Amba River (44.971Km) Nw-10

Amba River (44.971Km) Nw-10

CIN: U74899DL2000PTC104134 CIN: TRACTEBEL ENGINEERING pvt. ltd. - Registered office: A-3 (2nd Floor), Neeti Bagh - New Delhi - 110049 - INDIA Comments: Subject: Project: Client: tractebel-engie.com [email protected] 86 85 469 124 +91 fax - 00 85 469 124 +91 tel. Gurgaon 122 002 (Haryana) – INDIA 37, Institutional Area, Sector 44 Intec House Ltd. Pvt., ENGINEERING TRACTEBEL REV. 01 YY/MM/DD 19/04/30 INLAND WATERWAYS AUTHORITYINDIA OF DETAILED PROJECT REPORT – AMBA RIVER (44.971km) NW-10 (44.971km) RIVER AMBA – REPORT PROJECT DETAILED NATIONALWATERWAYS CONSULTANCY SERVICES FOR PREPARATION OFSECOND STAGE DPROF CLUSTER –7 OF Revision No. Imputation: P.010257 TS: Our ref.: REV.01 STAT. Active P.010257-W-10305-03 WRITTEN 2019 04 30 Date SARIKA KUMARI , Bidhan Chandra JHA Prepared / Revision By VERIFIED DPR ARUN KUMAR – AMBA RIVER (44.971KM) NW (44.971KM) RIVER AMBA APPROVED N. SIVARAMAN N. Final Submission Description VALIDATED B.C.JHA RESTRICTED - 10 This document is the property of Tractebel Engineering pvt. ltd. Any duplication or transmission to third parties is forbidden without prior written approval P.010257-W-10305-003 from time to time to make this report success. Arya, (Hydrographic Chief) andMr Rajeev Singhal (SHS) who provided their valuable guidance Member, Technical & Sr Consultant); Vice Admiral (Retd.) S. K. Jha (Sr. Advisor); Capt. Ashish The consultants are grateful to Mr. S. K. Gangwar, Member (Technical), Mr. R. P. Khare (Ex. access to information and advice rendered by IWAI. ready and cooperation of appreciation deep their record on like toput would consultant The study. study has been carried out for this assignment and the result has been compiled in the present of Second Stage Detailed Project Report (DPR) of Cluster – 7of National Waterways”. The InlandWaterways Authority of India (IWAI) assigned the Consultancy Services for “Preparation ACKNOWLEDGEMENTS Tractebel Engineering Pvt Ltd Rev. 01 Rev. RESTRICTED (B.C. JHA) This document is the property of Tractebel Engineering Pvt. Ltd.. Any duplication or transmission to third parties is forbidden without prior written approval P.010257-W-10305-003 Government or Government of India. analysis, change inrequirement of the Government (or) change in policy either of State This Report can be updated at a later stage, when required by considering the fresh cargo misusing the information. misuse of information andany claim arising thereof, cost and consequence will be on the party intended tobe used for the mentioned purpose/project only, aspermitted by IWAI. In case of India (IWAI)”,Ministry ofShipping, Government of TheIndia. information contained in this DPR is Proprietary rights of the information contained herein belong to “InlandWaterways Authority of appropriately. placed and summarized Stake Holder’s meet was considered on 04/12/2017 at “Mumbai” and the viewpoints have been Laboratory Tests have been carried out on the collected samples. subsequently and 28/06/2017 to from 26/06/2017 out carried was Borehole Geotechnical 26/04/2017. outon carried was Survey Land Terminal Traffic Survey was carried out, as detailed and summarized in Annexure 4.2. to04/12/2016. 25/11/2016 Detailed Hydrographic Survey along with the Topographical Surveywas carried out from /investigations. fieldstudies following of the findings the on based compiled the study on NW – 10Amba River has been carried out for this assignment / analysed / Cluster – 7 of National Waterways” byInland Waterways Authority of India (IWAI). Accordingly, Consultancy Services for the “Preparation of Second Stage Detailed Projectwith the assigned been Report has (DPR) Gurgaon (M/s TEPL), of Ltd., Pvt., Engineering Tractebel M/s RIGHTS /PROPREITORY DISCLAIMER Rev. 01 Rev. Tractebel Engineering Pvt Ltd RESTRICTED (B.C. JHA) This document is the property of Tractebel Engineering Pvt. Ltd.. Any duplication or transmission to third parties is forbidden without prior written approval P.010257-W-10305-003 CHAPTER 2: CHAPTER 1: 24 SUMMARY......................................................................................................... EXECUTIVE ............................................................................................................. 20 FEATURES SALIENT ..................................................................................................... 19 LIST OF ABBREVIATIONS ................................................................................................................. 16 FIGURES OF LIST 13 TABLES.................................................................................................................... OF LIST 4 ................................................................................. RIGHTS / PROPREITORY DISCLAIMER ......................................................................................................... 3 ACKNOWLEDGEMENTS TABLE OF CONTENTS DPR –RIVERAMBA (44.971KM)NW-10 WATERWAYS NATIONAL OF OF CLUSTER-7 DPR STAGE SECOND OF PREPARATION FOR SERVICES CONSULTANCY 2.2. 2.1. 1.4. 1.3. 1.2. 1.1. 2.2.1. ............................................................................. 67 Structures Existing Waterway 2.1.3. 2.1.2. 2.1.1. ........................................................................................... 39 Survey Hydrographic ............................................................. 36 Area ofStudy / Details Location Project ........................................................................... 36 & Approach Brief Methodology 1.2.5. 1.2.4. 1.2.3. 1.2.2. 1.2.1. ............................................... 34 statement Compliance and Work of Scope Brief ....................................... 32 study ofprevious Summary and Background Project Bridges67 ................................................................. 62 Datum / Sounding Datum Chart 62 levels.............................. Reference Topographical / Hydrological Existing ................. 39 Characteristics Hydro-morphological and inGeneral Waterway ............................. 39 SURVEY HYDROGRAPHIC / DETAILED WATERWAY ...................................................................................... 35 Analysis Financial .................................................................................. 35 Requirement Vessel 35 Development............................................................................... Terminal ................................................................................. 35 Confirmations Traffic ................................................................................ 34 Development Fairway ....................................................................................... 32 INTRODUCTION Rev. 01 Rev. RESTRICTED This document is the property of Tractebel Engineering Pvt. Ltd.. Any duplication or transmission to third parties is forbidden without prior written approval P.010257-W-10305-003 CHAPTER 4: CHAPTER 3: 2.6. 2.5. 2.4. 2.3. 4.3. 4.2. 4.1. 3.9. 3.8. 3.7. 3.6. 3.5. 3.4. 3.3. 3.2. 3.1. 2.2.4. 2.2.3. 2.2.2. 4.3.2. 4.3.1. .................................................................................. 122 Composition Commodity 4.2.4. 4.2.3. 4.2.2. 4.2.1. ............................................................................................. 97 Analysis Hinterland ................................................................................................................. 96 General 3.9.2. 3.9.1. ................................................................................................... 95 Fairway Costing 95 Acquisition.................................................................................................. Land ........................... 95 depth toimprove /Weirs /Locks / Barrages Dams Proposed ................................................................................ 92 / / Weirs Aqueducts Anicuts Modification Requirement in existing Bridges / / Cables Dams /Barrages /Locks/ ............................................................... 91 Aids / Navigation Markings Navigation .................................................. 89 Strengthening / Embankment Protection Bank 3.3.3. 3.3.2. 3.3.1. 83 Activities....................................................................... Conservancy Proposed .............. 81 works) development proposed and Width (Length, ofShoals Details ................................................................... 80 Waterway /Typeof Class Proposed ................................................... 79 Results and analysis Samples andSoil Water .......................................................................................... 71 description Waterway ........................................................................... 70 Details Discharge and Velocity ................................................................................................................... 70 Bends Iron Ore Iron 124 ........................................................................................... 124 Thermal Coal ....................................................... 116 Ports Major &Non Major from Traffic ................................................................ 110 Industries & Proposed Existing ............................................................... 99 Maharashtra of profile Economic .............................................................. 98 Hinterland of Profile Demography ...................................................................................... 96 STUDY TRAFFIC ................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    415 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us