OKLAHOMA DEPARTMENT of TRANSPORTATION 2017 to 2024

OKLAHOMA DEPARTMENT of TRANSPORTATION 2017 to 2024

US-60: BEGIN APPROX. 2.5 MILES EAST OF US-75, IN BARTLESVILLE, & EXTEND EAST TO NOWATA C/L FFY 2017 GRADE,DRAINING,BRIDGE & SURFACE $ 14,628,001 US-75 FR: 0.19 MILES SOUTH OF THE KANSAS S/L NORTH TO THE KANSAS S/L US 169 BEGIN APROX. 2.76 MILES NORTH OF JCT. US 60/US 169 EXT. NORTH 5 MI. FFY 2017 MONEY ONLY $ 1,000,000 FFY 2020 PAVEMENT REHABILITATION $ 4,905,000 SH-99: OVER CANEY RIVER, APRROX. 7.5 MILES NORTH OF SH-99/SH-10 JCT. OKLAHOMA DEPARTMENT OF TRANSPORTATION SH 10 REHAB BRIDGE OVER VERDIGRIS RIVER, 10.6 MI W CRAIG CO FFY 2017 BRIDGE & APPROACHES $ 5,875,589 FFY 2022 BRIDGE REHABILITATION $ 2,488,800 SH-99: OVER POND CREEK, 5.1 MILES NORTH OF SH-10 JCT. SH-28: OVER THE VERDIGRIS RIVER, 1.0 MILE EAST OF US-169 FFY 2017 BRIDGE & APPROACHES $ 5,263,506 FFY 2020 BRIDGE & APPROACHES $ 5,368,403 SH-10 OVER BIG CABIN CREEK, 3.6 MILES WEST OF JCT. US-59 2017 to 2024 Construction Work Plan FFY 2018 BRIDGE & APPROACHES $ 2,708,650 SH 99 OVER BIRCH CREEK, 2.7 MI NORTH OF JCT SH 10 US-60: VERDIGRIS RIVER, 3.8 MI. EAST OF JCT. US169TIED TO 30375(04) FFY 2017 BRIDGE & APPROACHES $ 1,190,804 FFY 2018 BRIDGE & APPROACHES $ 4,251,001 SH-2 OVER LITTLE CABIN CREEK, 16.5 MILES NORTH OF THE JCT. US-60 SH-123 OVER UNNAMED CREEK, 2.9 MIS NORTHEAST OF THE JCT US-60 & SH-123 US-60 OVER KENTUCKY CREEK. TIED TO 27012(05) FFY 2020 BRIDGE & APPROACHES $ 3,138,377 FFY 2018 RIGHT OF WAY $ 112,270 FFY 2019 BRIDGE & APPROACHES $ 704,457 Division 8 - Sheet 1 of 2 FFY 2018 BRIDGE & APPROACHES $ 3,651,501 FFY 2018 UTILITIES $ 112,270 $ 3,362,917 US 60 REHAB BRIDGE OVER US 75 SH-10 OVER BIG CREEK & THE EAST FORK OF BIG CREEK16 MILES WEST OF US-59 FFY 2022 BRIDGE REHABILITATION $ 1,746,400 FFY 2017 BRIDGE & APPROACHES $ 4,399,212 SH-69A: FROM APPROX. 1.65 MILES NORTH OF SH-10, NORTH 1.3 MILES SH-123: OVER CANEY RIVER, 1.68 MILES NORTH OF SH-123/US-60 JCT. SH 28 OVER SALT CREEK, 1.3 MI SOUTH OF THE JCT OF US 60 FFY 2021 GRADE, DRAIN & SURFACE $ 4,000,000 FFY 2017 RIGHT OF WAY $ 142,360 FFY 2018 BRIDGE & APPROACHES $ 1,853,515 FFY 2018 RIGHT OF WAY $ 294,037 FFY 2018 UTILITIES $ 181,589 FFY 2017 UTILITIES $ 19,200 SH 28 REHAB BRIDGE OVER LIGHTNING CREEK, 3.5 MI S JCT US 60 $ 4,475,626 FFY 2019 BRIDGE & APPROACHES $ 3,645,680 $ 3,807,240 FFY 2022 BRIDGE REHABILITATION $ 1,828,800 SH 125 OVER NEOSHO RIVER, 9.4 MILES NORTH OF US 60 US-60: FROM SH-123 E 2.1 MILES US 60 BEGIN 3.03 MILES EAST OF NOWATA C/L EXTEND EAST 9.16 MI TO JCT SH 66 FFY 2018 BRIDGE REHABILITATION $ 2,425,650 FFY 2024 GRADE, DRAIN & SURFACE $ 18,320,000 FFY 2017 UTILITIES $ 53,000 FFY 2023 PAVEMENT REHABILITATION $ 9,450,000 $ 2,478,650 FFY 2019 RIGHT OF WAY $ 2,011,491 US-60: BEGIN JCT. US-60/SH-35 & EXTEND EAST 4.96 MILES FFY 2019 UTILITIES $ 910,192 $ 21,241,683 FFY 2020 GRADE, DRAIN & SURFACE $ 15,572,185 INTERSECTION AT US-69A & SH-10 IN MIAMI, TURNING MOVEMENTS FFY 2024 INTERSECT MODIF $ 500,000 US 75 REHAB BRIDGE OVER CANEY RIVER LOCATED 6.5 MI S OF JCT US 60 SH 66 BEGIN 4.34 MI SW OF CRAIG CL AND EXTEND NE 4.34 MI : I-44: (WILL ROGERS TURNPIKE) UNDER SH-125, 6.8 MILES NORTH OF US-60 FFY 2022 BRIDGE REHABILITATION $ 2,668,000 FFY 2023 WIDEN & RESURFACE $ 10,850,000 FFY 2021 BRIDGE & APPROACHES $ 9,500,000 US 75 ADD J-TURNS, BEGIN 11.5 MILES NORTH OF TULSA C/L, EXTEND FFY 2017 RIGHT OF WAY $ 109,000 NORTH1.5 MILES FFY 2017 UTILITIES $ 109,001 September 21, 2016 - Final $ 9,718,001 FFY 2020 INTERSECT MODIF $ 500,000 SH 11 REHAB BRIDGE OVER BIRD CREEK, 0.1 MI S JCT US 60 SH-10: OVER SPRING RIVER AND O'FLOW, 3.5 MILES WEST OF SH-10C FFY 2022 BRIDGE REHABILITATION $ 1,916,800 FFY 2017 BRIDGE & APPROACHES $ 7,056,046 SH-11: FROM 2.0 MILES S.E. OF BARNSDALL EXTEND S.E. 3.75 MILES SH-10: FROM JCT. SH-10/SH-137, EAST 5.0 MILES TO JCT. SH-10C FFY 2021 WIDEN & RESURFACE $ 5,488,800 FFY 2023 WIDEN & RESURFACE $ 9,600,000 FFY 2018 RIGHT OF WAY $ 137,660 FFY 2021 RIGHT OF WAY $ 154,476 FFY 2018 UTILITIES $ 184,782 FFY 2021 UTILITIES $ 482,359 $ 5,811,242 $ 10,236,835 SH-11: OVER RED EAGLE BRANCH CREEK, 9.2 MILES EAST OF JCT. SH-99(PHASE II) SH-10C: FROM JCT.SH010/SH10C EAST TO MISSOURI STATE LINE FFY 2019 GRADE, DRAIN & BRIDGE $ 842,699 FFY 2020 GRADE,DRAINING,BRIDGE & SURFACE $ 8,222,633 SH-11: FR BARNSDALL, EXTEND SOUTHEAST APPROX. 2.0 MILES FFY 2018 RIGHT OF WAY $ 518,775 FFY 2018 UTILITIES $ 299,215 FFY 2020 GRADE, DRAIN & BRIDGE $ 7,341,382 $ 9,040,623 FFY 2018 RIGHT OF WAY $ 1,917,100 FFY 2018 UTILITIES $ 1,126,464 $ 10,384,946 US-60 OVER (2) UNNAMED CREEKS, 7.0 MILES & 13.4 MILES EAST OF US-69 FFY 2020 BRIDGE & APPROACHES $ 2,690,038 US 60 OVER SALT CREEK, 1.2 MI WEST OF THE JCT OF SH 18 FFY 2017 RIGHT OF WAY $ 109,000 FFY 2017 UTILITIES $ 109,000 FFY 2018 BRIDGE & APPROACHES $ 2,332,420 $ 2,908,038 59 OTTAWA 69 SH-99: OVER BIRCH CREEK & AN ABANDONED RR APPROX 11.6 MILE NORTH OF SH-20 £¤ £¤ FFY 2017 BRIDGE & APPROACHES $ 8,149,875 AA US 60 OVER SPRING AND NEOSHO RIVER, 11.1 MI EAST OF US 69 18 FFY 2024 BRIDGE & APPROACHES $ 29,000,000 SH-11 FROM 9.0 MI S.E. OF BARNSDALL EXTEND S.E. 4.96 MILE TO À¿ 44 FFY 2018 RIGHT OF WAY $ 112,270 THE WASHINGTON C/L A 75 A 10 £¤ ¨¦§ FFY 2018 UTILITIES $ 112,270 $ 29,224,540 FFY 2021 WIDEN & RESURFACE $ 6,805,700 À¿ MIAMI A 10 SH18: FROM 5.68 MILES NORTH OF PAWNEE C/L, NORTH APRROX. 3.2 MILES OSAGE A AAAA À¿ A 59 AAAAA AAAAA AA US 60 OVER UNNAMED CREEK, 12.8 MI EAST OF US 69 FFY 2022 RIGHT OF WAY $ 2,056,604 NOWATA A AA £¤ AA FFY 2018 BRIDGE & APPROACHES $ 297,300 FFY 2022 UTILITIES $ 1,028,302 $ 3,084,906 A WASHINGTON AA A SH-125: FROM FAIRLAND NORTH APPROX. 1.5 MILES FFY 2019 WIDEN & RESURFACE $ 3,270,000 SH 18 BRIDGE AND APPROACHES OVER SALT CREEK LOCATED 5.3 MI N PAWNEE CL AA FFY 2017 RIGHT OF WAY $ 329,400 FFY 2020 BRIDGE & APPROACHES $ 4,175,163 99 25 AAAAA FFY 2017 UTILITIES $ 203,400 FFY 2018 RIGHT OF WAY $ 106,090 CRAIG À¿ $ 3,802,800 À¿ FFY 2018 UTILITIES $ 106,090 $ 4,387,343 AA US-60 FROM (I-44) WILL ROGERS TOLL GATE TO SH-125 10 FFY 2024 PAVEMENT REHABILITATION $ 12,000,000 SH-18: OVER SALT CREEK, 2.0 MILES NORTH OF THE PAWNEE C/L AA AA À¿ FFY 2017 BRIDGE & APPROACHES $ 4,418,889 À¿ AA 125 US-60: OVER HORSE CREEK, 2.6 MILES NORTH OF THE DELAWARE C/L AA 2 FFY 2018 BRIDGE & APPROACHES $ 3,232,033 SH-20 OVER GRAY HORSE CR APPROX. 1.6 MILE EAST OF SH-18 A À¿ À¿ A 60 FFY 2018 BRIDGE & APPROACHES $ 3,690,740 £¤ BARTLESVILLE £¤ AA US 59 FROM JCT OF SH 125 NORTHWEST TO JCT I-44 AA A FFY 2023 WIDEN & RESURFACE $ 16,500,000 SH-20: SYCAMORE CREEK , 7.9 MILE EAST OF SH-18 NOWATA AA A FFY 2020 RIGHT OF WAY $ 2,725,000 FFY 2018 BRIDGE & APPROACHES $ 2,121,800 PAWHUSKA AA VINITA AA A 60 A 69 FFY 2020 UTILITIES $ 1,635,000 A £ AAA £ $ 20,860,000 SH-20: BUG CREEK, 11.5 MI EAST OF JCT. SH18 ¤ AA A ¤ FFY 2018 BRIDGE & APPROACHES $ 6,612,853 A AA 59 123 AA AA £¤ US 59 FROM SAILBOAT BRIDGE TO JCT OF SH 125, 1.02 MI IN OTTAWA CO. SH-99 OVER PENN CREEK, 0.3 MILES NORTH OF THE JCT. SH-20 À¿ 25 FFY 2022 GRADE, DRAIN & SURFACE $ 9,500,000 À¿ FFY 2019 RIGHT OF WAY $ 3,110,441 FFY 2021 BRIDGE & APPROACHES $ 5,200,000 FFY 2019 UTILITIES $ 1,833,110 FFY 2018 RIGHT OF WAY $ 112,270 AA $ 14,443,551 FFY 2018 UTILITIES $ 112,270 A $ 5,424,540 A A 82 A À¿ A AA AA AA A SH-125: FROM .9 MILES SOUTH OF SH-85A, NORTH APPROX .75 MILES AA FFY 2021 WIDEN & RESURFACE $ 7,094,796 SH-18 OVER COAL CREEK, 7.5 MILES NORTH OF US-64 AAA FFY 2021 BRIDGE & APPROACHES $ 2,000,000 A 11 INTERSECTION AT SH-10 AND FORD RD. IN GROVE FFY 2017 RIGHT OF WAY $ 109,000 £¤ AA À¿ ROGERS FFY 2024 INTERSECT MODIF $ 1,000,000 FFY 2017 UTILITIES $ 109,000 169 $ 2,218,000 75 £ A FFY 2022 RIGHT OF WAY $ 50,000 ¤ A A FFY 2022 UTILITIES $ 50,000 A £¤ 28 $ 1,100,000 SH-20 FROM SH-99 IN HOMINY, EAST 5.0 MI À¿ FFY 2020 WIDEN & RESURFACE $ 5,984,100 SH 85A OVER HORSE CREEK, 3.5 MI EAST OF SH 85 FFY 2017 UTILITIES $ 201,750 A $ 6,185,850 A 20 FFY 2018 BRIDGE & APPROACHES $ 7,167,296 A A JAY FFY 2017 UTILITIES $ 129,000 A A À¿ $ 7,296,296 SH-99: ARKANSAS RIVER, FROM JUST NORTH OF CLEVELAND, NORTH TO OSAGE C/L A 66 A À¿ MAYES A FFY 2021 BRIDGE & APPROACHES $ 9,792,518 15 88 A INTERSECTION AT US-60 & SH-82 FFY 2017 UTILITIES $ 1,286,500 À¿ $ 11,079,018 PAWNEE À¿ FFY 2024 INTERSECT MODIF $ 500,000 20 A FFY 2022 RIGHT OF WAY $ 50,000 PAWNEE 44 À¿ A59 FFY 2022 UTILITIES $ 50,000 SH-18 OVER BLACK BEAR CREEK, 0.4 MILES NORTH OF US-64 ¨¦§ £¤ $ 600,000 FFY 2021 BRIDGE & APPROACHES $ 2,527,470 A À¿99 FFY 2017 RIGHT OF WAY $ 109,000 A A See Sheet 2 for TULSA 20 DELAWARE SH-2: BEGINNING AT US-60 & EXTENDING NORTH TO HOSPITAL ROAD IN VINITA.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us