New Acland Coal Mine Stage 2 Expansion Project

New Acland Coal Mine Stage 2 Expansion Project

January 2006 NEW ACLAND COAL MINE STAGE 2 EXPANSION PROJECT ENVIRONMENTAL IMPACT STATEMENT Contents Executive Summary Glossary 1. Introduction 1-1 1.1 The Project 1-1 1.2 Project Description 1-1 1.3 Project Proponent 1-3 1.4 Study Team 1-4 1.5 Project Objectives and Scope 1-4 1.6 The Environmental Impact Assessment Process 1-4 1.6.1 Purpose of the EIS 1-4 1.6.2 Objectives of the EIS 1-5 1.6.3 Structure of the EIS 1-5 1.7 Public Consultation Process and Submissions 1-5 1.8 Project Approvals and Legislative Framework 1-6 1.8.1 Environmental Protection Act 1994 1-6 1.8.2 Mineral Resources Act 1989 1-10 1.8.3 Integrated Planning Act 1997 1-10 1.8.4 Water Act 2000 1-11 1.8.5 Aboriginal Cultural Heritage Act 2003 1-11 1.8.6 Queensland Heritage Act 1992 1-11 1.8.7 Nature Conservation Act 1992 1-12 1.8.8 Land Act 1994 1-12 1.8.9 Vegetation Management Act 1999 1-12 1.8.10 Transport Infrastructure Act 1994 1-12 1.8.11 Forestry Act 1959 1-12 1.8.12 Environment Protection and Biodiversity Conservation Act 1999 1-12 1.9 Project Need 1-13 2. Description of the Project 2-1 2.1 Key Elements of the Project 2-1 2.2 Project Need 2-1 2.3 The Coal Mine 2-4 2.3.1 Coal Resources and Coal Reserves 2-4 2.3.2 Resource Utilisation 2-5 2.3.3 Mining Tenures 2-5 2.3.4 Mining and Rehabilitation 2-5 2.3.5 Blasting 2-15 2.3.6 Mine Equipment 2-15 2.3.7 Mine Facilities and Infrastructure 2-15 2.4 Coal Handling and Processing 2-16 2.4.1 Coal Processing Chain 2-16 2.4.2 Product Coal 2-17 2.4.3 Dust Suppression 2-17 2.4.4 Coal Processing Waste Circuit 2-17 2.5 Coal Transport 2-19 New Acland Coal Mine Stage 2 Expansion Project – Environmental Impact Statement PAGE i 2.6 Water Management 2-20 2.6.1 System Overview 2-20 2.6.2 Separation of Runoff 2-20 2.6.3 Coal Process and Industrial Area 2-20 2.6.4 Sediment Control 2-22 2.6.5 Mine Water Management 2-22 2.6.6 Water Supply 2-22 2.7 Coal Transport 2-23 2.7.1 Train Movements 2-23 2.8 Road Realignment / Closure 2-23 2.9 Construction 2-23 2.9.1 Schedule 2-23 2.9.2 Material Volumes and Equipment 2-23 2.9.3 Transport of Plant and Equipment 2-24 2.10 Fire Protection System 2-24 2.11 Workforce 2-24 2.11.1 Construction Phase 2-24 2.11.2 Operational Phase 2-24 2.12 Decommissioning 2-25 2.13 Project Alternatives 2-25 2.13.1 No Project 2-25 2.13.2 Alternative Locations 2-25 2.13.3 Mining Options 2-25 2.13.4 Mining Techniques 2-25 2.13.5 Coal Wash Plant 2-26 2.13.6 Location of Dams 2-26 3. Land Resources 3-1 3.1 Existing Environment 3-1 3.1.1 Existing Land Use and Tenure 3-1 3.1.2 Land Use and Planning Provisions 3-1 3.1.3 Native Title 3-6 3.1.4 Sensitive Environmental Areas 3-6 3.1.5 Topography 3-7 3.1.6 Climate 3-7 3.1.7 Geology 3-9 3.1.8 Soils 3-12 3.2 Land Suitability 3-21 3.2.1 Limitations for Rainfed Cropping 3-21 3.2.2 Limitations for Beef Cattle Grazing 3-25 3.2.3 Pre-Mine Land Suitability 3-28 3.2.4 Post Mine Land Use Suitability 3-28 3.3 Good Quality Agricultural Land 3-30 3.4 Erosion Potential and Control 3-30 3.5 Contaminated Land 3-34 3.5.1 Potential for Contamination 3-34 3.5.2 Sampling, Analysis & Results 3-35 3.5.3 Contamination Prevention and Control 3-37 3.6 Overburden Characterisation and Management 3-37 PAGE ii New Acland Coal Mine Stage 2 Expansion Project – Environmental Impact Statement 3.6.1 Geochemistry and Acid Rock Drainage (ARD) Characterisation of Mine Waste 3-37 3.6.2 Management of Waste Rock 3-41 3.7 Rehabilitation 3-41 3.7.1 Proposed Post Mining Land Use 3-41 3.7.2 Post-Mine Landform 3-41 3.7.3 Mine Rehabilitation Strategies 3-42 3.7.4 Progressive Rehabilitation 3-44 3.7.5 Topsoil Management 3-44 3.7.6 Revegetation 3-45 3.7.7 Rehabilitation Success Criteria 3-45 3.7.8 Rehabilitation Maintenance 3-45 3.7.9 Rehabilitation Monitoring 3-46 3.7.10 Decommissioning 3-46 4. Water Resources 4-1 4.1 Surface Water Resources – Existing Environment 4-1 4.1.1 Existing Regional Hydrology 4-1 4.1.2 Existing Local Hydrology 4-3 4.2 Surface Water Resources - Impacts 4-3 4.2.1 Impacts on Regional Hydrology 4-3 4.2.2 Mine Water Management 4-4 4.2.3 Lagoon Creek Flooding Assessment 4-8 4.3 Surface Water Resources - Mitigation Measures 4-13 4.3.1 Monitoring programs 4-13 4.4 Surface Water Quality 4-15 4.4.1 Aquatic Impacts 4-17 4.4.2 Increase of Sediment Input into Rivers and Streams 4-17 4.4.3 Ecological Impacts due to Increased Hydrological Disturbance 4-18 4.4.4 Water Quality 4-18 4.5 Groundwater Quality 4-19 4.5.1 Groundwater Hydrology 4-19 4.5.2 Groundwater Quality 4-36 4.6 Ground Water Resources – Potential Impacts 4-40 4.6.1 Impacts on Groundwater – During Mine Dewatering and Operation 4-40 4.6.2 Impacts on Groundwater – Post-Mining 4-47 4.7 Final Void Water Quality Assessment 4-48 4.7.1 Groundwater Resources 4-48 5. Nature Conservation 5-1 5.1 Terrestrial Flora and Fauna – Overview 5-1 5.1.1 Environment Protection and Biodiversity Conservation Act 1999 Matters 5-1 5.1.2 Field Survey Methods 5-2 5.2 Terrestrial Flora and Fauna – Existing Environment 5-5 5.2.1 Terrestrial Flora 5-5 5.2.2 Community Descriptions 5-6 5.2.3 Vegetation Corridors 5-8 5.2.4 Weeds of Management Concern 5-8 5.2.5 Terrestrial Fauna 5-8 5.3 Terrestrial Flora and Fauna - Impacts 5-13 New Acland Coal Mine Stage 2 Expansion Project – Environmental Impact Statement PAGE iii 5.4 Terrestrial Flora and Fauna - Mitigation Measures 5-13 5.4.1 Weed Management Strategies 5-14 5.4.2 Pest and Domestic Animal Management 5-14 5.4.3 Revegetation and Rehabilitation 5-14 5.4.4 Ongoing Monitoring of Flora and Fauna 5-15 5.5 Conclusions and Recommendations – Terrestrial Flora and Fauna 5-15 5.6 Aquatic Ecology 5-15 5.6.1 Background 5-15 5.6.2 Aquatic Habitat 5-17 5.6.3 Fish Communities 5-17 5.6.4 Aquatic Macroinvertebrates 5-18 6. Air Quality 6-1 6.1 Existing Environment 6-1 6.1.1 Climate 6-1 6.1.2 Existing Air Quality 6-5 6.2 Air Quality Legislation and Dust Criteria 6-7 6.2.1 Dust Concentration 6-7 6.2.2 Dust Deposition 6-8 6.3 Air Quality Impact Assessment 6-8 6.3.1 Sources of Air Emissions 6-8 6.3.2 Estimation of Dust Emissions 6-8 6.3.3 Modelling Methodology 6-11 6.3.4 Input Meteorology 6-12 6.4 Air – Potential Impacts 6-13 6.4.1 Current Operations 6-13 6.4.2 2015 Operations 6-16 6.4.3 Discussion 6-19 6.5 Other Issues 6-19 6.5.1 Odour 6-19 6.5.2 Jondaryan Rail Siding 6-19 6.5.3 Vegetation Impacts 6-20 6.5.4 Livestock and Wildlife Impacts 6-20 6.6 Greenhouse Gases 6-20 6.7 Air Quality Management Strategies 6-21 6.8 Monitoring 6-22 6.9 Conclusion 6-22 7. Noise and Vibration 7-1 7.1 Overview 7-1 7.2 Existing environment 7-1 7.2.1 Background noise levels 7-1 7.2.2 Local and regional meteorology 7-5 7.3 Noise - Legislative context 7-7 7.3.1 Environmental Protection (Noise) Policy 1997 7-8 7.3.2 Environmental Authority (EA) 7-8 7.3.3 Road traffic noise criteria 7-8 7.3.4 Project specific assessment criteria 7-9 7.4 Management of impacts on environmental values 7-9 PAGE iv New Acland Coal Mine Stage 2 Expansion Project – Environmental Impact Statement 7.4.1 Overview 7-9 7.4.2 Equipment noise levels 7-9 7.4.3 Noise level prediction methodology 7-10 7.4.4 Modelling results 7-11 7.4.5 Airblast overpressure and vibration 7-15 7.4.6 Road noise 7-16 7.4.7 Impacts on animals 7-17 7.5 Mitigation measures 7-17 7.5.1 Noise impacts 7-17 7.5.2 Airblast overpressure and vibration 7-18 7.6 Conclusions 7-18 8. Cultural Heritage 8-1 8.1 Existing Values 8-1 8.1.1 Previous Studies 8-1 8.1.2 Legislative Context 8-1 8.2 Assessment Methodology 8-2 8.2.1 Scientific Significance 8-2 8.2.2 Aboriginal Significance 8-3 8.3 Indigenous Cultural Heritage – Aboriginal Significance 8-3 8.4 Non-indigenous Cultural Heritage 8-4 8.5 Potential Impacts and Mitigation Measures 8-4 8.5.1 Indigenous Cultural Heritage 8-4 8.5.2 Non-Indigenous Cultural Heritage 8-5 9.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    17 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us