Appendix-C TARIFF FILING FORMS (TRANSMISSION)

Appendix-C TARIFF FILING FORMS (TRANSMISSION)

Appendix-C TARIFF FILING FORMS (TRANSMISSION) Page 34 INDEX Checklist of Forms and other information/ documents for tariff filing for Transmission System Form No. Tariff Filing Formats (Transmission) Tick FORM-1 Summary sheet √ FORM-2 Details of Transmission Lines and Substations √ FORM-3 Normative Parameters considered for tariff calculations √ FORM- 4 Details of Foreign loans FORM-5 Abstract of Admitted Cost for the existing Projects FORM-5A Abstract of Project Cost Estimates and Schedule of Commissioning for the new Projects FORM-5B Break-up of Project Cost for Transmission System FORM-5C Break-up of Construction/Supply/Sevice packages FORM-5D Details of elementwise cost FORM- 6 Financial Package upto COD FORM- 7 Details of Project Specific Loans FORM- 8 Details of Allocation of corporate loans to various transmission elements FORM-9 Statement of Additional Capitalisation after COD FORM-10 Financing of Additional Capitalisation FORM-11 Statement of depreciation √ FORM-12 Calculation of depreciation rate FORM-13 Calculation of Weighted Average Rate of Interest on Actual Loans √ FORM-14 Calculation of Advance Against Depreciation FORM-15 Calculation of Interest on Working Capital √ FORM-16 Draw Down Schedule for Calculation of IDC & Financing Charges Other Information/ Documents Sl. No. Information/Document Tick 1 Certificate of incorporation, Certificate for Commencment of Business, Memorandum of Association, & Articles of Association ( For New Station setup by a company making tariff application for the first time to CERC) 2 Regionwise and Corporate audited Balance Sheet and Profit & Loss Accounts with all the Schedules & annexures for the new Transmission System & for the relevant years. 3 Copies of relevant loan Agreements 4 Copies of the approval of Competent Authority for the Capital Cost and Financial package. 5 Copies of the Equity participation agreements and necessary approval for the foreign equity. 6 Copies of the BPTA/TSA with the beneficiaries, if any 7 Detailed note giving reasons of time and cost over run, if applicable. 8 Any other relevant information, (Please specify) Note: Electronic copy in the form of CD/Floppy disc shall also be furnished. Page 35 FORM- 1 Summary Sheet Name of the Tansmission Licensee Gujarat Energy Transmission Corporation Ltd. Name of the Transmission System: Name of the Region: Gujarat (Rs. in Crs) 2014-15 S.No. Particulars (Actual) 1 2 3 1 Depreciation FORM- 11 601.09 2 Interest on Loan & financing charges FORM- 13A 440.31 3 Return on Equity1 503.59 4 Advance against Depreciation FORM- 14 0.00 5 Interest on Working Capital FORM- 15 70.51 6 O & M Expenses* 726.49 8 Provision for Taxes 83.66 9 Incentive 38.40 10 Less: Expenses Capitalized 0.00 11 Less: Other Income 167.23 12 Contingency Reserve 64.00 Total 2360.81 1 Details of calculations, considering equity as per regulation, to be furnished. Petitioner Page 36 Form 2 Details of Transmission Lines (As of 30th September, 2015) Name of the Transmission Licensee: Gujarat Energy Transmission Corporation Limited Name of Transmission System Name of Region: Gujarat Voltage Line Length Date of Commercial Sr. No. Name of Transmission Line Name of Circle SC/DC Level (KV) (Ckt. Km) Operation 400 KV Transmission Line Kosamba-Ukai (Asoj-Ukai made LILO at 22-3-88 1 Bharuch S/C 400kV 91 Kosamba) (31-12-2011) Kosamba-Asoj (Asoj-Ukai made LILO at 22-3-88 2 Bharuch S/C 400kV 122.35 Kosamba) (31-12-2011) 3 Ukai Kosamba- 1 Bharuch DC 400kV 68 30.03.13 4 Ukai Kosamba- 2 Bharuch DC 400kV 68 30.03.13 5 Chorania Kosamba 1 Bharuch DC 400kV 228.5 05.07.14 6 Chorania Kosamba 2 Bharuch DC 400kV 228.5 05.07.14 7 Asoj-Wankabori Jambuva S/C 400kV 76 22-3-86 8 Chorania-Amreli Chorania S/C 400kV 164 01/08/2000 9 Asoj-Chorania-2 Jambuva S/C 400kV 177 18/12/2008 10 Asoj-Chorania-1 Jambuva S/C on D/C 400kV 166 29/03/1994 11 Asoj-SSP Jambuva S/C on D/C 400kV 83 28/09/2005 12 Kasor-SSP Nadiad S/C on D/C 400kV 146 07/12/2004 13 Kasor-GPEC Nadiad S/C 400kV 98 29/04/1999 14 Kasor-Chorania Nadiad S/C on D/C 400kV 103 02/10/1997 15 Vadavi-Dehgam(PGCIL)-1 Mehsana D/C 400kV 62.3 27/06/2007 16 Vadavi-Dehgam(PGCIL)-2 Mehsana D/C 400kV 62.3 27/06/2007 17 Soja-Dehgam(PGCIL) Himatnagar S/C 400kV 40 29-3-05 18 Dehgam(PGCIL)-Wanakbori Himatnagar S/C 400kV 67 29-3-05 19 Soja-Wanakbori Himatnagar S/C 400kV 95.1 22-10-88 20 Soja-Kansari Palanpur S/C 400kV 135 02/08/2000 21 Amreli-Jetpur-1 Amreli S/C 400kV 96 01/08/2000 Chorania S/C 19.10.93 22 Chorania-Hadala(LILO at Hadala) 400kV 166.4 (27.3.07) Gondal S/C 19.10.93 23 Hadala-Jetpur(LILO at Hadala) 400kV 115 (26.5.07) 24 Mundra(APL)-Hadala Gondal S/C 400kV 238 11/02/2011 25 Vadinar-Hadala-1 Gondal D/C 400kV 112.88 25-4-11 26 Vadinar-Hadala-2 Gondal D/C 400kV 112.88 25-4-11 27 Mundra(APL)-Varsana Anjar S/C 400kV 86.05 13/01/2011 28 Varsana-Hadala Anjar S/C 400kV 154 12/01/2011 29 APL-VARSANA -2 Anjar D/C 400kV 80.042 31.03.2015 30 APL-VARSANA -3 Anjar D/C 400kV 80.042 31.03.2015 31 Amreli-Jetpur-2 Amreli S/C on D/C 400kV 66 22.11.13 32 Amreli- Hadala Amreli S/C on D/C 400kV 173 22.11.13 220 KV Transmission Line 1 Karamsad-Kasor-1 Nadiad D/C 220 KV 12.00 28/05/1997 2 Karamsad-Kasor-2 Nadiad D/C 220 KV 12.00 28/05/1997 S/C ON D/C 3 Karamsad-Kasor-3[Kasor-Vertej] Nadiad 220 KV 12.50 09/09/1998 Tower line 4 Kasor-Botad Nadiad D/C 220 KV 144.00 08/09/1997 S/C ON D/C 5 LILO at CCPP-1 [Dhuvaran] Nadiad 220 KV 39.00 2.05.14 Tower line 6 Karamsad-Ranasan-1 Nadiad D/C 220 KV 71.44 22/01/1976 7 Karamsad-Ranasan-2 Nadiad D/C 220 KV 71.44 22/01/1976 8 Karamsad-Salejada Nadiad S/C 220 KV 76.80 13/01/1999 S/C ON D/C 9 Karamsad-Vartej Nadiad 220 KV 191.20 06/01/1973 Tower line 10 Karamsad-Gpec-1 Nadiad D/C 220 KV 94.50 16/09/1999 11 Karamsad-Gpec-2 Nadiad D/C 220 KV 94.50 16/09/1999 12 Kapadwanj-Ranasan-1 Nadiad D/C 220 KV 63.52 18/09/1993 13 Kapadwanj-Ranasan-2 Nadiad D/C 220 KV 63.52 18/09/1993 14 Wanakbori-Kapadwanj-1 Nadiad D/C 220 KV 35.76 18/09/1993 15 Wanakbori-Kapadwanj-2 Nadiad D/C 220 KV 35.76 18/09/1993 16 Khanpur-AECo.-1 Nadiad D/C 220 KV 30.08 08/01/1999 17 Khanpur-AECo.-2 Nadiad D/C 220 KV 30.08 08/01/1999 18 Khanpur-Kapadwanj-1 Nadiad D/C 220 KV 40.00 30/07/1999 19 Khanpur-Kapadwanj-2 Nadiad D/C 220 KV 40.00 30/07/1999 20 Khanpur-PGCL-1 Nadiad D/C 220 KV 11.77 16/12/1994 21 Khanpur-PGCL-2 Nadiad D/C 220 KV 11.77 16/12/1994 22 Ranasan-Gandhinagar-1 Nadiad D/C 220 KV 19.83 21/09/1976 Page 37 Voltage Line Length Date of Commercial Sr. No. Name of Transmission Line Name of Circle SC/DC Level (KV) (Ckt. Km) Operation 23 Ranasan-Gandhinagar-2 Nadiad D/C 220 KV 19.83 15/11/1975 24 Ranasan-PGCL-1 Nadiad D/C 220 KV 19.63 16/12/1994 25 Ranasan-PGCL-2 Nadiad D/C 220 KV 19.63 16/06/1995 26 Salejada-Chorania Nadiad D/C 220 KV 75.30 10/03/1998 27 Salejada-Bhat-1 Nadiad D/C 220 KV 26.30 19/6/2010 28 Salejada-Bhat-2 Nadiad D/C 220 KV 26.30 19/6/2010 29 Bhat-Pirana-1 Nadiad D/C 220 KV 14.63 05/12/2011 30 Bhat-Pirana-2 Nadiad D/C 220 KV 14.63 05/12/2011 31 220KV Agiyol-Vijapur HMT S/C 220 35.2 17/12/1992 32 220KV Agiyol-Bhutiya-1 HMT D/C 220 35.6 31/05/2005 33 220KV Agiyol-Bhutiya-2 HMT D/C 220 35.6 30/10/2005 34 220KV Dhansura-Agiyol-1 HMT D/C 220 33.42 08/08/1990 35 220KV Dhansura-Agiyol-2 HMT D/C 220 35.81 29/09/2000 36 220KV Kadana-1-Dhansura HMT D/C 220 75.6 09/06/1984 37 220KV Kadana-2-Dhansura HMT D/C 220 75.6 24/12/1991 38 220KV Wanakbori-1-Dhansura HMT D/C 220 58.9 26/04/1991 39 220KV Wanakbori-2-Dhansura HMT D/C 220 58.9 31/10/1992 40 220KV Gandhinagar-Jamla 1 Line HMT D/C 220 22 21/08/1998 41 220KV Gandhinagar-Jamla 2 Line HMT D/C 220 22 21/08/1998 42 220KV Jamla-Kheralu 1 line HMT D/C 220 62 26/08/1998 43 220KV Jamla-Kheralu 2 line HMT D/C 220 62 26/08/1998 44 220KV Gandhinagar-Soja - 1 HMT S/C & D/C 220 16 26/11/1986 45 220KV Gandhinagar-Soja - 2 HMT S/C & D/C 220 16 29/11/1986 46 220KV Soja-Mehsana - 1 HMT S/C 220 35 25/11/1978 47 220KV Soja-Mehsana - 2 HMT S/C 220 35 24/11/1974 48 220KV Soja-Mitha HMT D/C 220 45.2 29/09/1996 49 220KV Soja-Santhal HMT D/C 220 37 29/09/1996 50 220KV Soja-Vijapur - 1 HMT D/C 220 27.5 21/01/1987 51 220KV Soja-Vijapur - 2 HMT D/C 220 27.5 01/11/1991 52 220KV Soja-Jamla-1 HMT D/C 220 3.5 30/03/1995 53 220KV Soja-Jamla-2 HMT D/C 220 3.5 23/02/1998 54 220Kv Kheralu - Palanpur CKT -1 Mehsana D/C 220 KV 43.00 24.03.1996 55 220Kv Kheralu - Palanpur CKT - 2 Mehsana D/C 220 KV 43.00 24.03.1996 56 220Kv Kheralau - Bhutiya CKT -1 Mehsana D/C 220 KV 49.30 20.01.2012 57 220Kv Kheralau - Bhutiya CKT -2 Mehsana D/C 220 KV 49.30 20.01.2012 58 220 kv Sankhari-Shivlakha line Mehsana S/C 220 KV 187.00 30/3/1979 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2 Mehsana D/C 220 KV 32.29 08/09/2012 61 220kv Vadavi-Mitha 1 Mehsana D/C 220 KV 44.14 30.3.07 62 22okv Vadavi-Mitha 2 Mehsana D/C 220 KV 44.14 30.3.07 63 220kv Vadavi-Chhatral Mehsana D/C & S/C 220 KV 12.60 01.02.07 64 220kv Vadavi-Viramgam Mehsana D/C & S/C 220 KV 42.70 22.1.07 65 220 Kv G'nagar-Chhatral 1 Mehsana D/C 220 KV 27.30 25.03.78 66 220 Kv G'nagar-Chhatral 1 Mehsana D/C 220 KV 27.30 25.03.78 67 220 KV G'nagar(TPS)-Mehsana-1 Mehsana D/C 220 KV 52.00 30.3.79 68 220 KV G'nagar(TPS)-Mehsana-2 Mehsana D/C 220 KV 52.00 30.3.94 69 220 KV Mehsana-Radhanpur Line Mehsana D/C 220 KV 95.00 31.3.79 70 220KV Mehsana-Sankhari Mehsana D/C 220 KV 48.20 30.3.79 71 220KV Mitha-Sankhari-1 Mehsana D/C 220 KV 33.06 20.8.02 72 220KV Mitha-Sankhari-2 Mehsana D/C 220 KV 33.06 14.09.02 73 220KV Mitha-Santhal Mehsana D/C 220 KV 8.80 08/06/2001 74 220 kv Palanpur- Kansari Ckt-1 Palanpur D/C 220 KV 40.00 16.08.1991 75 220

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    101 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us