PROJECT EXAMPLES NATURAL GRASS DEVELOPMENTS Professional Sportsturf Design Ltd. (PSD) St Johnstone FC - McDiarmid Park Stadium Client St Johnstone Football Club Form of Contract Dates May - August 2011 Designer PSD Ltd Project Manager PSD Ltd. Architect Cost Consultant PSD Ltd. Services Engineer Value £110,000 Structural Engineer Size CDM Co-ordinator Lead Contractor Souters Sports Limited Description The reconstruction of the Stadium Pitch after losing games and receiving very bad reviews over the previous 12 months. The limited funds allowed only a partial reconstruction and some minor drainage works plus the incorporation of Fibresand into the surface. The Pitch has performed very well since the reconstruction and has been continually scored highly by SPL match assessors. Professional Sportsturf Design Ltd. (PSD) Kilmarnock Football Club - Rugby Park Stadium Client Kilmarnock Football Club Form of Contract N/A Dates May - August 2012 Designer PSD Ltd Project Manager PSD Architect Cost Consultant PSD CDM Co-ordinator Value £120,000 Lead Contractor Greentech Limited Size Description Reconstruction of the Stadium Pitch, including the incorporation of Fibresand reinforcement into the surface. Professional Sportsturf Design Ltd. (PSD) Glasgow 2014 Commonwealth Games - Kelvingrove Bowling Centre Client 2014 Commonwealth Form of Contract N/A Games Committee Dates May - August 2012 Project Manager Designer PSD Ltd PSD Cost Consultant PSD Architect CDM Co-ordinator Value £120,000 Lead Contractor Fairways Sportsgrounds Size Description Complete reconstruction of 5 No. existing bowling greens at Kelvingrove Bowling Centre for Glasgow 2014 Commonwealth Games. Professional Sportsturf Design Ltd. (PSD) Hibernian FC - Easter Road Stadium Client Hibernian Football Club Form of Contract Dates May – August 2010 Designer PSD Ltd Project Manager PSD Value £140,000 Cost Consultant PSD Services Engineer Size Structural Engineer CDM Co-ordinator Lead Contractor A J Bain (Sports Contractor) Limited Description Full reconstruction of the Stadium Pitch, whilst retaining existing drainage and under-pitch heating system. Professional Sportsturf Design Ltd. (PSD) Hibernian FC - Training Centre Client Hibernian Football Club Form of Contract ICE Dates March - December 2007 Designer PSD Ltd Project Manager PSD Ltd. Architect Cost Consultant PSD Ltd Services Engineer Value £1.75M Structural Engineer Size CDM Co-ordinator Lead Contractor AJ Bain (Sportsgrounds) Description Construction of all sports facilities for the new training academy, comprising: Full size FIFA 2-Star synthetic grass 3G football pitch Indoor FIFA 2-Star synthetic grass 3G football training pitch 5 No. Natural Grass UEFA size football pitches Goalkeeper training area Fitness trail with training hills Casual practise areas Professional Sportsturf Design Ltd. (PSD) Celtic FC - Celtic Park Stadium Client Celtic Football Club Form of Contract N/A Dates March - 2004 Designer PSD Ltd Project Manager PSD Architect Cost Consultant PSD Services Engineer Value £140,000 Structural Engineer Size CDM Co-ordinator Lead Contractor Support in Sport Limited Description The mid season reconstruction of the Stadium Pitch after the complete collapse of the surface following a Champions League match was urgently required and it was organised in a very short time. The turf was located and approved in Germany and the works were carried out to remove the existing surface and mitigate the issues with Black Layer before re-turfing. The Pitch was out of use for less than 2 weeks. Professional Sportsturf Design Ltd. (PSD) Celtic FC - Lennoxtown Training Ground Client Celtic Football Club Form of Contract Dates Feb 2008 – Oct 2012 Architect The Miller Partnership Project Manager Arcadis Value 3 No Phases (£ 7m, £400k Cost Consultant Arcadis and £ 450k Services Engineer Size Structural Engineer CDM Co-ordinator Lead Contractor Malcolm Construction and Souter Sports Limited Description Provision of new Professional Football Club Training Academy The first Phase as part of the Design Team for the initial design and construction of the Centre which included 1 No Full Size FIFA 2* 3G Artificial Grass Pitch, I No Indoor FIFA 2* 3G Artificial Grass Pitch and 1 No Full Rootzone Construction Pitch with under Pitch Heating and 3 No Topsoil Amended full size pitches. The second Phase allowed the construction of one further full size Full Rootzone Pitch. The third Phase completed this year was the full re-construction of one amended topsoil pitch to a Full Rootzone Construction and the partial reconstruction of 2 No amended topsoil pitches and a Goal Keeper Training Area. Professional Sportsturf Design Ltd. (PSD) Falkirk FC – Falkirk Stadium Client Falkirk Football Club Form of Contract Dates Jan – August 2004 Designer PSD Ltd Project Manager Falkirk Council Architect Falkirk Council Cost Consultant Services Engineer Value £450,000 Structural Engineer Size CDM Co-ordinator Lead Contractor Malcolm Construction Description Construction of a new Stadium for Falkirk FC – PSD responsible for the design and project management of the new Stadium Pitch. Pitch was a full Rootzone Construction with Fibresand amendment – complete with automatic irrigation and an electrical under pitch heating system. 2013 appointed to design and project manage the contract to change the pitch over to a FIFA2* artificial surface Professional Sportsturf Design Ltd. (PSD) Dalziel Park Client Dalziel Sports Trust Form of Contract Dates 1999 – Present Architect Project Manager Value 3 No Phases (£ 2.25m, Cost Consultant £400k and £ 600k Services Engineer Size Structural Engineer CDM Co-ordinator Lead Contractor Land Engineering Description Provision of new Sports Facility for Dalziel High School and Dalziel Sports Club The site has been developed in Phases and the current Phase for 2013 is to extend the existing synthetic grass facilities and allow Rugby use. .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages10 Page
-
File Size-