Earthquake Ready Burnside Bridge Economics Technical Report

Earthquake Ready Burnside Bridge Economics Technical Report

Economic Impacts Technical Report Multnomah County | Earthquake Ready Burnside Bridge Project Portland, OR January 29, 2021 Earthquake Ready Burnside Bridge Economic Impacts Technical Report Prepared for Multnomah County Transportation Division – Bridges 1403 SE Water Avenue Portland, OR 97214 Prepared by HDR 1050 SW 6th Avenue, Suite 1800 Portland, OR 97204 T (503) 423-3700 Contract# DCS-SVCSGEN-857-2019-conv HDR Project #10144814 CERTIFICATION The technical material and data contained in this document were prepared under the supervision and direction of the undersigned, as a professional economist. Signature Reserved for Final Version Prepared by Ewa Tomaszewska (Economist) Signature Reserved for Final Version Checked by Chris Williges (Economist) Signature Reserved for Final Version Approved by Heather Catron (Consultant Project Manager) Economic Impacts Technical Report Multnomah County | Earthquake Ready Burnside Bridge Project Contents Executive Summary ....................................................................................................................1 1 Introduction .......................................................................................................................1 1.1 Project Location.........................................................................................................1 1.2 Project Purpose .........................................................................................................1 2 Project Alternatives.............................................................................................................3 3 Definitions .........................................................................................................................3 4 Legal Regulations and Standards .........................................................................................4 4.1 Laws, Plans, Policies, and Regulations .........................................................................4 4.2 Design Standards ......................................................................................................4 5 Affected Environment..........................................................................................................4 5.1 Area of Potential Impact ..............................................................................................4 5.2 Resource Identification and Evaluation Methods .............................................................7 5.2.1 Published Sources and Databases ....................................................................7 5.2.2 Field Visits and Surveys...................................................................................7 5.3 Existing Conditions.....................................................................................................7 5.3.1 Existing Conditions Analysis and Assessment .....................................................7 5.3.2 Population Characteristics................................................................................8 5.3.3 Households and Housing Trends .................................................................... 11 5.3.4 Employment and Unemployment..................................................................... 14 5.3.5 Household Income, Poverty, and Homelessness ............................................... 18 5.3.6 Business Activity .......................................................................................... 21 5.3.7 Population and Employment Forecasts ............................................................ 25 5.3.8 Road Network .............................................................................................. 25 6 Impact Assessment Methodology and Data Sources.............................................................. 26 6.1 Long-Term Impact Assessment Methods ..................................................................... 26 6.1.1 Traffic and Travel Patterns ............................................................................. 26 6.1.2 Impacts on Traffic Safety ............................................................................... 26 6.1.3 Impacts on Businesses, Community Facilities, and Community Services............... 27 6.1.4 Impacts on Land Use/Developable Parcels ....................................................... 27 6.1.5 Noise Impacts in Project Vicinity ..................................................................... 27 6.1.6 Bridge Seismic Resiliency in Case of an Earthquake .......................................... 28 6.2 Short-Term Impact Assessment Methods .................................................................... 28 6.2.1 Disruptions, Detours and Delays to Traffic Using the Burnside Bridge ................... 28 6.2.2 Disruptions and Delays to Other Transportation in the API .................................. 29 6.2.3 Right-of-Way, Impeded Access, and Displacement Impacts ................................ 29 6.2.4 Increased Noise ........................................................................................... 29 6.2.5 Business and Employment Opportunities Impacts.............................................. 29 6.3 Indirect Impact Assessment Methods .......................................................................... 30 6.4 Cumulative Impact Assessment Methods..................................................................... 30 7 Environmental Consequences ............................................................................................ 31 7.1 Introduction ............................................................................................................. 31 7.2 Pre-Earthquake Impacts ........................................................................................... 31 7.2.1 No-Build ...................................................................................................... 31 7.2.2 Enhanced Retrofit ......................................................................................... 32 January 29, 2021 | i Economic Impacts Technical Report Multnomah County | Earthquake Ready Burnside Bridge Project 7.2.3 Replacement, Short-span .............................................................................. 36 7.2.4 Replacement, Long-span ............................................................................... 37 7.2.5 Replacement with Couch Extension................................................................. 37 7.3 Post-Earthquake Impacts .......................................................................................... 39 7.3.1 No-Build ...................................................................................................... 39 7.3.2 Enhanced Retrofit ......................................................................................... 40 7.3.3 Replacement, Short-span .............................................................................. 40 7.3.4 Replacement, Long-span ............................................................................... 41 7.3.5 Replacement with Couch Extension................................................................. 41 7.4 Construction Impacts ................................................................................................ 41 7.4.1 Without Temporary Bridge ............................................................................. 41 7.4.2 With Temporary Bridge.................................................................................. 50 7.4.3 Potential Off-site Staging Areas ...................................................................... 57 7.5 Cumulative Effects ................................................................................................... 58 7.5.1 No-Build Alternative ...................................................................................... 58 7.5.2 Build Alternatives.......................................................................................... 58 7.6 Compliance with Laws, Regulations, and Standards...................................................... 59 7.7 Conclusions ............................................................................................................ 59 8 Mitigation Measures.......................................................................................................... 61 8.1 Enhanced Retrofit .................................................................................................... 61 8.2 Replacement, Short-span.......................................................................................... 62 8.3 Replacement, Long-span .......................................................................................... 62 8.4 Replacement with Couch Extension ............................................................................ 62 8.5 Temporary Bridge Option .......................................................................................... 62 9 Contacts and Coordination................................................................................................. 62 10 Preparers ........................................................................................................................ 62 11 References...................................................................................................................... 63 Tables Table 1. Study Area 2017 Population .............................................................................................8 Table 2. Population Trends...........................................................................................................9

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    82 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us