Invitation to Tender River State Universal Basic Education Board (Rsubeb)

Invitation to Tender River State Universal Basic Education Board (Rsubeb)

INVITATION TO TENDER RIVER STATE UNIVERSAL BASIC EDUCATION BOARD (RSUBEB) The Government of Rivers State of Nigeria has received the 2017 FGN/ UBE Intervention Funds from the Federal Government of Nigeria towards the cost of Universal Basic Education Intervention Projects and intends to apply part of the funds to cover eligible payments under the Contract for the Construction and Reconstruction of Early Child Care Development Education (E.C.C.D.E.), Primary & Junior Secondary Schools; Fencing & Landscaping of Schools; Fabrication and Supply of Pupils and Students Desks, Teachers/ Headmasters/Principals Furniture; Procurement and Supply of Sports, Agricultural Equipment and the Procurement and Supply of Office Furniture and Equipment for which this invitation is issued. The Rivers State Universal Basic Education Board, Port Harcourt now invites sealed Tenders from reputable Contractors/ Suppliers for the above mentioned Projects as in the Schedule below: 2017 Civil Works: PHYSICAL INFRASTRUCTURE FOR E.C.C.D.E PRIMARY AND JUNIOR SECONDARY SCHOOLS CIVIL INFRASTRUCTURE) E.C.C.D.E.) 2017 FGN/UBE INTERVENTION PROJECTS LANDSCAPING AND EXTERNAL PACKAGE 1: WORKS Lot SCHOOL DESCRIPTION/ CONTRACT ID. NO. LOCATION DURATION No LOCATION Landscaping and External Works at PORT CP.S. O rom Ineke, PH, UPE MPS 1 RSUBEB/2017/ECCOE/CW/l/l HARCOURT& 12 WEEKS Borikiri, PH and S.P.S. III ENEKA, OBIO/AKPOR OBA LGA REHABILITATION OF 10 PACKAGE 2 CLASSROOM B LOCKS WITH BOREHOLE RSUBEB/2017/ 10-Classroom Blocks at Special 1 ECCDE/RC/2/1 School, for Handicapped KAA, KHANA 12 WEEKS KHANA RECONSTRUCTION OF 9 AND 12 PACKAGE 3 CLASSROOM BLOCKS RSUBEB/2017/ 4- Classroom Blocks at Special 1 E CCDE/RC/3/1 School for Handicapped Creek PHALGA 12 WEEKS Road, PHALGA CIVIL INFRASTRUCTURE (PRIMARY) 2017 FGN/UBE INTERVENTION PROJECTS COMPLETION OF 14 PACKAGE 1: CLASSROOM BLOCKS WITH TOILET AND BOREHOLE LOT SCHOOL CONTRACT ID. NO. LOCATION DURATION NO DESCRIPTION/LOCATION 14-Classroom Blocks at C.P.S. 1 RSUBEB/2017/PRIMARY/ ABUA/ODUAL OGHORO, AB UA/O DUAL RC/l/l RSUBEB/2017/PRIMARY/ 12 WEEKS 14-Classroom Blocks at CPS 2 KHANA RC/1/2 KWAWA, KHANA COMPLETION OF 10 CLASSROOM STOREY BUILDING BLOCKS WITH PACKAGE 2 TOILETS AND BOREHOLE 10-Classroom Blocks at 1 RSUBEB/2017/PRIM/RC/2/1 OGU/ BOLO 12WEEKS S.S.ELE-OGU, OGU/BOLO RECONSTRUCTION OF 9 PACKAGE 3: CLASSROOM BLOCKS WITH TOILETS AND BOREHOLE 9-Classroom blocks at 1 RSUBEB/2017/PRIM/RC/3/1 GOVERNMENT PRIMARY GOKANA SCHOOL II, B-DERE, GOKANA 9-Classroom Blocks at CP.S. 2 RSUBEB/2017/PRIM/RC/3/2 OBIO/AKPOR 12WEEKS NKPOLU-RUM UIGBO RECONSTRUCTION OF 8 PACKAGE 4: CLASSROOM BLOCKS WITH TOILETS AND BOREHOLE 8 Classroom Blocks at 1 RSUBEB/2017/PRIM/RC/4/1 COMMUNITY PRIMARY TAI SCHOOL 1, BAN-OGO 1, TAIs RSUBEB/2017/ 8-Classroom Blocks at CP.S. 2 ETCHE PRIM/RC/4/2 EGBELU-NDASHI, ETCHE PORT 8-Classroom Blocks at 3 RSUBEB/2017/PRIM/RC/4/3 UPEM.P.S.BUNDU-AMA, PH H ARCOURT 8 -Classroom Blocks at C.P.S. II 4 RSUBEB/2017/PRIM/RC/4/4 KHANA W IIYAA KARA, KHANA 8 -Classroom Blocks at C.P.S. 5 RSUBEB/2017/PRIM/RC/4/5 BONNY HALLIDAY, BONNY 8- Classroom Blocks at STATE 12 WEEKS 6 RSUBEB/2017/PRIM/RC/4/6 OBIO/ AKPOR PRIMARY SCHOOL III ENEKA RECONSTRUCTION OF 7 PACKAGE 5 CLASSROOM BLOCKS WITH TOILETS AND BOREHOLE 7- Classroom Blocks at ST. 1 RSUBEB/2017/PRIM/RC/5/1 PAUL’S STATE SCHOOL, OKIRIKA 12 WEEKS IBULUYA-DIKIBO, OKIRIKA 2 RSUBEB/2017/PRIM/RC/5/2 7- Classroom Blocks at STATE EMOHUA SCHOOL IV EGBEDA, EMOHUA CONSTRUCTION OF 7 PACKAGE 6: CLASSROOM BLOCK WITH TOILETS AND BOREHOLE RSUBEB/ 7- Classroom Blocks at MODEL 1 2017/PRIM/NC/6/1 PRIMARY SCHOOL II, OKIRIKA 12 WEEKS AZUABIE, OKIRIKA RECONSTRUCTION OF 6 PACKAGE 7: CLASSROOM BLOCKS WITH TOILETS AND BOREHOLE 6- Classroom Blocks at S.S. II RSUBEB/2017/ MGBUOSIM IN 1 IBAA, 1 PRIM/RC/7/1 EMOHUA EMOHUA RSUBEB/2017/ 6- Class room Blocks at S.P.S. 2 EMOHUA PRIM/RC/7/2 RUMUJI, EMOHUA RSUBEB/2017/ 6 – Classroom Blocks at S.S. II 3 PRIM/RC/7/3 OMUDIOGA, EMOHUA EMOHUA RSUBEB/2017/ 6- Classroom Blocks at 4 DEGEMA PRIM/RC/7/4 C.P.S.USOKUN, DEGEMA RSUBEB/2017/ 6- Classroom Blocks at C.P.S. 5 KHANA PRIM/RC/7/5 IZOR SOGHO, KHANA RSUBEB/20 17/ 6-Classroom Blocks at P.S.I 6 PRIM/RC/7/6 TAI SIME TAI RSUBEB/2017/ 6- Classroom Blocks at S.S. II 7 OMUMA PRIM/RC/7/7 OBIBI UMUOGBA, OMUMA 6- Classroom Blocks at S.S. II 8 RSUBEB/2017/PRIM/RC/7/8 ETCHE ULAKWO, ETCHE RSUBEB/2017/ 6- Classroom Blocks at C.P.S. 9 ETCHE PRIM/RC/7/9 AKUKABI, ETCHE 12 WEEKS RSUBEB/2017/ 6-Classroom Blocks at C.P.S. 10 PRIM/RC/7/10 OMUOKOM ETCHE ETCHE 6- Classroom Blocks at C.P.S. II 11 RSUBEB/2017/ GOKANA DEEYOR, GOKANA PRIM/RC/7/11 RSUBEB/2017/ OPOBO/ 6-Classroom Blocks a t C.P.S. 12 PRIM/RC/7/12 NKORO, OPOBO/NKORO NKORO RSUBEB/2017/ 6- Classroom Blocks at U.P.E. 13 DEGEMA PRIM/RC/7/13 FOUCHEE, DEGEMA 6- Classroom Blocks at C.P.S. RSUBEB/2017/ LIGHT 14 PRIM/RC/7/14 BONNY HOUSE, BONNY RSUBEB/2017/ 6- Classroom Blocks at. C.P.S. 15 PRIM/RC/7/15 ASARA MA-IJA TOWN, ANDONI ANDONI RSUBEB/2017/ 6- Classroom Blocks at C.P.S. 16 OGU/BOLO PRIM/RC/7/16 CHUKWU-AMA, OGU/BOLO RECONSTRUCTION OF 4 PACKAGE 8: CLASSROOM BLOCKS WITH TOILETS AND BOREHOLE RSUBEB/2017/ 4- Classroom Blocks at ST. PORT 1 PAUL’S STATE SCHOOL II 12 WEEKS PRIM/RC/8/1 HARCOURT DIOBU, PH RSUBEB/2017/ 4- Classroom Blocks at C.P.S. 2 OYIGBO PRIM/RC/8/2 IZUOMA ASA, OYIGBO CONSTRUCTION OF BLOCK WORK FENCING WITH PACKAGE 9: SECURITY GATE HOUSE, EXTERNAL INTERLOCKING TILES AND LANDSCAPING Construction of Block work RSUBEB/2017/ Fencing with Security Gate 1 PRIM/FC/9/1 House, External Interlocking AKUKU-TORU 12Weeks Tiles and Landscaping at S.S. OBONOMA, AKUKU-TORU Construction of Block work RSUBEB/2017/ Fencing with Security Gate 2 PRIM/FC/9/2 House, External lnterlocking OGU/BOLO 12 WEEKS Tiles and Landscaping at C.P.S. IKPO-AMA, OGU/BOLO Physical Infrastructure: Fabrication and Supply of ECCDE Schools Furniture (Except otherwise Described all wrought iron furniture worked shall be of Mahogany/Cedar/Pine Wood DESCRIPTION OF DELIVERY PACKAGE 1 QTY DURATION ITEMS LOCATIONS & LGA 1. Pre-Primary Table 1. C.P.S OKOCHIRI, 192 2. Pre-Primary Chair IKRIKA LGA 500 3. Teacher’s Tables 48 2. MPS BAKANA, 4. Teacher’s wooden Arm DEGEMA LGA 48 Chair 5. Executive L-Shaped 5 Desk LOT 1 3. SPS III ENELA, 6. Executive Metal Padded OBIO/AKPOR LGA 5 RSUBEB/2017/ECCDE/FS/1/1 Arm Chair 12 WEEKS Writing of “UBEC/RSUBEB/2017/FS/FILE NO” Insignia on all items Goods: Procurement and Supply of ECCDE & Primary Schools play facilities DESCRIPTION OF DELIVERY PACKAGE 1 QTY DURATION ITEMS LOCATIONS & LGA 1. 3 seater SWING 34 2. 6-seater MERRY GO 34 ROUND Four-in-one SLIDE 34 4 3 seater JIG-SAW 34 SELECTED 34 LOT 1 SCHOOLS WOODEN CASTLE RSUBEB/2017/ECCDE/PF/1/1 34 Complete 8 WEEKS Writing of “UBEC/RSUBEB/2017/FS/FILE NO” Insignia on all items PHYSICAL INFRASTRUCTURE: FABRICATION AND SUPPLY OF PRIMARY SCHOOLS FURNITURE (EXCEPT OTHERWISE DESCRIBED ALL WROUGHT IRON FURNITURE WORKS SHALL BE OF MAHOGANY/CEDAR/PINE WOOD DESCRIPTION OF DELIVERY PACKAGE 2 QTY DURATION ITEMS LOCATIONS & LGA 1. 2 Seater Pupils Desk 690 12 WEEKS 1. C.P.S OGHORO, 2. Teacher’s Tables 50 ABUA/O DUAL LGA 3. Teacher’s Wooden Arm 2. C.P.S ASARAMA 50 Chair UA.ANDONI LGA 4. Visitor’s Wooden Armless 50 Table 3. STATE SCHOOL ELE-OGU, OGU/BOLO 5. Executive L-Shaped Desk 6 6. Executive Metal Padded 4. UPE FOUCHEE, 6 Arm Chair DEGE MALGA 7. Visitor’s High Wooden 5. STATE SCH, OMU 6 Chair DIOGA, EMOHUA LGA 8. 4-Drawer Metal Filling 6 Cabinet 9. 4-Layers Book Shelves 6 (1.8m x 1.8m) 10. Table Top Refrigerator 6 6. S.P.S III ENEKA, OBIO/AKPOR LGA 11. Magnetic Marker Board 50 (8ft x 4ft) LOT 1 RSUBEB/2017/PRIM/FS/2/1 Writing of “UBEC/RSUBEB/2017/FS/FILE NO” Insignia on all items DESCRIPTION OF DELIVERY PACKAGE 2 QTY DURATION ITEMS LOCATIONS & LGA 1. 2 Seater Pupils Desk 690 1. C.P.S KWAWA, 2. Teacher’s Tables KHANA LGA 46 3. Teacher’s Wooden 46 Arm Chair 2. ST. PAUL’s 4. Visitor’s Wooden IBULUYA/DIKIBO, 46 Armless Table OKRIKA LGA 5. Executive L-Shaped 7 Desk 3. C.P.S. CHUKWU- 6. Executive Metal AMA, OGU/BOLO 7 Padded Arm Chair 7. Visitor’s High Wooden 4. C.P.S USOKUN, LOT 2 7 Chair DEGEMA LGA 8. 4-Drawer Metal Filling RSUBEB/2017/ECCDE/PF/2/2 7 12 WEEKS Cabinet 5. S.P.S RUMUJI, 9. 4-Layers Book Shelves EMOHUA LGA 7 (1.8m x 1.8m) 10. Table Top 6. ST. PAUL’S S.S II 7 Refrigerator IDIOBU, PHA LGA 11. Magnetic Marker 7. C.P.S IZUOMA ASA, 46 Board (8ft x 4ft) OYIGBO LGA Writing of “UBEC/RSUBEB/2017/FS/FILE NO” Insignia on all items DESCRIPTION OF DELIVERY PACKAGE 2 QTY DURATION ITEMS LOCATIONS & LGA LOT 3 1.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    20 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us