Historical Archaeological Assessment & Research Design

Historical Archaeological Assessment & Research Design

HISTORICAL ARCHAEOLOGICAL ASSESSMENT & RESEARCH DESIGN APPENDIX H Sydney Metro City & Southwest Chatswood to Sydenham - ARD Sydney Metro City & Southwest Chatswood to Sydenham Historical Archaeological Assessment & Research Design Report to Jacobs / Arcadis / RPS FINAL_14102016 October 2016 Page i Sydney Metro City & Southwest Chatswood to Sydenham - ARD EXECUTIVE SUMMARY Project Background The proposed Sydney Metro City & Southwest Chatswood to Sydenham project (the project) is the subject of this Historical Archaeological Assessment and Research Design (ARD). The project would involve construction and operation of an underground rail line, about 15.5 kilometres long, and new stations between Chatswood and Sydenham. The Environmental Impact Statement (EIS) identified the potential for archaeological constraints and the need for the preparation of a historical ARD (mitigation measure NAH2) at all surface construction sites except Artarmon traction substation and Marrickville dive site (southern). This ARD has been prepared to comply with mitigation measure NAH2. The ten sites that are considered in this report are: x Chatswood dive site (northern) x Crows Nest Station x Victoria Cross Station x Blues Point temporary site x Barangaroo Station x Martin Place Station x Pitt Street Station x Central Station x Waterloo Station x Power Supply Routes – various locations near the metro rail line route. Archaeological Management The station and construction sites have been divided into archaeological management zones based on archaeological potential and construction impacts as submitted with the EIS. Archaeological management zone mapping provided in Section 13.3 is based on a ‘traffic light’ coding: x Red (Zone 1): Direct impact to significant archaeology. Archaeological investigation required prior to any construction impacts (bulk excavation etc.) x Amber (Zone 2): Potential impact to significant archaeology. Prepare Work Stage Specific Archaeological Method Statement (AMS) once construction methodology and impacts are known. Archaeological investigation is likely required x Green (Zone 3): Unlikely to contain significant archaeology. Construction to proceed with unexpected finds procedure as nil-low potential for significant archaeological remains. Page ii Sydney Metro City & Southwest Chatswood to Sydenham - ARD Archaeological Mitigation The following table presents a summary of the archaeological management and impact mitigation for the project. The summary is based on detailed analysis presented in this report. Site Management Site Potential archaeology Impact Mitigation code zone Potential direct impact – demolition, ground Moderate potential for locally x AMS levelling and 2 NC 3 significant remains of mid-late x Monitoring or construction of 19th century development Test/Salvage construction site facilities Potential direct impact Moderate potential for locally – demolition, ground significant remains of x AMS levelling and 2 NC 5 Bryson’s cottage and store Monitoring or construction of x (1860s) and later 19th century Test/Salvage construction site development facilities Chatswood dive site Low-Moderate potential for locally significant remains of Direct impact – the former School of Arts excavation for dive x AMS (1870s), later nineteenth 1 NC 6 structure and access Test/Salvage century residential x ramp development and early twentieth century school Potential direct impact Nil-Low potential for NC 1 – demolition, ground archaeological remains. x Unexpected NC 2 levelling and 3 Unlikely to reach significance Finds Procedure NC 4 construction of site threshold amenities Nil-Low potential for Bulk excavation x Unexpected Artarmon archaeological remains. 3 All Construction of site Finds Procedure Substation Unlikely to reach significance facilities threshold Open shaft bulk Potential for late 19th to mid excavation 3 x Unexpected 20th century remains. Unlikely Crows Nest All Demolition and Finds Procedure to reach threshold for local construction of site significance facilities x AMS Low potential for remains of Direct impact – bulk 2 Monitoring if VC 2 x c.1880s cistern and outhouse excavation required Low-Moderate potential for Victoria potentially locally significant Direct impact – bulk x AMS VC 3 Cross remains of c.1880s structures, excavation 1 x Test/Salvage cisterns and outhouses Nil-Low potential for VC 1 Demolition, levelling archaeological remains. 3 x Unexpected VC 4 and construction of site Unlikely to reach significance Finds Procedure VC 5 amenities threshold Page iii Sydney Metro City & Southwest Chatswood to Sydenham - ARD Site Management Site Potential archaeology Impact Mitigation code zone Direct impact – retrieval x AMS Moderate potential for locally shaft excavation x Test/Salvage in significant archaeology bulk excavation associated with the 19th Potential direct impact 1 / 2 area BP 1 century occupation and – landscaping development of the ferry x Monitoring or (benching or cut/fill etc.) service and boatbuilding Test/Salvage of and construction of site industry in Blues Point other ground amenities works Moderate-High potential for Blues Point archaeological evidence Potential direct impact associated with the 19th 2 x AMS BP 2 – landscaping and century development of the x Monitoring or BP 3 construction of site ferry service and boatbuilding Test/Salvage amenities industry in Blues Point (State and local) Potential direct impact Low potential for locally – demolition and 3 x Unexpected BP 4 significant remains construction of site Finds Procedure amenities Moderate potential for local B 2 and State significant Direct impact – bulk x AMS (west archaeological evidence excavation for station 1 Test/Salvage half) associated 19th century wharf construction x development and occupation Moderate-High potential for locally significant Direct impact – bulk B 3 x AMS archaeological evidence excavation for station 1 x Salvage associated with Cuthbert’s entrance Barangaroo shipyard Moderate potential for locally B 5 significant archaeological Direct impact – bulk x AMS (east evidence associated with 19th excavation for 1 Test/Salvage only) century wharf development substation x and occupation B 1 x Unexpected B 4 Nil Nil 3 Finds Procedure B 5 Low potential for State significant archaeological Direct impact – x AMS MP 3 remains associated with early demolition and bulk 1 x Monitoring if landscape and informal excavation required colonial use pre 1840 Martin Place MP 1 MP 2 x Unexpected MP 4 Nil Nil 3 Finds Procedure MP 5 MP 6 Moderate potential for State x AMS Direct impact – and locally significant x Monitoring Pitt Street PS 1 demolition, piling and archaeological remains dating 1 demolition bulk excavation from c.1820s x Salvage Page iv Sydney Metro City & Southwest Chatswood to Sydenham - ARD Site Management Site Potential archaeology Impact Mitigation code zone x AMS Low potential for locally Direct impact – PS 2 1 Monitoring / significant archaeological demolition, piling and x PS 3 Salvage if remains dating from c.1850s bulk excavation required PS 4 Moderate-High potential for x AMS PS 5 Direct impact – State and locally significant x Monitoring PS 6 demolition, piling and 1 archaeological remains dating demolition PS 7 bulk excavation from c.1820s. PS 8 x Salvage PS 9 3 x Unexpected Nil Nil PS 10 Finds Procedure Direct impact – piling x AMS Low potential for State and bulk excavation x Monitoring / CS 2 significant archaeological Potential direct impacts 1 / 2 Test / Salvage if CS 3 remains associated with – temporary platform required Devonshire Cemetery construction, demolition x Exhumation and levelling Policy applies x AMS Direct impact – bulk Moderate-High potential for x Test/Salvage excavation northern CS rail-related remains from 1 / 2 CS 4 north CS 4 4 1850s-1900s Potential direct impacts x Monitoring / Local / State – ground works, piling Salvage if required CS 4 Central Station Low potential for remains Potential direct impact 3 x Unexpected CS 5 associated with 20th rail – ground works, piling Finds Procedure Moderate-High potential for x AMS Potential direct impact locally significant remains of 2 Monitoring / CS 6 – ground works, footing x the Wesleyan chapel and Salvage if excavation, piling school constructed in 1847 required 3 x Unexpected CS 7 Nil Nil Finds Procedure Potential direct impact Nil-Low potential for 19th and x Unexpected CS 8 – ground works, footing 3 20th century rail remans Finds Procedure excavation, piling WL1–5 WL7–8 x AMS WL12-14 Evidence of c.1880s x Testing (clarify Direct impact – bulk 1 WL16-17 residential, commercial and significance) excavation (east light industrial development x Salvage if half of significant site) Waterloo x AMS Rest Potential direct impacts 2 Monitoring / Evidence of c.1880s x (west – ground works and Test / Salvage residential, commercial and half of construction of site depending on light industrial development site) facilities results from east half of site Page v Sydney Metro City & Southwest Chatswood to Sydenham - ARD Site Management Site Potential archaeology Impact Mitigation code zone Nil-Low potential for Bulk excavation x Unexpected Marrickville archaeological remains. 3 Finds Dive Site All Construction of site Unlikely to meet significance Procedure threshold facilities Low potential archaeological Potential direct impacts remains associated with – services x Unexpected former infrastructure such as 3 PSR 1 investigations and Finds drains, surfaces and kerbing. relocations, trench and Procedure Unlikely to meet significance

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    171 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us