Draft Final Remedial Investigation / Feasibility Study (Ri/Fs)

Draft Final Remedial Investigation / Feasibility Study (Ri/Fs)

Snperfondi RMQ SITE: DRAFT FINAL PKEAK; REMEDIAL VOLUME 1 OF 4 - TEXT REMEDIAL INVESTIGATION/FEASIBILITY STUDY NEW HAMPSHIRE PLATING COMPANY MERRIMACK, NEW HAMPSHIRE For U.S. Environmental Protection Agency By Halliburton NUS Corporation and Raytheon Engineers & Constructors, Inc. EPA Work Assignment No. 33-1LG1 EPA Contract No. 68-W8-0117 HNUS Project No. 0772 May 1996 Halliburton NTJS CORPORATION W94619DF DRAFT FINAL REMEDIAL INVESTIGATION REPORT VOLUME 1 OF 4 - TEXT REMEDIAL INVESTIGATION/FEASIBILITY STUDY NEW HAMPSHIRE PLATING COMPANY MERRIMACK, NEW HAMPSHIRE For U.S. Environmental Protection Agency By Halliburton NUS Corporation and Raytheon Engineers & Constructors, Inc. EPA Work Assignment No. 33-1LG1 EPA Contract No. 68-W8-0117 HNUS Project No. 0772 May 1996 Marilyn M. Wade, P.E. George D(7Gardner, P.E. Project Manager Program Manager DRAFT FINAL TABLE OF CONTENTS VOLUME 1 - TEXT DRAFT FINAL REMEDIAL INVESTIGATION REPORT NEW HAMPSHIRE PLATING COMPANY SITE MERRIMACK, NEW HAMPSHIRE SECTION PAGE E.O EXECUTIVE SUMMARY ES-1 1.0 INTRODUCTION 1-1 1.1 Site and Study Area Background 1-2 1.2 NHPC Site History 1-3 1.3 Report Organization 1-4 2.0 STUDY AREA INVESTIGATION 2-1 2.1 Previous Investigations 2-1 2.1.1 Peck Environmental Laboratory ,Inc 2-1 2.1.2 Wehran Engineerin g 2-2 2.1.3 New Hampshire Department of Environmental Services (NHDES) 2-3 2.1.4 Removal Actio n- U.S. EPA Emergency Response Team (ERT) 2-4 2.1.5 Wetlan dInvestigation 2-5 2.1.6 Technical Assistance Groundwater Samplin g 2-6 2.1.7 Non-Time-Critical Removal Action 2-7 2.1.8 Previous Investigation son Properties Abutting the NHPC Site 2-9 2.1.8.1 Magnum Leasing and Mortgage Company . 2-9 2.1.8.2 New England Pole and Wood Treating Company 2-9 2.1.8.3 Techwood Building Systems, Inc 2-9 2.1.8.4 Jones Chemical, Inc 2-10 2.2 Study Areas Summary of Existing Information 2-11 2.2.1 NHPC Operations Area 2-11 2.2.1.1 NHPC Building Area 2-12 2.2.1.2 Former Lagoon Areas 2-13 2.2.1.3 Wetlands and Overflow Area 2-16 2.2.1.4 Other On-site Areas 2-17 2.2.2 Adjacent Propertie s 2-18 2.2.2.1 Magnum Leasing and Mortgage Company Property 2-19 2.2.2.2 YMCA Property 2-19 2.2.2.3 Horseshoe Pond Island 2-20 2.2.2.4 New England Pole and Wood Treating Corporation (NEPWTC) 2-20 W94619DF i DRAFT FINAL TABLE OF CONTENTS (Continued) VOLUME 1 - TEXT DRAFT FINAL REMEDIAL INVESTIGATION REPORT NEW HAMPSHIRE PLATING COMPANY SITE MERRIMACK, NEW HAMPSHIRE SECTION PAGE 2.2.2.5 Lot Number 22 Property 2-21 2.2.2.6 Techwood Building Systems Property 2-21 2.2.2.7 Jones Chemical, Inc. Property 2-22 2.2.3 Other Location sof Investigation 2-23 2.2.3.1 Horseshoe Pond 2-24 2.2.3.2 Merrimack River 2-24 2.3 Conceptual Site Model 2-24 2.3.1 Source Areas 2-24 2.3.2 Migration Pathways 2-25 2.4 Objectives of the Rl 2-26 2.5 Summary of Remedial Investigation Activities 2-27 2.5.1 Phas Ie Activities 2-27 2.5.1.1 Surface Soil Sampling Program 2-28 2.5.1.2 Phase I Lagoon Sampling Program 2-29 2.5.2 Phas eII Activities 2-31 2.5.2.1 Building Area Soil Boring Program 2-31 2.5.2.2 Lagoon Soil Boring Program 2-33 2.5.2.3 Monitoring Well Installation Program 2-40 2.5.2.4 Piezometer Installation 2-50 2.5.2.5 Soil Vapor Survey 2-50 2.5.2.6 Elevation and Location Surveys 2-51 2.5.2.7 Water Level Monitoring 2-53 2.5.2.8 Groundwater Sampling Program 2-54 2.5.2.9 Surface Water and Sediment Sampling Program 2-55 2.5.3 Summar yof Remedial Investigation Sampling and Analysis 2-57 2.5.3.1 Data Quality and Data Quality Objectives 2-57 2.6 Studies Performed By Others 2-58 2.6.1 Geophysical Studies Performe bdy United States Geologic Survey (USGS) 2-58 2.6.2 Ecological Studies 2-59 2.6.2.1 EPA Corvallis Laboratory 2-59 2.6.2.2 U.S. Fish and Wildlife Service 2-60 2.6.3 University of Cincinnati Stabilization/Solidification Studies 2-60 2.6.4 Former Building Soil Sampling 2-61 W94619DF DRAFT FINAL TABLE OF CONTENTS (Continued) VOLUME 1 - TEXT DRAFT FINAL REMEDIAL INVESTIGATION REPORT NEW HAMPSHIRE PLATING COMPANY SITE MERRIMACK, NEW HAMPSHIRE SECTION PAGE 3.0 PHYSICAL CHARACTERISTICS OF THE STUDY AREA 3-1 3.1 Surface and Topographic Features 3-1 3.1.1 NHPC Operations Area 3-1 3.1.2 Study Area 3-2 3.2 Demography and Land Use 3-3 3.2.1 Demography 3-3 3.2.2 Land Use 3-4 3.2.3 Groundwater Use 3-5 3.2.4 Surface Water Use 3-5 3.3 Climate 3-6 3.4 Surface Water Hydrology 3-7 3.5 Geology 3-8 3.5.1 Regional Geology 3-9 3.5.2 Study Area Geology 3-10 3.5.2.1 Unconsolidated Soil Deposits 3-10 3.5.2.2 Former Lagoon Areas 3-15 3.5.2.3 Bedrock 3-17 3.6 Hydrogeology 3-19 3.6.1 Shallow Overburden Aquifer 3-21 3.6.1.1 Hydraulic Conductivity 3-21 3.6.1.2 Groundwater Elevation Measurements 3-23 3.6.1.3 Horizontal Hydraulic Gradients 3-24 3.6.1.4 Horizontal Groundwater Flow 3-24 3.6.1.5 Groundwater Flow Rates 3-26 3.6.2 Deep Overburden 3-27 3.6.2.1 Hydraulic Conductivity 3-27 3.6.2.2 Piezometric Surface Elevation Measurements 3-28 3.6.2.3 Horizontal Hydraulic Gradients 3-28 3.6.2.4 Horizontal Groundwater Flow 3-29 3.6.2.5 Groundwater Flow Rates 3-29 3.6.3 Bedrock Aquifer 3-29 3.6.3.1 Hydraulic Conductivity 3-30 3.6.3.2 Piezometric Surface Elevation Measurements 3-30 3.6.3.3 Horizontal Hydraulic Gradients 3-32 3.6.3.4 Horizontal Groundwater Flow 3-33 3.6.4 Former Lagoon Areas 3-33 3.6.4.1 Lagoon Area Hydrology 3-34 3.6.4.2 Observed Groundwater Fluctuations and Depths 3-35 W94619DF iij DRAFT FINAL TABLE OF CONTENTS (Continued) VOLUME 1 - TEXT DRAFT FINAL REMEDIAL INVESTIGATION REPORT NEW HAMPSHIRE PLATING COMPANY SITE MERRIMACK, NEW HAMPSHIRE SECTION PAGE 3.6.5 Groundwater Recharge and Discharge 3-36 3.6.5.1 Upgradient Recharge Areas 3-36 3.6.5.2 Interconnection of Aquifer Systems 3-37 3.6.5.3 Groundwater/Surface Water Interaction .... 3-40 3.7 Ecology 3-42 4.0 SOURCE, NATURE AND EXTENT OF CONTAMINATION 4-1 4.1 Source Areas 4-1 4.1.1 NHPC Building Area 4-1 4.1.1.1 NHPC Building 4-2 4.1.1.2 Former Leachfields 4-3 4.1.1.3 Underground Fuel Oil Storage Tank 4-3 4.1.1.4 Above-ground Solvent Storage Tank 4-4 4.1.1.5 Former NHPC Production Well 4-4 4.1.1.6 Solidified Material Storage Cell 4-5 4.1.2 Former Lagoon Areas 4-5 4.1.3 Wetland and Overflow Areas 4-7 4.1.4 Summary of Source Areas 4-7 4.2 Nature of Chemical Compounds Detected at NHPC 4-9 4.2.1 Metals 4-9 4.2.2 Cyanide 4-10 4.2.3 Volatile Organic Compounds (VOCs) 4-10 4.2.4 Semi-Volatile Organic Compounds (SVOCs) 4-11 4.2.5 Pesticides/Polychlorinated Biphenyls (PCBs) 4-11 4.2.6 Petroleum Hydrocarbons 4-12 4.3 Background/Upgradient Sampling Locations 4-13 4.3.1 Background Soil Sampling 4-13 4.3.1.1 Metals 4-13 4.3.1.2 VOCs 4-15 4.3.1.3 SVOCs 4-15 4.3.1.4 Compounds Analyzed by Not Detected .... 4-15 4.3.2 Upgradient Groundwater Sampling 4-15 4.3.2.1 Metals 4-16 4.3.2.2 VOCs 4-16 4.3.3 Surface Water and Sediment 4-16 4.4 Extent of Contamination in Soils 4-17 4.4.1 Exten otf Soils Contamination in NHPC Building Area , 4-19 4.4.1.1 Metals . 4-20 4.4.1.2 Cyanide 4-27 W94619DF iv DRAFT FINAL TABLE OF CONTENTS (Continued) VOLUME 1 - TEXT DRAFT FINAL REMEDIAL INVESTIGATION REPORT NEW HAMPSHIRE PLATING COMPANY SITE MERRIMACK, NEW HAMPSHIRE SECTION 4.4.1.3 VOCs ........................... 4-28 4.4.1.4 SVOCs .......................... 4-30 4.4.1.5 PCBs ............................ 4-30 4.4.1.6 Total Petroleum Hydrocarbons (TPH) ...... 4-30 4.4.1.7 Compounds Analyzed But Not Detected .... 4-31 4.4.2 Data Presentatio nfor Former Lagoons, Wetlands, and Overflow Area .......................... 4-31 4.4.3 Extent of Soils Contamination in Former Lagoon Areas ................................... 4-33 4.4.3.1 Lagoon 1 Area ..................... 4-34 4.4.3.2 Lagoon 2 Area ..................... 4-41 4.4.3.3 Lagoon 3 and 4 Area ................. 4-49 4.4.3.4 Clean Fill Soil Sample Results ........... 4-57 4.4.4 Exten ot f Soils Contamination in Wetlands and Overflow Area .......................... 4-58 4.4.4.1 Southern Wetland Area ..............

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    462 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us