Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km) Expansion 2016 Northeastern 69 North of Hwy 522 northerly, French River Two to four-lane widening Underway 2022 14.8 Over $80M Design Design-Bid- Complete Build Expansion 2023-2024 Northeastern 69 North of Hwy 559, northerly, Nobel Two to four-lane widening Planned 11 Over $80M Design In Design-Bid- Procurement Build Expansion 2023-2024 Northeastern 69 North of the north junction of Hwy 529, Two to four-lane widening Planned 20.4 Over $80M Design Design-Build northerly, Britt Underway Expansion Upcoming Northeastern 69 Patrol yard on Hwy 529 interchange, New facility Planned 0 $8 – $20M Design Design-Build expansion Pointe Au Baril Upcoming Expansion Upcoming Northeastern 69 Hwy 69 connection to Sudbury southeast Two to four-lane widening Planned 6.2 Over $80M Design Design-Bid- expansion bypass Upcoming Build Expansion Upcoming Northeastern 69 South junction of Hwy 529 northerly, Two to four-lane widening, New bridge, Planned 15 Over $80M Design Design-Bid- expansion Pointe au Baril New culvert Upcoming Build Expansion Upcoming Northeastern 652 Cochrane Bypass, extension of Hwy 652, New two-lane highway Planned 4.5 $15 – $50M Planning/EA In Design-Bid- expansion Genier Rd. to Hwy 11 for 4.5 km, Procurement Build Cochrane Expansion Upcoming Northeastern 69 North Hwy 7182 (Shebeshegong Rd.), Two to four-lane widening Planned 11 Over $80M Design Design-Bid- expansion northerly, Pointe au Baril Upcoming Build Expansion 2020 Northwestern 11, 17 3 km west of CPR overhead at Ouimet to Two to four-lane widening, New bridge, Underway 2023 8.7 $40 – $100M Design Design-Bid- Dorion East Loop Rd. including CPR Illumination Complete Build overheads at Ouimet, Shuniah, Dorion Expansion 2021 Northwestern 11, 17 Hwy 587 easterly to Pearl Lake including Two to four-lane widening, New bridge, Planned 14 Over $80M Design Design-Bid- Pearl River Bridges, Shuniah Illumination Underway Build Expansion 2021 Northwestern 17 Ontario and Manitoba border easterly to Two to four-lane widening, Illumination Planned 2023-2024 5.8 $40 – $100M Design Design-Bid- west of Hwy 673, west of Kenora Complete Build Expansion 2021 Northwestern 11/17 Truck inspection station, 8 km east of Hwy Commercial vehicle inspection facility, Planned 2023-2024 0 $15 – $50M Design Design-Bid- 527, Shuniah Truck lay-by Complete Build Expansion 2022 Northwestern 11, 17 Coughlin Rd. westerly to Hwy 582 east Two to four-lane widening, New Planned 2023-2024 6.5 $15 – $50M Design Design-Bid- junction including Valley Creek Culverts, culvert, Culvert replacement, Underway Build west of Red Rock Illumination Expansion 2023-2024 Northwestern 11, 17 Red Rock Rd. No. 9 westerly to Coughlin Two to four-lane widening, New bridge, Planned 5 $40 – $100M Design Design-Bid- Rd. including Black Sturgeon River Bridge removal, Illumination Underway Build Bridges, Red Rock Expansion 2023-2024 Northwestern 17 West of Hwy 673 easterly including Moth Two to four-lane widening, New Planned 9 $40 – $100M Planning/EA To be Lake Culverts, west of Kenora culvert, Illumination Underway determined Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km) Rehab 2018 Northeastern 11 Groundhog River Bridge, Fauquier Bridge replacement, Culvert Underway 2021 0 $15 – $50M Design Design-Build replacement Complete Rehab 2019 Northeastern 94 Hwy 654 westerly, south CNR overhead, Bridge removal, Culvert rehabilitation, Underway 2021 3.5 $0 – $10M Design Design-Bid- Hwy 94/CNR underpass, Burford Creek, Resurfacing, Traffic signals Complete Build Callander Rehab 2019 Northeastern 17B Duchesnay Creek Bridge, CNR overhead, Bridge removal, Bridge replacement, Underway 2021 1 $15 – $50M Design Design-Bid- North Bay Resurfacing Complete Build Rehab 2019 Northeastern 569 Blanche River Bridge at Hilliardton Bridge replacement Underway 2021 0 $8 – $20M Design Design-Bid- Complete Build Rehab 2019 Northeastern 11 North junction Hwy 17/11B northerly, Culvert replacement, Resurfacing, Underway 2021 17.1 $15 – $50M Design Design-Bid- North Bay Drainage improvements Complete Build Rehab 2019 Northeastern 548 St Joseph Island Skyway, St Joseph Bridge rehabilitation, Resurfacing Underway 2021 2.1 $15 – $50M Design Design-Bid- Island Complete Build Rehab 2020 Northeastern 17 West of Hwy 519 easterly, south of White Resurfacing, Paved shoulders Underway 2021 26.7 $15 – $50M Design Design-Bid- River Complete Build Rehab 2020 Northeastern 11 Fraser River Bridge, Skunk River Bridge Bridge rehabilitation, Culvert Underway 2021 0 $8 – $20M Design Design-Bid- and various culverts, west of Hwy 631, rehabilitation, Culvert replacement Complete Build west of Hearst Rehab 2020 Northeastern 11 North of Hwy 570 to east junction Hwy Culvert rehabilitation, Resurfacing, Underway 2021 24.2 $15 – $50M Design Design-Bid- 101, Ramore Paved shoulders Complete Build Rehab 2020 Northeastern 129 South of Hwy 667 northerly to south Culvert replacement, Culvert Underway 2021 48.6 $8 – $20M Design Design-Bid- junction of Hwy 101, south of Chapleau rehabilitation Complete Build Rehab 2020 Northeastern 663 Hwy 11 northerly to Calstock Resurfacing, Intersection Underway 2021 5.3 $0 – $10M Design Single Source improvements Complete Rehab 2020 Northeastern 69 Naiscoot Lake, north of Pointe au Baril Bridge replacement Underway 2021 0 $0 – $10M Design Design-Bid- Station Complete Build Rehab 2020 Northeastern 17 Hwy 553 easterly, Massey easterly Culvert replacement, Resurfacing Underway 2022 22.4 $15 – $50M Design Design-Bid- Complete Build Rehab 2020 Northeastern 522, 524 Commanda Creek, ESS Narrows Bridges, Bridge rehabilitation, Bridge Underway 2021 0 $0 – $10M Design Design-Bid- east of Hwy 69, west of Loring replacement Complete Build Rehab 2020 Northeastern 579 Gilles Creek Bridge, north of Cochrane Bridge replacement Underway 2021 0 $0 – $10M Design Design-Bid- Complete Build Rehab 2020 Northeastern 17 Sand River, Barrett River Bridges, south Bridge rehabilitation, Culvert Underway 2021 0 $0 – $10M Design Design-Bid- of Wawa, Alona Bay Culvert, south of rehabilitation Complete Build Montreal River Rehab 2020 Northeastern 532, 556 Achigan Creek, Beaver Creek, Silver Bridge replacement, Culvert Underway 2021 0 $8 – $20M Design Design-Bid- Creek, Atkinson Creek and Dam Creek, rehabilitation, Culvert replacement Complete Build Searchmont Program Start Year Region Highway Location Type Of Work Highway Target Project Estimated Engineering Delivery Type Program Completion Length Cost Range Status Method Status (km) Rehab 2021 Northeastern 124 Hwy 400 easterly, Parry Sound to Culvert rehabilitation, Resurfacing, Underway 2021 20 $8 – $20M Design Design-Bid- McKellar Paved shoulders Complete Build Rehab 2021 Northeastern 101, 129 Sideburned, Nemegosenda, Nebskawashi Bridge rehabilitation, Bridge Underway 2022 0 $8 – $20M Design Design-Bid- Bridges, Chapleau replacement Complete Build Rehab 2021 Northeastern 127 Hwy 60 southerly, Whitney southerly Resurfacing Underway 2023 21.7 $8 – $20M Design Design-Build Complete Rehab 2021 Northeastern 535, 64 North of Hwy 64 northerly, north of Culvert rehabilitation, Resurfacing Underway 2021 6.1 $0 – $10M Design Design-Bid- Noelville Complete Build Rehab 2021 Northeastern 65 East junction Hwy 560 Elk Lake to east of Resurfacing Underway 2022 13.1 $15 – $50M Design Design-Bid- Hwy 562 Complete Build Rehab 2021 Northeastern 17, 638 Hwy 17 Bruce Mines easterly, Hwy 638 Bridge rehabilitation, Culvert Underway 2022 16.8 $15 – $50M Design Design-Bid- Thessalon River Bridge, north of Hwy 670, replacement, Resurfacing Complete Build Ophir Rehab 2021 Northeastern 11, 655 Hwy 11 west of Cochrane easterly and Resurfacing Underway 2021 17.1 $0 – $10M Design Design-Bid- Hwy 655 south of Hwy 11 southerly, south Complete Build of Driftwood Rehab 2021 Northeastern 66 Kirkland Lake easterly to west of Hwy 624 Bridge rehabilitation, Resurfacing, Underway 2022 23.1 $15 – $50M Design Design-Bid- Paved shoulders Complete Build Rehab 2021 Northeastern 518 Hwy 400 easterly to west of Orrville Bridge rehabilitation, Culvert Underway 2021 13.7 $0 – $10M Design Design-Bid- replacement, Resurfacing Complete Build Rehab 2021 Northeastern 11, 654 Bear Creek Bridge, Lakeshore Dr. Bridge rehabilitation Underway 2021 0 $0 – $10M Design Design-Bid- underpass, south of North Bay Complete Build Rehab 2021 Northeastern 101 West of Hwy 144 easterly, east of Foleyet Bridge replacement, Culvert Underway 2022 10.9 $15 – $50M Design Design-Bid- replacement, Resurfacing Complete Build Rehab 2021 Northeastern 566, 65 Montreal River Bridges, west and east of Bridge rehabilitation, Bridge Underway 2021 0 $0 – $10M Design Design-Bid- Matachewan replacement Complete Build Rehab 2021 Northeastern 668 Deception Creek and Smith Creek Bridge replacement Underway 2022 0 $0 – $10M Design Design-Bid- Bridges, south of Hunta Complete Build Rehab 2021 Northeastern 17 Echo Bay easterly to Bar River Rd., Echo Resurfacing Underway 2021 7.7 $8 – $20M Design Design-Bid- Bay Complete Build Rehab 2021 Northeastern 592 CNR overhead and Ragged Creek Bridge, Bridge replacement Planned 2022 0 $0 – $10M Design Design-Bid- north of Novar Underway Build Rehab 2021 Northeastern 559 Hwy 559 at Hwy 7909 (Nobel Rd.) and Illumination Planned 2021 0 $0 – $10M Design Design-Bid- Hwy 7182 (Shebeshekong Rd.),
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages17 Page
-
File Size-