Scottish Hydro Electric Transmission PLC – Skye Reinforcement

Scottish Hydro Electric Transmission PLC – Skye Reinforcement

Agenda Item 5.1 Report No PLS/033/20 HIGHLAND COUNCIL Committee: South Planning Applications Committee Date: 16 June 2020 Report Title: Scottish Hydro Electric Transmission PLC – Skye Reinforcement Report By: Area Planning Manager South 1. Purpose/Executive Summary 1.1 Description: Skye Reinforcement – Erection of replacement high voltage (132kv) transmission line between Ardmore, Skye and Fort Augustus 1.2 Ward: In the South Planning Applications Committee area: • 11 – Caol and Mallaig • 12 – Aird and Loch Ness 2. Recommendations 2.1 Members are asked to note the submission and highlight any material issues they wish to be brought to the attention of the applicant before the submission of the application for consent under Section 37 of the Electricity Act. 3. BACKGROUND 3.1 This report seeks to inform the South Planning Applications Committee of the pre- application consultations being undertaken by Scottish Hydro Electric Transmission (SHET) on a forthcoming Section 37 application under the Electricity Act 1989. Such applications are not formally required to submit a Pre Application Notice to the Planning Authority, but the consultation is nevertheless welcome. A public consultation was launched in March 2020, however the local events could not be take forward as a result of the ongoing restrictions related to the Covid-19 pandemic. The consultation has been based online and public events will be rescheduled for when it is safe to do so. 3.2 A similar report to this has also been made to the North Planning Applications Committee given it passes through the area within their remit as well. The Council were consulted as a key stakeholder in March 2020 on the emerging proposals and are invited to comment on the consultation document which sets out the following: • Existing transmission infrastructure; • Need for the project; • Proposed development solution; • Access during construction; and • Considerations of route options. 3.3 The consultation document and the route option plans are attached to this paper with background reports available online at https://www.ssen- transmission.co.uk/projects/skye-reinforcement/. In the consultation document the following questions have been asked by the developer: 1. Have we adequately explained the changes in respect of the need for this Project? 2. Have we adequately explained the reasons why the capacity of the line has to increase which will result in changes to the existing infrastructure along its route? 3. Have we adequately explained the methodology used to re-appraise the preferred route for the new OHL design? 4. Are there any factors, or environmental features, that you consider may have been overlooked during the route appraisal process? 5. Do you have any other comments in relation to the drivers for the project, related to the transmission infrastructure requirements, or preferred route? Members are asked for their view on these questions to inform a response which will be made to this early consultation. 4. DESCRIPTION OF PROPOSED DEVELOPMENT 4.1 The proposal comprises the reinforcement of the high voltage electricity network, from Ardmore on the Isle of Skye, to Fort Augustus. The purpose if this is to replace the existing 132kV overhead transmission line from Fort Augustus to Ardmore, built in the 1970’s, which is the sole connection from the mainland electricity transmission system to Skye and the Western Isles. There are three primary reasons for the replacement: • Security of electricity supply; • Condition of existing infrastructure; and • Requirement for increased capacity to accommodate renewable energy developments. 4.2 The proposal can be broken down into the following main elements: • Fort Augustus substation to Broadford substation - it is proposed to construct a new double circuit 132kV overhead line (OHL) comprising steel structures. The existing Fort Augustus to Skye Tee 132kV trident wood pole OHL, and the existing 132kV steel lattice OHL between Skye Tee and Broadford would be dismantled and removed once the new OHL is operational; • Broadford substation and Edinbane substation - the existing single circuit wood pole trident 132kV OHL would be replaced with a new double circuit 132kV OHL comprising steel structures. The existing OHL would be dismantled and removed once the new OHL is operational; and • Edinbane substation and Ardmore substation - the existing single circuit wood pole trident 132kV OHL would be replaced with a new higher capacity132kV trident wood pole OHL. During construction, the existing OHL and its replacement would run in tandem but on energisation of the new OHL, the existing OHL would be dismantled and removed. 5. SITE DESCRIPTION 5.1 The development covers an extensive area across the Council, passing through four electoral wards. A preferred route corridor has been defined as shown in greater detail on the attached plans. 5.2 End to end via the public road network the line covers over 100 miles, and whilst construction access will in part use the trunk road network, this project will require construction access from a number of Council roads. This road network varies considerably in standard, but there is potential for the development to require the use of numerous single track roads. 5.3 Across the length of all corridors route options are a significant number of potential impacts on the following features: • Settlements/ Communities (e.g. Broadford, Glenelg, Fort Augustus; • National Scenic Areas (e.g. the Cuillin Hills, Knoydart and Kintail); • Listed Buildings (e.g. Dunvegan Castle, Eilean Donan Castle, Caledonian • Canal); • Historic Sites / Monuments (e.g. Bernera Barracks, Glenshiel Battlefield); • Sites of Special Scientific Interest (SSSI) (e.g. Sligachan Peatlands, Strath); • Special Protection Areas (SPA’s) (e.g.Kinloch and Kyleakin Hills); • Special Areas of Conservation (SAC’s) (e.g. Loch Duich, Long and Alsh Reefs) • Special Landscape Areas 9e.g. Trotternish and Tianavaig; Loch Ness and • Duntelchaig); • Areas of Wild Land (e.g. Cuillins; Central Highlands; Kinlochhourn – Knoydart – • Morar); • Priority Peatland; • Conservation Areas; • Ancient Woodland. For the avoidance of doubt this list is not exhaustive and other features will also be impacted both in the categories listed above but other more local categories such as recreational paths and physical constraints. 6. DEVELOPMENT PLAN POLICY The following policies are relevant to the assessment of the application 6.1 Highland Wide Local Development Plan 2012 28 - Sustainable Design 29 - Design Quality & Place-making 30 - Physical Constraints 31 - Developer Contributions 51 - Trees and Development 52 - Principle of Development in Woodland 55 – Peats and Soils 56 - Travel 57 - Natural, Built & Cultural Heritage 58 - Protected Species 59 - Other Protected Species 60 - Other Important Habitats 61 – Landscape 63 – Water Environment 64 - Flood Risk 66 - Surface Water Drainage 69 – Electricity Infrastructure 72 – Pollution 77 – Public Access 6.2 Inner Moray Firth Local Development Plan (2015) No site specific policies apply. West Highland and Islands Local Development Plan (2019) No site specific policies apply. 6.3 Highland Council Supplementary Planning Policy Guidance Construction Environmental Management Process for Large Scale Projects (August 2010) Highland Historic Environment Strategy (Jan 2013) Highland's Statutorily Protected Species (March 2013) Highland Renewable Energy Strategy & Planning Guidelines (May 2006) Standards for Archaeological Work (March 2012) Sustainable Design Guidance Trees, Woodlands and Development (Jan 2013) 6.4 Scottish Government Planning Policy and Guidance Scottish Planning Policy (June 2014) National Planning Framework 3 (June 2014) Onshore Wind Policy Statement (December 2017) Scottish Energy Strategy (December 2017) PAN 1 / 2011 – Planning and Noise; Circular 1/2017 – Environmental Impact Assessment; PAN 60 – Planning for Natural Heritage; 2020 Routemap for Renewable Energy; Onshore Wind Turbines; and Wind Farm developments on Peat Lands 7. POTENTIAL MATERIAL PLANNING CONSIDERATIONS 7.1 • Development Plan; • National Policy; • Planning History; • Roads and Transport; • Water Environment (including private water supplies); • Flood Risk and Drainage; • Peat; • Natural Heritage (including protected species, ornithology and designated sites); • Trees and Forestry; • Built and Cultural Heritage; • Design, Landscape and Visual Impact (including Cumulative impacts and Impact on Wild Land Areas); • Access and Recreation; • Economic Impact and Tourism; • Noise and Shadow Flicker; • Telecommunications; • Aviation; • Construction. 8. CONCLUSION 8.1 The report sets out the information submitted to date in a manner consistent with a Proposal of Application Notice under the Town and Country Planning Act. There are no such requirements for applications under the Electricity Act. Summarised are the policy considerations against which any future application will be considered as well as the potential material planning considerations and key issues based on the information available to date. The list is not exhaustive and further matters may arise as and when a planning application is received and in the light of public representations and consultation responses. 9. IMPLICATIONS 9.1 Resource: Not applicable 9.2 Legal: Not applicable 9.3 Community (Equality, Poverty and Rural): Not applicable 9.4 Climate Change/Carbon Clever: Not applicable 9.5 Risk: Not applicable 9.6 Gaelic: Not applicable 10. RECOMMENDATION Members are asked to note the submission

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    49 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us