Form – I “ROYAL NESTO” Proposed Construction of Residential Development FORM – I I. BASIC INFORMATION S.No. Item Details Proposed Construction of Residential Development “Royal Nesto” by K. K. Chandrasekar, S. Krishna 1 Name of the project Kishor, B. Paranthaman Sethupathi, S. Paulvannan, N. Sudhakar, and K. Vijayan 2 S. No. in the schedule 8 (a) Area Details: Description 3 Proposed area Total Plot Area (Sqm) 40,400.00 Total Built up Area (Sqm) 39,246.99 4 New/Expansion/Modernization New 5 Existing capacity/Area etc -- 6 Category of project i.e. ‘A’ or ‘B’ ‘B’ Does it attract the general condition? 7 No If yes, please specify Does it attract the specific condition? 8 No If yes, please specify SF. Nos.: 556/2C2,3B2,4A,5B,6B,7,8,9,10,11A,12A, 12B2, 13B,14B&15A, Plot/Survey / Khasra No 557/2,3B,4B,5B,6,7,8A,9A1,9B1,10A,11A,12,13,1 4B,18B,19B,20,21 & 23A1, 9 558/1A & 2A Village Neelambur Village Tehsil Sulur North Taluk District Coimbatore District State Tamilnadu Nearest railway station/airport along Railway station : Sulur (3 kms) 10 with distance in km Airport : Coimbatore Airport (6.25 km) Nearest town, city, district Town : Coimbatore (5 km) 11 headquarters along with distance in City : Coimbatore (5 km) km District head quarters : Coimbatore (5 Km) Coimbatore Town Planning Authority Village panchayats, Zilla parishad, Corporation commercial complex, Raja Naidu St., municipal corporation, local body 12 Tatabad, Sivananda colony, Coimbatore- 641012 (Complete postal addresses with The Special Officer/ Executive Officer, telephone nos. to be given) Neelambur Panchayat, Sulur Tk., Coimbatore Dt. K. K. Chandrasekar, S. Krishna Kishor, 13 Name of the applicant B. Paranthaman Sethupathi, S. Paulvannan, N. Sudhakar, and K. Vijayan 17 Form – I “ROYAL NESTO” Proposed Construction of Residential Development C/o. M/s. Sabari Constructions Technologies Pvt. Ltd., 14 Registered address No.68, Kalluri Nagar, Anna Nagar, Peelamedu, Coimbatore – 641 043 Address for correspondence: K. K. Chandrasekar, S. Krishna Kishor, Name B. Paranthaman Sethupathi, S. Paulvannan, Designation N. Sudhakar, and K. Vijayan 15 Address C/o. Sabari Constructions Technologies Pvt. Ltd., Pin code No.68, Kalluri Nagar, Anna Nagar, Peelamedu, E-mail Coimbatore – 641 043 Telephone No. / Fax No. Email: [email protected] Phone: 0422 2578430, 9842786869 Details of alternative sites examined, No 16 if any, Location of these sites should be shown on a topo sheet 17 Interlinked projects No interlinked projects Whether separate application of 18 interlinked project has been No submitted? 19 If yes, date of submission -- 20 If no, reason -- Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. 21 (a) The forest (conservation) Act, Not required 1980? (b) The wild life (Protection) Act, 1972? (c) The CRZ Notification 1991 Whether there is any government 22 order/policy relevant/relating to the No site 23 Forest land involved (hectares) No Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? 24 a) Name of the Court No b) Case No c) Orders/directions of the court, if any and its relevance with the proposed project 18 Form – I “ROYAL NESTO” Proposed Construction of Residential Development II. ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies etc.) Details thereof (with approximate quantities S. Information/Checklist Yes/ /rates, wherever possible) with sources of No. confirmation No information data Permanent or temporary change in land use, land cover or topography The area is classified as Residential Land Use 1.1 including increase in Yes Zone by Coimbatore Town Planning Authority. intensity of land use (with respect to local land use plan) Clearance of existing land, 1.2 No -- vegetation and buildings? 1.3 Creation of new land uses? No Pre-construction Geo-technical investigations have been carried out 1.4 investigations e.g. bore Yes & the copy is enclosed as Annexure – IX. holes, soil testing ? 1.5 Construction works? No -- 1.6 Démolition Works ? No -- All the construction activities including stacking of Temporary sites used for raw materials will be confined within the project construction works or site only. No temporary labour hutments are 1.7 No housing of construction proposed. Local laborers from nearby areas will be workers? hired for the work. Proper sanitation facilities for them will be provided at site. 1.8 Above ground buildings, structures or earthworks Yes Details of buildings are given in Conceptual Plan including linear structures, cut and fill or excavations Underground works 1.9 including mining or No -- tunneling? 1.10 Reclamation Works? No -- 1.11 Dredging? No -- 1.12 Offshore structures? No -- Production and 1.13 No -- manufacturing processes? Separate raw material handling yard will be Facilities for storage of 1.14 Yes located within the project site and separated by goods or materials? enclosures/barricades. Cement will be separately 19 Form – I “ROYAL NESTO” Proposed Construction of Residential Development stored under cover in bales. Sand will be stacked under tarpaulin cover. Bricks and steel will be laid in the open. Solid Waste: Wastes generated are segregated into Bio degradable waste & non - bio degradable waste. The biodegradable wastes are handed over to local Facilities for treatment or collection system, non biodegradable recyclable 1.15 disposal of solid waste or Yes wastes are sent to the authorized recyclers. liquid effluents? Liquid Effluent: The generated sewage of quantity 139 KLD from the buildings is treated in the Sewage Treatment Plant of Capacity 150 KLD and the treated water is reused for toilet flushing and gardening. Facilities for long term No 1.16 housing of operational -- workers? New road, rail or sea traffic 1.17 during construction or No -- operation? New road, rail, air waterborne or other transport infrastructure 1.18 No -- including new or altered routes and stations, ports, airports etc? Closure or diversion of existing transport routes or 1.19 infrastructure leading to No -- changes in traffic movements? New or diverted 1.20 transmission lines or No -- pipelines? Impoundment, damming, culverting, realignment or 1.21 other changes to the No -- hydrology of watercourses or aquifers? 1.22 Stream crossings? No -- Abstraction or transfers of 1.23 water from ground or No -- surface waters? 20 Form – I “ROYAL NESTO” Proposed Construction of Residential Development Changes in water bodies or 1.24 the land surface affecting No -- drainage or run-off? Transport of personnel or Transportation of personnel and material by road materials for construction, 1.25 Yes will be necessary for the contractors during the operation or construction phase. decommissioning? Long-term dismantling or decommissioning which 1.26 No -- could have an impact on the environment? Ongoing activity during decommissioning which 1.27 No -- could have an impact on the environment? There will be an influx of people after the Influx of people to an area construction phase. In addition to this there will be 1.28 in either temporarily or Yes an influx of population due to the development of permanently? supporting facilities stimulated by the project. Introduction of alien 1.29 No -- species? The existing land is devoid of herbs and shrubs or Loss of native species or No 1.30 any other vegetation. So there will be no loss of genetic diversity? significant native species or bio-diversity. 1.31 Any other actions? No -- 2. Use of Natural resources for construction or operation of the Project (Such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate quantities / S. Information/Checklist Yes rates, wherever possible) with sources of No. confirmation /No information data Land especially undeveloped 2.1 Yes Barren Land or agricultural land (ha) Construction Stage: Private Tanker Water Supply will be used for construction purposes and it is estimated that Water (expected source & 10KLD will be daily requirement. 2.2 Yes competing users) Unit: KLD Operation Stage: About 96 KLD of raw (fresh) water will be required after construction and this will be met from TWAD Board Supply. 2.3 Minerals (MT) No Not envisaged. 21 Form – I “ROYAL NESTO” Proposed Construction of Residential Development Construction material – stone, 2.4 Construction materials purchased from the local aggregates, and / soil (expected Yes market. source- cum) 2.5 Forests & timber (source– MT) No -- The estimated power requirement during operation phase is about 1000 KVA and it will Energy including electricity be sourced from the nearby TNEB grid which and fuels (source, competing will be distributed through the transformers 2.6 Yes users) Unit: fuel (litres/hour), within our premises. For emergency purposes, it energy (kVA) is proposed to use DG sets of the following capacities 2 Nos. of 320 KVA Any other natural resources No 2.7 -- (use appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Details thereof (with approximate quantities S. Information/Checklist Yes/ /rates, wherever possible) with sources of No. confirmation No information data The proposed project is a residential Use of substance or materials, construction project and hence and no storage of which are hazardous (as per hazardous chemicals (as per MSIHC) will be MSIHC rules) to human 3.1 Yes done, apart from Diesel. HSD (of low sulphur health or the environment content) will be used for DG sets. Necessary (flora, fauna, and water permission will be obtained from the authorities supplies) concerned for storage of the same.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages12 Page
-
File Size-