Program of Measures of River Basin Management Plan of Cyprus (Period 2016-2021)

Program of Measures of River Basin Management Plan of Cyprus (Period 2016-2021)

Τμήμα Αναπτύξεως Υδάτων Program of Measures of River Basin Management Plan of Cyprus (Period 2016-2021) October 2016 «CONSULTING SERVICES FOR THE ELABORATION OF THE 2ND RIVER MANAGEMENT PLAN OF CYPRUS, FOR THE IMPLEMENTATION OF DIRECTIVE 2000/60/EC, AND FOR THE ELABORATION OF THE FLOOD RISK MANAGEMENT, PLAN FOR THE IMPLEMENTATION OF THE DIRECTIVE 2007/60/EC» WDD 10/2014 The project may be co-financed by the Cohesion Fund Consortium LDK Consultants Engineers & Planners S.A.. ECOS Consulting S.A. Date: 25.11.2016 Version: Final Description: Submission after the approval decision of Ministerial Council on 07.10.2016 WDD 10/2014 Program of Measures of River Basin Management Plan of Cyprus TABLE OF CONTENTS SUMMARY ............................................................................... 14 1. PREFACE ................................................................ 1-17 2. BASIC PRINCIPLES FOR SETTING OUT THE PROGRAM OF MEASURES .................................... 2-21 2.1 THE FRAMEWORK OF DIRECTIVE 2000/60/EC ........................................... 2-21 2.1.1 Main Principles ................................................................................................... 2-21 2.1.2 Basic measures .................................................................................................. 2-23 2.1.3 Supplementary measures .................................................................................. 2-25 2.1.4 Key type measures............................................................................................. 2-26 nd 2.1.5 Specific requirements for the 2 RBMP ............................................................. 2-28 ST 3. IMPLEMENTATION PROGRESS OF THE 1 RBMP’s PROGRAMME OF MEASURES ............................... 3-33 3.1 BRIEF PRESENTATION OF THE PROGRAMME OF MEASURES ............... 3-33 3.2 PROGRESS OF PROGRAMME OF MEASURES IMPLEMENTATION ......... 3-35 3.3 EXPERIENCE GAINED AND RESULTS FROM THE IMPLEMENTATION OF THE PROGRAMME OF MEASURES OF THE 1ST RBMP ................................................................................................. 3-40 4. WATER BODIES STATUS - ENVIRONMENTAL OBJECTIVES ........................................................... 4-42 4.1 STATUS OF WATER BODIES ........................................................................ 4-42 4.1.1 Classification of surface water bodies ................................................................ 4-42 4.1.1.1 Ecological status of surface WBs ..................................................... 4-42 4.1.1.2 Chemical status of surface WBs ....................................................... 4-46 Consortium: LDK Consultants Engineers & Planners S.A. and Page 4 ECOS Consulting S.A. WDD 10/2014 Program of Measures of River Basin Management Plan of Cyprus 4.1.2 Classification of groundwater bodies .................................................................. 4-49 4.2 ENVIRONMENTAL OBJECTIVES ................................................................... 4-51 4.2.1 Objectives for Surface Waters ............................................................................ 4-52 4.2.2 Objectives for Groundwater Systems ................................................................. 4-55 4.2.3 Objectives for protected areas ........................................................................... 4-56 5. MAPPING SIGNIFICANT PRESSURES TO WATER BODIES AND TO KEY TYPE MEASURES .............. 5-58 5.1 SIGNIFICANT PRESSURES ON WATERS OF CYPRUS .............................. 5-58 5.1.1 Surface water bodies.......................................................................................... 5-60 5.1.2 Groundwater Bodies........................................................................................... 5-60 5.2 BASIC PRINCIPLES FOR MARRING PRESSURES TO KEY TYPE MEASURES ..................................................................................................... 5-61 5.3 MAPPING PRESSURES TO MAIN CATEGORIES OF MEASURES ............. 5-62 6. IMPLEMENTED ACTIVITIES /ACTIONS TO ADDRESS SIGNIFICANT PRESSURES / SPECIAL ISSUES .... 6-67 6.1 HYDROMORPHOLOGICAL ALTERATIONS .................................................. 6-67 6.2 URBAN WASTEWATER .................................................................................. 6-68 6.3 WASTE DISPOSAL SITES .............................................................................. 6-68 6.4 AGRICULTURAL AND FARMING ACTIVITIES .............................................. 6-69 6.5 ABSTACTIONS/DIVERSIONS FROM SURFACE WATERS .......................... 6-70 6.5.1 Roadmap for the management of surface waters quantity ................................. 6-72 6.6 ABSTRACTIONS FROM GROUNDWATERS ................................................. 6-74 6.6.1 Road map for the gradual reduction of abstractions from groundwater for irrigation ........................................................................................................................... 6-75 6.7 EXTRACTIVE ACTIVITIES .............................................................................. 6-77 6.8 ACTIONS FOR THE PROTECTION OF PROTECTED AREAS ..................... 6-79 Consortium: LDK Consultants Engineers & Planners S.A. and Page 5 ECOS Consulting S.A. WDD 10/2014 Program of Measures of River Basin Management Plan of Cyprus 7. PROGRAMME OF MEASURES ............................... 7-83 7.1 MEASURES OF THE 1ST RBMP INCLUDED IN OPERATIONAL ACTIVITIES OF COMPETENT BODIES ......................................................... 7-84 7.2 BASIC MEASURES ARTICLE 11.3.a (DIRECTIVES) ..................................... 7-89 7.2.1 Urban Waste Water Treatment Directive (91/271 / EEC) ................................... 7-92 7.2.2 Nitrates Directive (91/676 / EEC) ....................................................................... 7-99 7.2.3 Integrated Pollution Prevention Control Directive (96/61 / EC) ......................... 7-103 7.2.4 Other Basic measures of Article 11.3.a of WFD ............................................... 7-105 7.2.4.1 Bathing Water Directive (76/160 / EEC and Directive 2006/7/EC). 7- 105 7.2.4.2 Birds Directive (79/409/ EEC as amended by 2009/147 / EC) and Habitats Directive (92/43 / EEC)........................................................................ 7-105 7.2.4.3 Drinking Water Directive ( (80/778 / EEC), as amended by Directive 98/83 / EC 7-107 7.2.4.4 Major Accidents (Seveso) Directive ( (96/82 / EC) ...................... 7-107 7.2.4.5 Environmental Impact Assessment Directive (85/337 / EEC) .... 7-107 7.2.4.6 Sewage Sludge Directive (86/278 / EEC) ..................................... 7-107 7.2.4.7 Plant Protection Products Directive (91/414 / EEC) .................... 7-107 7.2.4.8 Marine Strategy (2008/56 / EC) ...................................................... 7-107 7.3 BASIC MEASURES (Article 11.3.b-l WFD) ................................................... 7-107 7.3.1 Measures to implement the cost recovery principle for the purposes of Article 9 of the WFD (Aticle 11.3.b) .................................................................................... 7-108 7.3.2 Measures to promote efficient and sustainable water use (Article 11.3.c)........ 7-108 7.3.3 Measures to meet the requirements of Article 7 of the WFD – Drinking water (Article 11.3.d) .................................................................................................. 7-115 7.3.4 Measures to control abstraction from surface and groundwater. (Article.3.e) .. 7-115 7.3.5 Measures to control artificial recharge of aquifers (Article 11.3.f). .................... 7-121 7.3.6 Measures to control point source discharges (Article 11.3.g) ........................... 7-121 7.3.7 Measures to prevent or control inputs of diffuse pollutants. (Article 11.3.h) ..... 7-130 Consortium: LDK Consultants Engineers & Planners S.A. and Page 6 ECOS Consulting S.A. WDD 10/2014 Program of Measures of River Basin Management Plan of Cyprus 7.3.8 Measures to address any other significant impacts on water bodies status. (Article 11.3.i) ............................................................................................................... 7-149 7.4 SUPPLEMENTARY MEASURES ................................................................. 7-158 7.4.1 Recreation and restoration of wetlands areas .................................................. 7-158 7.4.2 Efficiency and reuse measures ........................................................................ 7-194 7.4.3 Construction projects........................................................................................ 7-199 7.4.4 Desalination Plants........................................................................................... 7-201 7.4.5 Artificial recharge of aquifers ............................................................................ 7-203 7.4.6 Educational measures ...................................................................................... 7-206 7.4.7 Research, development and demonstration projects ....................................... 7-207 7.5 MAPPING MEASURES TO KEY TYPE MEASURES ................................... 7-210 7.6 ESTIMATED COST OF PROGRAM OF MEASURES ................................. 7-215 8. SYNERGY OF PROGRAM MEASURES WITH OTHER MANAGEMENT PLANS ......................................... 8-219 8.1 CONNECTION AND SYNERGY WITH THE FLOOD RISK MANAGEMENT PLAN ................................................................................... 8-219 8.1.1

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    314 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us