AIP Grants Awarded by State: 2018 City Airport / Project Location Service Level Grant No

AIP Grants Awarded by State: 2018 City Airport / Project Location Service Level Grant No

FAA Airports AIP Grants Awarded by State: 2018 City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project Alabama Alabaster Shelby County General Aviation 021 $249,970 Construct Building - T-Hangar Construction (Reimbursement-Phase 1) Alexander City Thomas C Russell Field General Aviation 018 $162,000 Install Runway Vertical/Visual Guidance System - PAPI installation Anniston Anniston Regional General Aviation 033 $384,413 Rehabilitate Apron - Terminal area - crack seal and seal coat Anniston Anniston Regional General Aviation 033 $88,987 Rehabilitate Taxiway - Taxilane - crack seal and seal coat Ashland/Lineville Ashland/Lineville General Aviation 012 $206,013 Construct Taxiway - Phase 2 - Grading and Drainage Ashland/Lineville Ashland/Lineville General Aviation 012 $206,013 Construct Apron - Phase 2 - Grading and Drainage Atmore Atmore Municipal General Aviation 015 $56,089 Update Airport Master Plan Study - Master Plan Update (ALP and Narrative) Auburn Auburn University Regional General Aviation 031 $832,500 Rehabilitate Taxiway - Rehabilitate Taxiway - Phase 2 (Paving and Marking) Bay Minette Bay Minette Municipal General Aviation 014 $69,766 Update Airport Master Plan Study - Update Master Plan and ALP Bay Minette Bay Minette Municipal General Aviation 015 $55,440 Remove Obstructions [APP or DEP] - Ph 1 - Acquire Parcel 12 (22 acres for RW 8 obstruction removal) Bessemer Bessemer Reliever 017 $122,607 Rehabilitate Runway - Design Page 1 of 206 City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project Alabama Birmingham Birmingham-Shuttlesworth Primary 100 $255,632 Install Runway Distance-To-Go Signs - International Birmingham Birmingham-Shuttlesworth Primary 100 $252,356 Improve Airport Erosion Control - Taxiway F International Birmingham Birmingham-Shuttlesworth Primary 100 $39,500 Acquire Aircraft Rescue & Fire Fighting Safety Equipment International Birmingham Birmingham-Shuttlesworth Primary 100 $183,840 Rehabilitate Runway Lighting International Birmingham Birmingham-Shuttlesworth Primary 100 $39,039 Rehabilitate Taxiway International Birmingham Birmingham-Shuttlesworth Primary 100 $130,763 Install Miscellaneous NAVAIDS International Birmingham Birmingham-Shuttlesworth Primary 100 $316,625 Install Runway Distance-To-Go Signs - International Birmingham Birmingham-Shuttlesworth Primary 101 $1,196,966 VALE Infrastructure - Install CNG Facilites International Brewton Brewton Municipal General Aviation 015 $275,541 Rehabilitate Runway Lighting - Rehab Runway 12/30 Lighting System Brewton Brewton Municipal General Aviation 015 $10,000 Rehabilitate Airport Beacons - Replace Beacon Light Assembly Camden Camden Municipal General Aviation 012 $156,298 Rehabilitate Runway - Crack Seal, Seal Coat, Marking Centre Centre-Piedmont-Cherokee General Aviation 011 $171,000 Improve Access Road - crack repair and seal coat with isolated full County Regional depth repair Centreville Bibb County General Aviation 012 $279,111 Acquire Land for Development Clanton Chilton County General Aviation 015 $608,648 Acquire Land For Approaches - (Parcels 39, 53, & 54) Cullman Cullman Regional-Folsom General Aviation 025 $449,813 Reconstruct Taxiway - Ph 2 - Reconstruct N Partial Parallel TW Field Page 2 of 206 City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project Alabama Dauphin Island Jeremiah Denton General Aviation 015 $19,800 Rehabilitate Runway - Runway Rehab (Ph 3 of 3 - Reimbursement) Dauphin Island Jeremiah Denton General Aviation 015 $153,053 Install Runway Vertical/Visual Guidance System - Install PAPI's Decatur Pryor Field Regional General Aviation 027 $441,000 Reconstruct Taxiway Lighting Dothan Dothan Regional Primary 041 $1,569,961 Rehabilitate Apron - Rehabilitate GA Apron (Design and Construction) Dothan Dothan Regional Primary 041 $80,963 Rehabilitate Taxiway - Crack Seal and Remark Taxiway "B" Elba Carl Folsom General Aviation 011 $428,404 Construct Building - Hangar Construction Enterprise Enterprise Municipal General Aviation 020 $662,361 Rehabilitate Taxiway - Rehabilitate Parallel Taxiway Evergreen Evergreen General Aviation 015 $164,035 Remove Obstructions [APP or DEP] - Phase 2 - Remove Obstructions, Regional/Middleton Field RW 1/19 RPZ and Departure Surface (construction) Fairhope H. L. (Sonny) Callahan General Aviation 019 $3,255,318 Construct Taxiway - Phase 3 construction, East terminal area parallel and access taxiways (paving, lighting, utilities) Foley Foley Municipal General Aviation 016 $258,676 Construct Taxiway - Construct Access Taxiway Fort Payne Isbell Field General Aviation 023 $57,397 Install Runway Vertical/Visual Guidance System - Replace runway end identifier lights Fort Payne Isbell Field General Aviation 023 $153,978 Install Weather Reporting Equipment - Replace AWOS 3-P/T Equipment Greenville MacCrenshaw Memorial General Aviation 014 $3,114,820 Reconstruct Runway - Reconstruct RW 14/32 (Construction) Gulf Shores Jack Edwards National General Aviation 031 $63,365 Improve Runway Safety Area - RW 9 RSA Drainage Improvements (Force Account - Reimbursement) Gulf Shores Jack Edwards National General Aviation 031 $65,534 Rehabilitate Taxiway - Remark all taxiways Page 3 of 206 City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project Alabama Guntersville Guntersville Municipal - Joe General Aviation 022 $16,679 Construct Runway - Stream Mitigation Monitoring (Year 3 of 5) Starnes Field Guntersville Guntersville Municipal - Joe General Aviation 022 $132,560 Construct Taxiway - Construct taxiway to support hangar Starnes Field development (Ph 1) Guntersville Guntersville Municipal - Joe General Aviation 022 $130,681 Install Perimeter Fencing not Required by 49 CFR 1542 - Perimeter Starnes Field Fencing Hartselle Hartselle-Morgan County General Aviation 015 $317,609 Rehabilitate Runway - Crack repair, isolated surface repair, seal coat Regional & marking Hartselle Hartselle-Morgan County General Aviation 015 $17,478 Rehabilitate Taxiway - Crack repair, seal coat & marking Regional Hartselle Hartselle-Morgan County General Aviation 015 $69,913 Rehabilitate Apron - Crack repair, isolated full-depth repair, seal coat Regional & marking. Headland Headland Municipal General Aviation 015 $1,194,342 Construct Taxiway - Construct Partial Parallel Taxiway Huntsville Huntsville Executive Airport General Aviation 028 $1,234,700 Acquire Land for Development - Parcel 34-0.5 ac; Parcel 35-1.01 ac; Tom Sharp Jr Field Parcel 36-11.5 ac; Parcel 37-1.0 ac; Parcels 27,28,29 & 30-3.0 ac; Parcels 31 & 32-2.0 ac Huntsville Huntsville International- Primary 082 $608,958 Rehabilitate Taxiway - Rehabilitate (overlay) Taxiway J Carl T Jones Field Huntsville Huntsville International- Primary 082 $885,232 Rehabilitate Terminal Building - Phase 4-replacement of 12 Carl T Jones Field passenger boarding bridges Huntsville Huntsville International- Primary 082 $649,604 Rehabilitate Apron - Concrete joint replacement-69,000 feet Carl T Jones Field Huntsville Huntsville International- Primary 082 $499,126 Rehabilitate Terminal Building - Terminal Public Areas Phase-2 Carl T Jones Field (Construct Airline Rear Baggage Handling Canopy) Huntsville Huntsville International- Primary 083 $29,115,000 Construct Taxiway - Construct TW C, Phase 4 (from C5 to C7) Carl T Jones Field Jasper Walker County-Bevill Field General Aviation 020 $121,500 Update Airport Master Plan Study Page 4 of 206 City Airport / Project Location Service Level Grant No. AIP Federal Funds Description of Project Alabama Lanett Lanett Municipal General Aviation 015 $1,567,830 Construct Runway - Construct Runway 6/24 (paving) Lanett Lanett Municipal General Aviation 015 $165,150 Install Runway Lighting Mobile Mobile Downtown General Aviation 034 $5,449,119 Reconstruct Taxiway - Reconstruct Taxiway H (Construction) Mobile Mobile Downtown General Aviation 034 $370,908 Install Taxiway Lighting - Install Taxiway H Lighting System Mobile Mobile Downtown General Aviation 034 $1,409,150 Rehabilitate Runway - Rehab of RW 14/32 (Phase 1 - Rehab RW 18/36 for primary use during shutdown) Mobile Mobile Regional Primary 056 $82,905 Acquire Friction Measuring Equipment Mobile Mobile Regional Primary 056 $1,015,208 Improve Airport Drainage - RW 18 Drainage Improvements Mobile Mobile Regional Primary 056 $89,609 Update Airport Master Plan Study - Study to move commercial traffic from MOB to BFM Monroeville Monroe County Aeroplex General Aviation 015 $505,016 Rehabilitate Runway - Rehab Runway (Seal Cracks, Sealcoat, Marking) Montgomery Montgomery Regional Primary 048 $198,000 Rehabilitate Taxiway - Rehabilitate Taxiway Alpha (Design Only) (Dannelly Field) Montgomery Montgomery Regional Primary 048 $1,309,237 Rehabilitate Access Road - Rehabilitate Access Road, Phase 2 (Dannelly Field) (construction reimbursement) Muscle Shoals Northwest Alabama Commercial 038 $217,740 Rehabilitate Runway - Phase 1-Design rehabilitate (overlay) RW Regional Service 11/29 Muscle Shoals Northwest Alabama Commercial 038 $37,525 Reconstruct Airfield Guidance Signs - Phase 1-Design for Regional Service reconstruction of 69 signs Muscle Shoals Northwest Alabama Commercial 038 $5,403,885 Rehabilitate Runway - Rehabilitate (overlay)(construction phase) RW Regional Service 11/29 Muscle Shoals Northwest Alabama Commercial 038 $206,815 Reconstruct Airfield Guidance Signs - Phase 1 - Reconstruct 27 Signs Regional Service Oneonta Robbins Field General Aviation 012 $34,244

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    206 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us