Q-Bridge Transverse Analysis

Q-Bridge Transverse Analysis

Q-Bridge Transverse Analysis Daniel Mariscal, P.E. AECOM - Tampa, Florida Project Location United States of America Project Location State of Connecticut Project Location City of New Haven Project Location Interchange: • Interstate I-95 • Interstate I-91 • CT Route 34 • Pearl Harbor Memorial Bridge, Over the Quinnipiac River (Q-Bridge) Existing Bridge: Steel Girder • Bridge Owner: Connecticut Department of Transportation Existing Bridge: Steel Girder • Plate Steel Girder, Opened in January 1958 • Main Span 118m, Once the Longest Plate Girder in Western Hemisphere • Functionally Obsolete, Carried Three Lanes in Each Direction Replacement Bridge: Extradosed Bridge • Several Alternatives Studied • Concrete Extradosed Bridge Selected (First Extradosed Built in the USA) • New Bridge Carries Five Lanes in Each Direction. Economical Bridge Types Sources: Podolny, Stroh Steel Box 200 600 Q-Bridge = 515 ft. Segmental 200 600 Extradosed 400 800 Truss 500 1,200 Arch 500 1,200 Cable Stayed 600 1,800 2,800 1,500 Suspension 0 1,000 2,000 3,000 4,000 Span in Feet Girder Bridge POSTENSIONING TENDONS Girder Depth: 1:16 to 1:18 Cable-Stayed Bridge Girder Depth: STAY CABLES 5 to 6 ft. Tower Height: V 0.25 Span H Extradosed Bridge STAY CABLES Girder Depth: 1:30 to 1:35 Tower Height: 1:10 to 1:15 What is an Extradosed Bridge? • Hybrid Bridge Type: – Cable-Stayed Bridge – Post-Tensioned Girder Bridge • Tower Height is Shorter than Cable Stayed Bridges • Girder Depth is Shallower than Girder Bridges, but Deeper than Cable- Stayed Bridges • Stay Cable Planes are Flatter than Cable-Stayed Bridges, and cover a Shorter Portion of the Span • Alternate Load Paths – Relatively Stiff Girder – Stay Cables – Primarily for Dead Loads • Stay Cables are Sized to Contribute to the Deck Prestressing • Low Fatigue Range for Stay Cables • Uniform Stress Range for Stay Cables Why an Extradosed Bridge? • Falls Within Span Length Range – Longer Main Span Avoids Old Bridge Foundation • Under Clearance: Coast Guard – Shallower Girder – Lower Profile • Over Clearance: FAA – Shorter Towers – Airport Flight Path : Tweed New Haven Airport • Superior Aesthetics Project Description FAA Clearance (2 Miles from Tweed Airport) Coast Guard Clearance Project Description • Northbound Bridge, Dedicated June, 2012 • Northbound Bridge Carried Both Northbound and Southbound Traffic • Southbound Bridge, Dedicated September, 2015 • Total Project Cost $2.0 Billion (approx.) • Main Span Cost $600 Million (approx.) Project Staging Quinnipiac River •• StageStage 3:2: DemolishBuild1: Existing NB Structure,Existing Bridge: Structure, NorthboundMove NB Build& SB(NB) SBTraffic & Structure Southbound (SB) Traffic Main Span Erection Sequence Cast-in-Place, Balance Cantilever Erection •• StageStage 7634251 -- FinishingClosureBalancedContinuationAssemblyConstruction atat Works Cantilever ofMainSide Travelingof- Cantilever SpanSubstructuresSpan Construction Forms Construction and and Pier Cable Tables Installation Project Design - Longitudinal • Design Started in 2001 • Bentley’s RM Bridge (formerly TDV’s RM 2000) • Single Spine Model: Beam Elements Project Design - Longitudinal • Stage Construction • Dead Loads • Post-Tensioning • Creep & Shrinkage • Thermal Loads • Live Loads Project Design - Longitudinal Longitudinal Model, Erection Sequence Project Design - Longitudinal Longitudinal Model, Erection Sequence Project Design - Longitudinal Longitudinal Model, Erection Sequence Project Design - Longitudinal Longitudinal Model, Erection Sequence Project Design - Longitudinal Longitudinal Model, Erection Sequence Project Design - Longitudinal Longitudinal Model, Erection Sequence Project Design - Longitudinal Longitudinal Model, Erection Sequence Project Design - Longitudinal Longitudinal Model, Erection Sequence Project Design - Longitudinal Longitudinal Model, Erection Sequence Project Design - Longitudinal Longitudinal Model, Erection Sequence Project Design - Longitudinal Longitudinal Model, Erection Sequence Project Design - Longitudinal Longitudinal Model, Erection Sequence Project Design - Longitudinal Longitudinal Model, Erection Sequence Project Design - Longitudinal Longitudinal Model, Stresses Summary Project Design - Longitudinal Longitudinal Model, Stresses Summary Project Design - Longitudinal Longitudinal Model, Stresses Summary Project Design - Longitudinal Longitudinal Model, Stresses Summary Project Design - Transverse • Intergraph’s GT STRUDL • 3-Dimensional Plate Element Model: – Dead Loads – Live Loads – Web Shear Distribution – Dishing Deformation at Cable Stay Locations • 2-Dimensional Frame Beam Element Model: – Interior Transverse Top Slab Post-Tensioning – Exterior Transverse Draped Post-Tensioning • Excel Spreadsheets Project Design - Transverse 3-Dimensional Plate Element Model Stay Cables As Springs Project Design - Transverse 2-Dimensional Frame Beam Element Model External PT Loading Project Design – Transverse Review • New Software Available: Midas FEA • Increased Computing Power • As-Built Model • 3-Dimensional Model Using Solid Elements: 8-Node Hexahedron & 6-Node Wedge for the Superstructure • Linear Elastic Model • Creep & Shrinkage Not Implicitly Modeled • Construction Sequence • Superstructure & Substructure • Stay Cables, Longitudinal & Transverse Post-Tensioning Model Development – Cross Sections • Multi-Cell Concrete Box • Variable Deck Width Along Length of Bridge • Variable Girder Depth At Towers • Variable Bottom Slab Thickness At Towers • Variable Botom Slab Thickenes Model Development – Cross Sections Variable Deck Width Along the Length of Bridge BEGIN OF BRIDGE END OF BRIDGE Model Development – Cross Sections Variable Girder Depth At Towers Model Development – Cross Sections Variable Bottom Slab Thickness At Towers Model Development – Cross Sections Full Bridge Model: 57,094 Solid Elements, 2,688 Plate Elements, 14,639 Line Elements Model Development – Cross Sections Close-Up At Bridge End Model Development – Cross Sections • Cross Sections Drawn in Microstation • 40 Different Cross Sections Representing Entire Bridge Length Cross Section Variable Geometry • Cross Sections Exported to DXF • DXF Cross Sections Imported into Midas FEA Model Development – Cross Sections Cross Sections Drawn in Microstation Model Development – Cross Sections Cross Sections Imported to Midas FEA Model Development – Cross Sections Cross Sections Imported to Midas FEA Model Development – Cross Sections Cross Sections with “Mesh Control” Model Development – Cross Sections Two Cross Sections Create Solid by “Lofting” Model Development – Cross Sections Auto-Mesh Solid Model Development – Cross Sections Solid Elements Created Model Development – Cross Sections Close-Up At Tower Variable Girder Depth and Bottom Slab Thickness Model Development - PT • Variable Cross Section Variable PT Geometry • 140 Different Top Transverse PT Geometries • 39 Different Transverse External PT Geometries • PT Geometry Developed In Excel, Points • PT Geometry Imported Into AutoCAD, Polylines • PT Geometry Exported To DXF • DXF Geometry Imported Into Midas FEA Model Development - PT Variable PT Geometry Created Using Excel Model Development - PT Geometry Imported Into AutoCAD Using Scripts Model Development - PT Geometry Exported From AutoCAD to DXF Model Development - PT DXF PT Geometry Lines Imported Into FEA Model Development - PT Transverse Top Slab PT: “Bar In Solid” T1 Tendons: 4 x 15.2mm Strands T2 Tendons: 2 x 15.2 mm Strands Model Development - PT Transverse External PT Geometry Lines Model Development - PT Transverse External PT: “Line Element” T3 Tendons: 19 x 15.2mm Strands T4 Tendons: 7 x 15.2 mm Strands Model Development - PT Top Cantilever PT Geometry Lines Model Development - PT Longitudinal Cantilever PT: “Bar In Solid” C1 Tendons: 27 x 15.2mm Strands C2 Tendons: 23 x 15.2 mm Strands C3 Tendons: 19 x 15.2mm Strands Model Development - PT Bottom Continuity PT Geometry Lines Model Development - PT Longitudinal Bottom Slab PT: “Bar In Solid” B1 & B3 Tendons: 9 x 15.2mm Strands B2 Tendons: 12 x 15.2 mm Strands Model Development - PT All Geometry Line, Including for Stay Cables Model Development - PT Typical Stay Cable Segment With Diaphragm Solid Elements Plate Elements Model Development - PT Typical Stay Cable Segment With Diaphragm Transverse Post-Tensioning Top Slab PT External PT Model Development - PT Longitudinal Cantilever Post-Tensioning Model Development - Loads Traveler Loads: Pressure Loads Model Development - Staging Construction Sequence: Total 142 Steps, 2.1 Hours Model Development - Staging Construction Sequence Model Development - Staging Construction Sequence Model Development - Staging Construction Sequence Model Development - Staging Construction Sequence Model Development - Staging Construction Sequence Model Development - Staging Construction Sequence Model Development - Staging Construction Sequence Model Development – Live Loads Live Loads: Arbitrary Load/Vehicle Truck Load Model Development – Live Loads Live Loads: 25 Positions Across Deck Model Development – Live Loads Transverse Live Loads: 7 Locations Along Main Span Model Verification • Model Verification Against RM Bridge Single Spine Model • Uniform 10kN/m2 Pressure Load Applied on Entire Deck Area Model Verification: Reactions 10kN/m2 Uniform Pressure Over Deck Location RM Result FEA Result RM/FEA Anchor Pier 1 3805 3941 0.97 Tower 2 12022 9935 1.21 21111 25300 0.83 11863 9797 1.21 Tower 3 11484 9475 1.21 19790 23800 0.83 11582 9585 1.21 Anchor Pier 4 4050 9816 1.06 TOTAL 95707 95649 1.00 Model Verification:

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    145 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us