Dublin Port Company

Dublin Port Company

DUBLIN PORT COMPANY Maintenance Dredging Programme 2022 – 2029 Application for Foreshore Licence Water Quality Risk Assessment IBE1618 D01 8 February 2021 rpsgroup.com WATER QUALITY RISK ASSESSMENT Document status Version Purpose of document Authored by Reviewed by Approved by Review date D01 Water Quality Risk Assessment 08/02/2021 Approval for issue 8 February 2021 Prepared by: Prepared for: RPS Dublin Port Company Associate - Water Environment and Flood Risk Port Engineer Management Elmwood House Port Centre 74 Boucher Road, Belfast Alexandra Road, Dublin 1 Co. Antrim BT12 6RZ Co. Dublin T +44 2890 667 914 T +353 1 8876000 E E Dublin Port Maintenance Dredging Programme 2022-2029 | Water Quality Risk Assessment | 8 February 2021 Page 1 rpsgroup.com WATER QUALITY RISK ASSESSMENT Contents 1 INTRODUCTION ......................................................................................................................................5 1.1 Dredging Operations ......................................................................................................................5 1.2 Consent Requirements ..................................................................................................................6 2 WATER QUALITY RISK ASSESSMENT ................................................................................................6 2.1 Assessment Methodology ..............................................................................................................6 2.2 Receiving Water Environment........................................................................................................8 2.2.1 Study Area Water Bodies .................................................................................................9 2.2.2 Water Framework Directive ............................................................................................10 2.2.3 Protected Areas ..............................................................................................................14 2.2.4 Marine Strategy Framework Directive Environmental Status .........................................18 2.2.5 EPA Water Quality in 2017: An indicators Report .........................................................19 2.2.6 ABR Project - Capital Dredging Water Quality Monitoring .............................................21 2.2.7 Maintenance Dredging 2020/2021 - Water Quality Monitoring ......................................51 2.2.8 Earth Observation Data ..................................................................................................67 2.2.9 Water Quality Summary ..................................................................................................72 2.3 Likelihood of Impacts ...................................................................................................................74 2.3.1 Potential Impacts ............................................................................................................74 2.4 Description of Likely Significant Impacts ......................................................................................75 2.4.1 Maintenance Dredging & Disposal Operations ...............................................................75 3 MITIGATION MEASURES .....................................................................................................................75 3.1 Suspended Sediment and Sedimentation ....................................................................................75 3.1.1 Dredging and Disposal ...................................................................................................75 4 RESIDUAL IMPACTS ............................................................................................................................76 5 POTENTIAL CUMULATIVE IMPACTS .................................................................................................77 5.1 Dublin Port Company ABR Project ..............................................................................................77 5.2 Dublin Port Company MP2 Project ..............................................................................................77 5.3 Dublin Port Company – Dublin Harbour Capital Dredging Project ..............................................79 6 CONCLUSIONS .....................................................................................................................................79 Tables Table 2-1 Criteria for Rating Receptor Sensitivity (NRA, 2008) .........................................................................7 Table 2-2 Criteria for Rating the Magnitude of Impact (NRA, 2008) ..................................................................7 Table 2-3 Criteria for Rating the Significance of Environmental Impacts (NRA 2008) .......................................8 Table 2-4 Defining Impact Significance (NRA, 2008) .........................................................................................8 Table 2-5 WFD Status (2009-2018) .................................................................................................................12 Table 2-6 WFD Status Breakdown (2013-2018) ..............................................................................................13 Table 2-7: Annual Assessment Criteria for Bathing Waters .............................................................................16 Table 2-8 2019-2020 Windstorm Events Impacting Ireland (Met Eireann) .....................................................24 Table 2-9 Summary statistics for dissolved oxygen (DO), Salinity, Temperature and Turbidity at ABR Project River Sonde Monitoring Stations between September 2019 and September 2020 ........25 Table 2-10 Details of 2019/2020 Dredging Activities .......................................................................................31 Table 2-11 Summary statistics for dissolved oxygen (DO), salinity (Sal), temperature (Temp) and turbidity (Turb) at monitoring stations ..........................................................................................37 Table 2-12 Mean Turbidity for Dredge and No-Dredge Intervals. Figures in brackets are the numbers of data observations in each case. ..................................................................................................38 Table 2-13 Mean Turbidity (NTU) at each depth for Buoys 1 to 4. Numbers in brackets are the number of data observations .....................................................................................................................44 Table 2-14 Mean turbidity at Buoys 1 to 4 during winter and summer seasons and during dredging and no dredging intervals. Figures in brackets are the number of data observations ........................45 Dublin Port Maintenance Dredging Programme 2022-2029 | Water Quality Risk Assessment | 8 February 2021 Page 2 rpsgroup.com WATER QUALITY RISK ASSESSMENT Table 2-15 Summary statistics for Turbidity (NTU) measured at 4 sites within the inner Liffey channel (December 2017 - October 2020) ................................................................................................52 Table 2-16 Summary statistics for Dissolved Oxygen (mg/l) measured at 4 sites within the Inner Liffey channel (December 2017 - October 2020) ..................................................................................53 Table 2-17 Summary statistics for Turbidity (NTU) measured at 4 sites within Dublin Bay (September 2017 - October 2020) ...................................................................................................................61 Table 2-18 Summary statistics for Turbidity (NTU) measured at 4 sites within Dublin Bay (September 2020) ............................................................................................................................................63 Figures Figure 2-1 Site Location in the Context of the Wider Surface Water Environment ..........................................10 Figure 2-2 Elements of the Water Framework Directive Status .......................................................................11 Figure 2-3 Water Framework Directive water body status ...............................................................................14 Figure 2-4: Nutrient Sensitive Areas .................................................................................................................15 Figure 2-5: Bathing Water Quality in the Dublin Area 2019 (EPA, 2020) .........................................................17 Figure 2-6: Natura 2000 Designated Sites .......................................................................................................18 Figure 2-7 Water quality monitoring stations in the Dublin Port area ..............................................................21 Figure 2-8 Relationship established between Turbidity and Total Suspended Solids (inner Liffey channel) ........................................................................................................................................22 Figure 2-9 Fouling of East Link sonde after 3 weeks deployment in August 2019 .........................................23 Figure 2-10 East Link Bridge Monitoring Station - Water Quality Data (12 Hour Median) ...............................26 Figure 2-11 Poolbeg Monitoring Station - Water Quality Data (12 Hour Median) ............................................27 Figure 2-12 North Bank Monitoring Station - Water Quality Data (12 Hour Median) .......................................28 Figure

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    80 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us