detectors 4. Team members 1. Schedule Approval of CV-L Oct. 2007 XEUS mission study Nov. 2007 - Apr. 2008 XEUS steering Mar. 2008 XEUS steering May 2008 EOB design study May-Jun. 2008 IXO Boston meeting Jun. 2008 XEUS steering Jul. 2008 IXO Conceptual design Aug.-Oct. 2008 IXO-CG Sep. 2008 IXO CDF(ESA) Nov.-Dec. 2008 Red: Japanese activity i) Conceptual Design of XEUS DSC XEUS Design Nov. 2007 - Apr. 2008 Detector Space Craft 8.9m WFI Baffle 7.2m 2.5m STT NFI ©NEC Dewar ii). Conceptual Design of IXO Current Study Aug. 2008 -- After extension of the EOB Launch configuration ©NEC 2. Possible areas of Japanese contribution Mission Design EOB Cryogenic HXT/HXI Detectors (1) EOB development in Japan i) History (a) Telescopic-type ASCA(1993) 1m extension Suzaku(2005) 1.5m extension Suzaku EOB ©Nippi Co. i) History (b) Mast-type Booms (1970-90) : Probes of magnetosphere HALCA (1999) : 8mΦ radio antenna Astro-H (2013) : 6m extension of detectors HALCA antenna Mast for HALCA ii) Engineering model of the mast-type EOB 1/2 scale model L=50cm (-->1m)) 4 stages (-->8 stages) Aluminum (-->SFRP) Repeatability Characteristic Fq ~1Hz Stiffness Made by Nippi Co. iii) Astro-H EOB configuration Launch configuration On-orbit iv) A draft plan for IXO EOB Hexagonal mast-type 20m 17m EOB ©Nippi Co. (2) Mechanical Cooler development in JAXA i) Current status 1ST 2ST 2ST+4He JT 2ST+3He JT Cooler (100K) (20K) (4K) (2K) 2W@80K 325mW@20K 20mW @4.5K [email protected] Specification 50W, 4.2kg 90W, 9.5kg 120W, 23kg 190W, 25kg 1 year test was Ground test Life time test > 5 yr Life time test > 4 yr done. A new Lifetime test in status (still running) (still running) lifetime test in preparation preparation EM for SPICA & Suzaku, in orbit Akari, in orbit FM for SMILES Mission status Astro-H(NeXT) 3.1 years 2.5 years assembled assembled ii) Cryogenic system of Astro-H ©SHI iii) Cryogenic system for IXO: cooling chain Heat-load from detector to 50mK : 0.4µW Heat-load from FE electronics to 1.7K : 100µW 2ST pre cooler 0.4K 50mK 3He Joule-Thomson(JT) ADR(FEA) ADR (CPA) 1.7K 20K 2-stage Stiring cycle (2ST) 100K Radiation 90K 290K Radiator Radiator iv) Cryogenic system for IXO: a draft plan Weight: 132kg Side view Power: 416W / 438W 400 mm Radiators Bottom view 90K shield 1m2 20 K shield 9 0K 855 290K 1.1m2 φ750 mm S/C structure X-ray entrance window (290 K) ©SHI X-ray beam 3. Team Members IXO-CG Kunieda, Takahashi, Mitsuda, Ohashi (Dotani) TWG Kunieda XAWG Ueda, Ohashi,,,,, XPWG Takahashi, Mitsuda, Tsunemi,,,,,.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us