District Taluk Gram Panchayat Year Work Name Type of Building

District Taluk Gram Panchayat Year Work Name Type of Building

Estimated Expenditure For District Taluk Gram Panchayat Year Work Name Type Of Building Expenditure Work status Amount SC/ST Gulbarga Chitapur Alolli 2006-07 two tank and pipe line conection Pipeline 0 0 0 completed Gulbarga Chitapur Alolli 2006-07 latrine construction of near Hanadi Construction of Toilet 45000 43000 0 completed Gulbarga Chitapur Alolli 2006-07 mahiti savan & education IEC 50000 50000 0 0 village of sanknoor yallamma Bhavi to Tank pine line conection and water tank 2 allready Gulbarga Chitapur Alolli 2006-07 Pipeline 61000 59000 0 completed pipeline to constrcution Tank conection Gulbarga Chitapur Alolli 2006-07 Yallamma Temple to Govt road and mallaya Temple near pipe line Tank Pipeline 75000 71500 0 completed Gulbarga Chitapur Alolli 2006-07 Alloli village consftruction of Panchayat building repair and KGB Bank building repair Repair Works 200000 191000 0 completed Gulbarga Chitapur Alolli 2006-07 constrctuion of latrine in harijan wada Construction of Toilet 50000 41000 41000 completed Gulbarga Chitapur Alolli 2006-07 new area construction of latrine Construction of Toilet 45000 42000 41000 completed Gulbarga Chitapur Alolli 2007-08 C.R.C building matad mutya near metling and CC road CC Road 50000 45500 0 Completed Gulbarga Chitapur Alolli 2007-08 education & information IEC 46000 46000 0 0 Gulbarga Chitapur Alolli 2007-08 Sakanur village to halakatti house to Ishwara house to malli goudar galli cc Raod CC Road 100000 92500 0 Completed Gulbarga Chitapur Alolli 2007-08 Dyavamma Temple iranna saukar house CC road CC Road 100000 93500 0 Completed Gulbarga Chitapur Alolli 2007-08 kurbur area community latrene Construction of Toilet 150000 142500 0 Completed Gulbarga Chitapur Alolli 2007-08 Alloli village Harijan wada CC road & Drenage work CC Road 200000 187500 187500 Completed Gulbarga Chitapur Alolli 2008-09 P.w.d. road to Borvell CC road work CC Road 50000 43500 0 Completed Gulbarga Chitapur Alolli 2008-09 Mahiti Savan and Education IEC 45000 45000 0 0 Gulbarga Chitapur Alolli 2008-09 Sharanayya Bhagodi house to Rajeshekar house to Gram Panchayat at CC road work CC Road 100000 90500 0 Completed Gulbarga Chitapur Alolli 2008-09 Ayyanna Chalikar house to Rajeshekar house to Gram Panchayat at CC road work CC Road 100000 91500 0 Completed Gulbarga Chitapur Alolli 2008-09 P.w.d. road to Bhimraya kottagundi house CC road and Metling CC Road 100000 93500 0 Completed Gulbarga Chitapur Alolli 2008-09 Lendkin Hallad near latrine construction Construction of Toilet 150000 142500 0 Completed Gulbarga Chitapur Alolli 2008-09 Palkamma temple harijan wada Tankar CC road SC colony CC Road 100000 94500 94500 Completed Gulbarga Chitapur Alolli 2008-09 Nagappa leader house to ayyappa sander house CC road SC CC Road 190000 182500 182500 Completed Gulbarga Chitapur Alolli 2009-10 Alloli Gp Pet masidi to Chandrsha Bevin katti ( Waya High School ) CC road -75 CC Road 100000 0 0 Completed Gulbarga Chitapur Alolli 2009-10 Dandgund Villege Anganwadi Constration Anganavadi building 188000 0 0 Completed Gulbarga Chitapur Alolli 2009-10 Alloli Gp Pet masidi to Chandrsha Bevin katti ( Waya High School ) Drain Contration -75 Drainage 30000 28000 0 Completed Gulbarga Chitapur Alolli 2009-10 Information and Education Mahiti . IEC 50000 45000 0 Completed Gulbarga Chitapur Alolli 2009-10 Devappa Bhomma Nayak to Durgappa Allur House CC road Constraion -80 CC Road 100000 92000 0 Completed Gulbarga Chitapur Alolli 2009-10 Alloli Gp Mali Goudar house to Devamma temple C.C. road -180 CC Road 200000 157000 0 Completed Gulbarga Chitapur Alolli 2010-11 Information & Edcuacation IEC 50000 0 0 Not Started Gulbarga Chitapur Alolli 2010-11 Dandgund village hanuman temple huda house cc road CC Road 81000 0 0 progress Gulbarga Chitapur Alolli 2010-11 alloli village navgram Anagan wadi CC road CC Road 100000 0 0 progress Gulbarga Chitapur Alolli 2010-11 sanknoor village Iranna savu house to nalwar CC road CC Road 100000 0 0 progress Gulbarga Chitapur Alolli 2010-11 Alloli village harijan vada ladies latrine construction Construction of Toilet 170000 0 0 progress Gulbarga Chitapur Aloor B 2006-07 library melvicharakar salary Construction Of Library 20000 19000 0 completed Gulbarga Chitapur Aloor B 2006-07 three village water drinking supply work Drinking Water Supply 28000 26500 0 completed Gulbarga Chitapur Aloor B 2006-07 shivappa hadpadh house to near agasi Drainege Drainage 35000 31000 0 completed Gulbarga Chitapur Aloor B 2006-07 Hanumant kardalli house to Basappa gamak house CC Road work CC Road 35000 33000 0 completed Gulbarga Chitapur Aloor B 2006-07 mahiti savan & education IEC 50000 50000 0 0 Gulbarga Chitapur Aloor B 2006-07 Sharanappa hugar house to anganwadi construction of Drainage Drainage 60000 57000 0 completed Gulbarga Chitapur Aloor B 2006-07 consftruction of sub office building Construction of Gram Panchayat140000 Building 137000 0 completed Gulbarga Chitapur Aloor B 2006-07 consftruction of Panchayat building Construction of Gram Panchayat305000 Building 298000 0 completed Gulbarga Chitapur Aloor B 2006-07 constrctuion of CCRoad in harijan wada CC Road 35000 32000 32000 completed Gulbarga Chitapur Aloor B 2007-08 Devindrappa kappeger house to gurappa our house at parsi work Parasi 35000 28000 0 Completed Gulbarga Chitapur Aloor B 2007-08 basavarajappa varadh our house nigareddy kollirvar house CC road work CC Road 35000 29500 0 Completed Gulbarga Chitapur Aloor B 2007-08 mahadevappa gamaka house to basappa bala our house at Parasi work Parasi 35000 29500 0 Completed Gulbarga Chitapur Aloor B 2007-08 Hanumant kardalli our house basappa gamaka our houset to parasi work Parasi 35000 30500 0 Completed Gulbarga Chitapur Aloor B 2007-08 Basappa sebal our house mallayya dhape our house parasi work Parasi 35000 31500 0 Completed Gulbarga Chitapur Aloor B 2007-08 ladi mouse our house to kote at parasi work Parasi 35000 32500 0 Completed Gulbarga Chitapur Aloor B 2007-08 animal drinking water tank Water Tank 40000 36500 0 Completed Gulbarga Chitapur Aloor B 2007-08 education & information IEC 60000 60000 0 Completed Gulbarga Chitapur Aloor B 2007-08 Narasappa bajantri house to nala work Drinking Water Supply 75000 69500 0 Completed hanumant utari our house mareppa and hanumnat hallakeri and amrutappa guni our houset to Gulbarga Chitapur Aloor B 2007-08 Parasi 77000 71500 0 Completed parasi work Gulbarga Chitapur Aloor B 2007-08 bhemraya malli patil our house to sharanayya swamy dukhan our CC road work CC Road 80000 73500 0 Completed main raod to sevalal temple and main road vaiya mallappa motnalli our house to rajappa Gulbarga Chitapur Aloor B 2007-08 CC Road 80000 76500 0 Completed dodhamani our house CC road wor Gulbarga Chitapur Aloor B 2007-08 Monappa natikar house to basappa madar our house at CC road work CC Road 35000 30000 30000 Completed Gulbarga Chitapur Aloor B 2007-08 allur B village madar colony CC road work CC Road 40000 35500 35500 Completed Gulbarga Chitapur Aloor B 2008-09 Information & Education etc. IEC 33000 33000 0 0 Gulbarga Chitapur Aloor B 2008-09 Ramtirth village Tanda CC road work CC Road 50000 45500 0 Completed Gulbarga Chitapur Aloor B 2008-09 Allur K village Nagappa Buseri house to Ningareddy kolli CC road work SC CC Road 70000 64500 0 Completed Gulbarga Chitapur Aloor B 2008-09 Allur B village Bhimraya Patil house to Sharanayya swami CC road work CC Road 70000 65000 0 Completed Gulbarga Chitapur Aloor B 2008-09 Allur B village Rachayya swami house to land Hall Bavi house Dreanage construction work Drainage 70000 66500 0 Completed Gulbarga Chitapur Aloor B 2008-09 Allur B village Kashir house to Imam sab house Dreanage work Drainage 80000 85500 0 Completed Gulbarga Chitapur Aloor B 2008-09 Allur B village Hir rivar Sri Durga Devi Temple drinking water pipe line work Pipeline 90000 86500 0 Completed Gulbarga Chitapur Aloor B 2008-09 Allur B village Mahadevappa Yadgeri house to new bus stand CC road work ( SC ) CC Road 110000 105000 0 Completed Gulbarga Chitapur Aloor B 2008-09 Allur K village CC road work CC Road 40000 35000 35000 Completed Gulbarga Chitapur Aloor B 2008-09 Allur B village Narsappa Bajantri house to Step work CC road work ST CC Road 80000 73500 73500 Completed Gulbarga Chitapur Aloor B 2008-09 Allur B village new Anganawadi building construction ( SC ) Anganavadi building 200000 189500 189500 Completed Gulbarga Chitapur Aloor B 2009-10 Allur k GP to Ramthirth GP main road Near Dhankrugalige Water Tank Work Water Tank 36000 31000 0 Completed Gulbarga Chitapur Aloor B 2009-10 Bevan katti to Badbin Halla near Drain and CC Road Work CC Road 36000 32000 0 Completed Gulbarga Chitapur Aloor B 2009-10 Ramthirth GP Sub Office Building Coloring Work BS Slabs flooring 34000 32500 0 Completed Gulbarga Chitapur Aloor B 2009-10 Narayan Kashi House Near CC Road Work CC Road 36000 33200 0 Completed Gulbarga Chitapur Aloor B 2009-10 Rahiman Sab muslim house to Kasim Sab kotgi CC Road Work CC Road 36000 34500 0 Completed Gulbarga Chitapur Aloor B 2009-10 Conttraction of Black 1 Anganwadi Building Work Anganavadi building 50000 48000 0 Completed Gulbarga Chitapur Aloor B 2009-10 Information And Ecucation Mahiti IEC 51000 48000 0 Completed Gulbarga Chitapur Aloor B 2009-10 Myadi Gida Near Dhan krugallige Water Tank Totti Work SC) Water Tank 72000 67520 0 Completed Gulbarga Chitapur Aloor B 2009-10 Warter Tank Awantigera Bhavi work And Steel Girki Work Water Tank 72000 68000 0 Completed Gulbarga Chitapur Aloor B 2009-10 Bhoganni Chandrasha house to Main Road CC Road Contration -80 CC Road 94000 91000 0 Completed Gulbarga Chitapur Aloor B 2009-10 Ramu Bhavi near Dhankrugalige Water Tank Work and Dhobhi Gatta Work Water Tank 125000 112000 0 Completed Gulbarga Chitapur Aloor B 2009-10 SC Oniyalli Bhavi Work and Girki Work other works 36000 31820 31820 Completed Gulbarga Chitapur Aloor B 2009-10 SC Onniyalli Narsappa Handraki house near CC Road Work -20 CC Road 36000 33200 33200 Completed Gulbarga Chitapur Aloor B 2010-11 Information & Education etc.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us