Seattle's Comprehensive Plan Transportation Appendix

Seattle's Comprehensive Plan Transportation Appendix

Seattle’s Comprehensive Plan | Toward a Sustainable Seattle T-A1 A Transportation Appendix Table of Contents transportation appendix A Land Use Assumptions Used in Estimating Travel T-A3 B Facilities and Services Needs T-A4 C Local Level of Service Standards for Arterials and Transit Routes T-A17 D Estimated Traffic Improvements to State-Owned Transportation Facilities T-A24 E Intergovernmental Coordination Efforts T-A30 Many of the terms used in the Transportation Ele- The purpose of providing the information in this ment and Appendix may be unfamiliar to the casual Appendix, and related information in the Transpor- reader. There are useful glossaries in the State of tation Element, is to comply with the requirements Washington Department of Commerce’s Transpor- of RCW Chapter 36.70A (Growth Management Act) tation Guidebook (http://www.commerce.wa.gov/ by showing land use assumptions used in estimat- Documents/GMS-Transportation-2012.pdf) and the ing travel; estimated traffic impacts to state-owned state Department of Transportation’s website titled transportation facilities based on those assumptions; Growth Management Act (GMA) Comprehensive Plan facilities and service needs, including level of service Resources (http://www.wsdot.wa.gov/planning/com- standards for local arterials and state highways; munity/GMA.htm) and also on WSDOT’s website, forecasts of traffic; and the availability of financing (http://www.wsdot.wa.gov/Publications/Manuals/ and a financing plan to show how these identified index.htm). Additional glossaries can be found at needs will be met. http://www.fhwa.dot.gov/planning/glossary/index. cfm and http://trblist.org/subjectglossaries January | 2005 (2015) A T-A2 Seattle’s Comprehensive Plan | Toward a Sustainable Seattle Transportation Appendix Transportation Figures A-1 Arterial Classification T-A5 A-2 Transit High-Occupancy Vehicle Lanes T-A6 A-3 Bus Routes T-A7 A-4 Rail and Ferry Routes T-A8 A-5 Park & Ride Facilities T-A9 transportation appendix A-6 Bicycle Facilities T-A13 A-7 Pedestrian Facilities T-A14 A-8 Port Facilities T-A15 A-9 Airports T-A16 A-10 Transportation Level-of-Service (LOS) Screenlines T-A18 A-11 Level of Service: Screenline Volume-to-Capacity Ratios T-A20 A-12 State Highway Project List T-A24 A-13 State Highway Traffic Volumes – 2013 - 2035 T-A25 A-14 Arterials Reaching Adjacent Jurisdictions: PM Peak Hour Capacities, Volumes and V/C Ratios T-A29 January | 2005 (2015) Seattle’s Comprehensive Plan | Toward a Sustainable Seattle T-A3 A Transportation Appendix A Land Use Assumptions Used in Estimating Travel1 To estimate future travel levels, assumptions were cemeteries, reservoirs, and other uses occupy six made for a variety of factors related to future percent; and the remainder of land is vacant. population, employment, and transportation facili- regional land use assumptions ties. These include the number and geographic transportation appendix distribution of both households and employment in The Puget Sound Regional Council (PSRC) conducts Seattle and the region, characteristics of households regional planning for the four-county (Snohomish, and jobs (e.g., number of residents per household, King, Pierce, and Kitsap) central Puget Sound region. household income), and the transportation network The PSRC’s Vision 2040 Growth Strategy and Trans- (e.g., streets, transit routes). Then, a computer portation Plan presents a vision and array of strate- model was used to predict the total number of gies designed to achieve goals of growth manage- person-trips between various zones, the number of ment, transportation demand management, and trips that would use various modes (e.g., car, bus, improved transportation investment decisions. The bike, walk), and the resulting vehicle traffic volumes PSRC provides population and employment forecasts on various streets throughout the city. for the region, and encourages growth in ways that focus future population and employment growth existing conditions into urban centers, which formally include the Urban Centers that are defined in this Comprehensive Plan. In 2010, the census counted 608,660 people living in Seattle; 2014 City estimates place the current number at about 640,500 people. But many other Seattle land use assumptions people visit Seattle for a range of purposes, such as working, shopping, education, tourism, medical ap- Seattle’s growth assumptions for the period from pointments, pass-through travel, and other reasons. 2015 through 2035 are 70,000 new housing units and net growth in employment of 115,000 jobs. This Seattle covers about 53,113 acres of land. Most is the City’s share of the region’s projected housing areas of the city are of predominantly one type of and employment growth between 2015 and 2035, land use (e.g., residential, commercial, or industrial). identified through the countywide process conducted About 40 percent of the city’s land area is occupied by the Growth Management Planning Council. by residential uses. In 2010, there were approxi- A mately 308,500 housing units in the city. Estimates The growth assumptions for the Urban Centers are in 2012 placed the total number of housing units in as follows: the city at about 312,850 units. The area north of January | 2005 (2015) Urban Center Housing Units Jobs the ship canal has more of its land area occupied by Downtown 10,000 30,000 housing than mid-Seattle (south of the ship canal to First Hill/Capitol Hill 7,000 4,000 I-90) or south Seattle (south of I-90). South Lake Union 4,700 20,000 Street rights-of-way take up the next largest amount Uptown 3,500 3,500 of land, almost 27 percent. Commercial and in- University District 2,700 8,000 dustrial areas, where most of the jobs in the city Northgate 1,600 5,000 are located, occupy about 13 percent of the land Greater Duwamish NA 3,000 area. Parks occupy slightly more than nine percent; Manuf./Industrial Center BINMIC NA 1,500 1. (RCW 36.70A.070 (6) (a) (i)) A T-A4 Seattle’s Comprehensive Plan | Toward a Sustainable Seattle B Facilities and Services Needs2 with SeaTac Airport and has construction underway to extend service northward to Lynnwood. That con- struction will deliver light rail service to Capitol Hill Seattle’s street network consists of approximately and Husky Stadium by 2016, and to the University 1,534 miles of arterials, including some that are District, Roosevelt and Northgate by 2021. Routing is designated state routes, and more than 2,400 miles shown on Transportation Figure A-4. of non-arterials (see Transportation Figure A-1). In the arterial system there are 620 miles of principal There are 11 Link light rail stations currently in arterials, 566 miles of minor arterials, and 348 miles Seattle: in the Rainier Beach, Othello, Columbia City, of collector arterials. High-occupancy vehicle (HOV) North Rainier/Mt. Baker, Beacon Hill, SODO/Lander lanes exist on some arterials and limited access Street, and SODO/Royal Brougham Way neighbor- facilities as shown in Transportation Figure A-2. hoods; and four in the Downtown transit tunnel. Weekday average ridership averages more than transit 37,000 passengers (2014). Public transit in Seattle is provided by three agen- Sound Transit also provides Sounder commuter rail cies. King County Metro provides bus, trolley and services during peak hours along existing rail lines streetcar services that cover most of King County. from Downtown Seattle northward to Everett and Community Transit and Sound Transit operate ex- southward to Tacoma and Lakewood. press bus services to Seattle from King, Snohomish and Pierce Counties. As of 2014, King County Metro Metro, Sound Transit and WSDOT operate approxi- transportation appendix serves a population of more than 2 million people mately 18 park and ride facilities with approximately in a service area greater than 2,000 square miles. It 2,262 parking spaces in Seattle. (See Transportation operates more than 1,800 vehicles on about 214 bus, Figure A-5.) trolley and dial-a-ride routes. Included are 159 electric trolley buses serving 14 routes along almost 70 miles of two-direction overhead wires. Its 2012 ridership was more than 114 million passengers. Transporta- tion Figure A-3 shows bus routes in Seattle. King County Metro operates a 1.3-mile long tunnel under Third Avenue and Pine Street from the Inter- national District to 9th Avenue and Pine Street. The tunnel has four operational stations, and connects to A I-90 at the south end and to the I-5 express lanes at the north end. The tunnel supports joint bus and light rail service until such time as light rail train ser- vice is too frequent to safely operate joint services in the tunnel. Sound Transit is the regional transit authority for the Puget Sound area (which includes portions of King, Snohomish and Pierce Counties.) Sound Transit op- January | 2005 (2015) erates light rail service connecting Downtown Seattle 2 (RCW 36.70A.070 (6) (a) (iii)) Seattle’s Comprehensive Plan | Toward a Sustainable Seattle T-A5 A transportation appendix January | 2005 (2015) A T-A6 Seattle’s Comprehensive Plan | Toward a Sustainable Seattle transportation appendix January | 2005 (2015) Seattle’s Comprehensive Plan | Toward a Sustainable Seattle T-A7 A transportation appendix January | 2005 (2015) A T-A8 Seattle’s Comprehensive Plan | Toward a Sustainable Seattle transportation appendix January | 2005 (2015) Seattle’s Comprehensive Plan | Toward a Sustainable Seattle T-A9 A Transportation Figure A-5 Park & Ride Facilities Lot Name Address Spaces Amenities/Routes/Notes N/A Montlake Station Montlake Blvd E & SR 520 0 54 Bike Lockers Metro: 25, 43, 48 703 Green Lake Park 6601 8th Ave NE 411 * 22 Bike Lockers & Ride Metro: 48, 64, 66, 67, 76, 242, 316 transportation appendix Sound Transit: 542 *Lot is usually filled 90 percent or above by 9:00 a.m.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    31 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us