Water Orton Corridor Re-Signalling

Water Orton Corridor Re-Signalling

Water Orton Corridor Re-signalling Project Background Water Orton Corridor Re-signalling Water Orton Corridor Re-signalling constituted phase 2 of the renewal of Client Saltley Power Signal Box (PSB). UK Department for Transport The existing route relay based signalling system, which controls this Location strategic passenger and freight route was originally commissioned in Birmingham/Water Orton, UK the 1960’s. It required renewal because of the degraded condition of Start Date the equipment. 2009 The transfer of control to the West Midlands Signalling Centre is End Date consistent with Network Rail’s overarching strategy to manage 2012 the network from fewer, more modern Rail Operating Centres (ROCs). Duration 39 months Contract Value £122m Services Provided Signalling, train control and telecoms, programme management, feasibility design, asset management plan development For more information please visit www.networkrailconsulting.com Scope of Works Key Project Outputs This challenging project, comprising The main objective of the project was new signaller workstations, the renewal to renew the existing signalling system of interlocking equipment and all in modern equivalent form, providing lineside equipment for the 46 route at least another 35 years of use with miles of railway included: increased asset reliability. 2 new signaller Westcad The transfer of signalling control to the workstations and new West Midlands Signalling Centre and Westlock interlockings closure of the Washwood Heath signal box enabled a signaller headcount 6 new power supplies (DNO’s) reduction and a corresponding saving 5 new Principal Supply Points (PSP’s) in operational costs. 14 new under track crossings Amongst other benefits, the route capacity increased following the 196 new signals introduction of four aspect signalling 13 new cantilevers and 3 new between Nuneaton & Water Orton, gantries to support signals three aspect signalling on the Sutton Park Line and a remodelled junction 177 new Insulated Block Joints at Park Lane. 26 points converted or reconditioned. The above works were completed in 35 work stages and two main commissioning possessions with no unplanned disruption to performance and no major or reportable accidents. For more information please visit www.networkrailconsulting.com.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us