1 December 2018 FORM

1 December 2018 FORM

Form ‐ 1 to get Environmental Clearance for the proposed construction of 2496 Tenements at Amutham Nagar, Perur Chettipalayam Village, Perur Taluk, Coimbatore Corporation. FORM ‐ 1 I. Basic Information S. No. Item Details 1 Name of the project/s Proposed construction of 2496 Tenements at Amutham Nagar, Perur Chettipalayam Village, Perur Taluk, Coimbatore Corporation. 2 S. No. in the schedule 8 (a) 3 Proposed capacity / area / length / Total plot area – 79735.9 Sq.m tonnage to be handled/command Built‐up Area – 93655.68 Sq.m area / lease area / number of wells No of units – 2496 Nos in 36 blocks to be drilled Floors – Ground + 3 floors 4 New/Expansion/Modernization New 5 Existing Capacity/ Area etc. Nil 6 Category of Project i.e. ‘A’ or ‘B’ Category ‘A’ 7 Dose it attract the general No condition? If yes, please specify. 8 Dose it attract the specific No condition? If yes, please specify. 9 Location Plot/survey/ Khasra. No S.F. No. 190/2B, 192/1A, 192/1B1, 192/2A, 192/2B2, 193/2B2, 193/1G1 194/1B & 194/2B Village Perur Chettipalayam Tehsil Perur Taluk District Coimbatore State Tamil Nadu 10 Nearest railway station/airport Madukkarai Railway Station – 5.5 km, along with distance in Km. SSE Coimbatore Junction – 8.3 km, NE 11 Nearest town, city, district Coimbatore – 8.5 Km, NNE headquarters along with distance in Km. 12 Village panchayats, Zilla parished, Coimbatore Corporation, municipal corporation, local body Coimbatore, (complete postal address with Coimbatore district – 641001 telephone nos. to be given) Phone no. 0422 ‐ 2390261 13 Name of the applicant Tamilnadu Slum Clearance Board 14 Registered address 397A, North Housing Unit, Selvapuram, Coimbatore‐641026. 15 Address for correspondence Name A.L.C. Kumar, B.E Designation (Owner/Partner/CEO) Executive Engineer 1 December 2018 Form ‐ 1 to get Environmental Clearance for the proposed construction of 2496 Tenements at Amutham Nagar, Perur Chettipalayam Village, Perur Taluk, Coimbatore Corporation. Address 397A, North Housing Unit, Selvapuram, Coimbatore Pin Code 641026 E‐Mail [email protected] Telephone No 0422 2343076 Fax No ‐‐‐ 16 Details of Alternative Sites No alternative sites examined Examined, if any, location of these sites should be shown on a topo sheet. 17 Interlinked Projects Nil 18 Whether separate application of Not Applicable interlinked project has been submitted? 19 If yes, date of submission Not Applicable 20 If no, reason Not Applicable 21 Whether the proposal involves No approval / Clearance under the following acts: if yes, details of the same and their status to be given. (a)The Forest (Conservation) Act, 1980? (b)The Wildlife (Protection) Act, 1972? (c)The C.R.Z Notification, 1991? 22 Whether there is any government No order/ Police relevant/ relating to the site? 23 Forest land involved (hectares) Nil 24 Whether there is any litigation Nil pending against the land/ or land in which the Project is proposed to be set up? (a) Name of the Court (b) Case No. (c) Order/ directions of the Court, if any and its relevance with the proposed project 2 December 2018 Form ‐ 1 to get Environmental Clearance for the proposed construction of 2496 Tenements at Amutham Nagar, Perur Chettipalayam Village, Perur Taluk, Coimbatore Corporation. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No. Information / Checklist Yes / Details thereof with approximate confirmation No quantities / rates, wherever possible) with source of information data 1.1 Permanent or temporary Yes The site is classified as Industrial change in land use, land cover use zone by LPA, Coimbatore. The or topography including land use of the site is altered due to increase intensity of land use the construction of residential (with respect to local land use tenements. The copy of the land use plan) conversion request letter is submitted. 1.2 Clearance of existing land, No Since the existing land having small vegetation and Buildings? shrubs and bushes, no major clearance activities will take place. Only minor clearance activities will be carried out to remove the shrubs and weeds. 1.3 Creation of new land uses? No No creation of new land use as the site is vacant land & only tenements will be constructed. 1.4 Pre‐construction Yes Soil Testing has been done to find investigations e.g. Bore the suitability of soil for providing Houses, Soil testing? adequate foundations for the proposed structures and the copy of the report is given in Annexure ‐ II. 1.5 Construction works? Yes Construction of 36 blocks of 2496 Tenements will be done systematically, with economy of materials. 1.6 Demolition works? No No demolition works will be carried out as the land is vacant 1.7 Temporary sites used for Yes Inside the proposed site, a small construction works or housing area will be utilized temporarily for of construction workers? construction of sheds for the migrated workers and materials. But most of the workers will be deployed from local area only. 1.8 Above ground buildings, Yes Excavation work will be carried out structures or earthworks (24,400 m3) for leveling the including linear structures, cut topography. G+3 tenements will be and fill or excavations constructed and the excavated 3 December 2018 Form ‐ 1 to get Environmental Clearance for the proposed construction of 2496 Tenements at Amutham Nagar, Perur Chettipalayam Village, Perur Taluk, Coimbatore Corporation. material will be used for filling and leveling purposes. 1.9 Underground works mining or No No underground works will be tunneling? required as the proposed project is the construction of tenements. 1.10 Reclamation works? No Not envisaged. 1.11 Dredging? No Not envisaged. 1.12 Off shore structures? No Not envisaged. 1.13 Production and manufacturing No Not applicableas the project is processes? construction of tenements. 1.14 Facilities for storage of goods Yes Temporary sheds will be or materials? constructed for the storage of cement and other materials during construction phase. 1.15 Facilities for treatment or No Sewage will be treated in the disposal of solid waste or proposed STP of 1800 KLD and the liquid effluents? treated wastewater reused for gardening and landscaping purposes. Bio degradable wastes (3781 Kg/day) are processed in OWC and Non Bio Degradable wastes (2521 Kg/day) are disposed to authorized recyclers. 1.16 Facilities for long term No No operational phase workers housing of operational involved in this project. workers? 1.17 New road, rail or sea traffic No The existing road network is during Construction or sufficient for connectivity of the site operation? with other parts of the city. 1.18 New road, rail, air, waterborne No There will be no change to the or other transport existing transport infrastructure. infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No As construction works will be within existing transport routes or a specified area, there is no need for infrastructure leading to closure or diversion of existing changes in Traffic transport routes. movements? 1.20 New or diverted transmission No No new or diversion transmission lines or pipelines? lines & pipelines are required for this project. 1.21 Impoundment, damming, No There will not be any alteration in culverting, realignment or the hydrology of the watercourses other changes to the or aquifers due to the proposed hydrology of watercourses or project. aquifers? 4 December 2018 Form ‐ 1 to get Environmental Clearance for the proposed construction of 2496 Tenements at Amutham Nagar, Perur Chettipalayam Village, Perur Taluk, Coimbatore Corporation. 1.22 Stream crossings? Yes There is no stream crossing in the project site. 1.23 Abstraction or transfers of Yes Water requirement will be sourced water form ground or surface from TWAD Board. waters? 1.24 Changes in water bodies or No There is no change in the water land surface affecting drainage bodies or land surface which affects or runoff? the drainage or runoff. 1.25 Transport of personnel or Yes Transportation of personnel & materials for construction, construction materials during operation or construction phase will be through decommissioning? existing roads only. 1.26 Long‐term dismantling or No As part of this project, no long‐term decommissioning or dismantling or decommissioning or restoration works? restoration works would be involved. 1.27 Ongoing activity during No There will not be any decommissioning which could decommissioning works. have an impact on the environment? 1.28 Influx of people to an area Yes During construction period few either temporarily or workers will be stationed permanently? temporarily and others will be deployed locally. 1.29 Introduction of alien species? No No introduction of alien species 1.30 Loss of native species or No No loss at the site is plain and there genetic diversity? is no significant species. 1.31 Any other actions? No Only eco‐friendly activities like tree plantation will be undertaken. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non‐ renewable or in short supply). Details there of (with Information/checklist Yes / approximate quantities/rates, S. No. confirmation No wherever possible) with source of information data 2.1 Land especially undeveloped Yes The proposed project will be or agricultural land (ha) established in an area of 8.21 ha. The copy of the land enter upon permission is enclosed as Annexure – III. 2.2 Water (expected source & Yes Total water Requirement – 1136 KLD competing users) Unit: KLD Source: TWAD Board and the acknowledgement copy of the request letter submitted to same is 5 December 2018 Form ‐ 1 to get Environmental Clearance for the proposed construction of 2496 Tenements at Amutham Nagar, Perur Chettipalayam Village, Perur Taluk, Coimbatore Corporation.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    13 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us