Moving to 2020 YRT/Viva 2016-2020 Strategic Plan Update 5 | Moving to 2020 YRT/Viva Strategic Plan Update Moving to 2020 is YRT/Viva’s 2016-2020 Figure 3: Viva Network Expansion Plan Strategic Plan that sets the direction for changes in the YRT/Viva network. As York Region grows, YRT/Viva service must adapt North VIVA NETWORK to the population it serves, and adjust where EXPANSION PLAN MAP and how transit services should be provided in order to improve public transit in York Region. As YRT/Viva moves through the GTA Rapid Transit Integration phase of the Transit Life Cycle, service will undergo significant network expansion and improvements that will better integrate transit services within York Region and the GTA. 5.1 | Viva Network Expansion Plan Service reliability and travel times across the Viva network will be improved by implementing the Viva Network Expansion Plan (VNEP). The VNEP objectives are to enhance rapid transit service through construction of dedicated rapidways, and to expand the rapid transit network through implementation of new service. Enhanced © Lucidmap Inc. 2015 and new/restructured services are planned along Yonge Street, Major Mackenzie Drive, Leslie Street, Jane Street, and Highway 7. The Viva network in 2020 is shown in Figure 3. The timing of rapidway construction and service changes to the Viva routes are summarized in Figure 4. YORK REGION TRANSIT REGION YORK ANNUAL2017 SERVICE PLAN 67 2017 Annual Service Plan Figure 4: Viva Rapid Transit Network Viva blue (Yonge Street) From 2017 to 2018, Viva blue will continue current operation of two branches along Yonge Street, with one branch operating between Finch GO Bus Terminal and Newmarket GO Bus Terminal, and a second branch operating between Finch GO Bus Terminal and Bernard Terminal. Viva blue “A” operates in peak directions during weekday rush hours only, running southbound in the morning and northbound in the afternoon, between Newmarket GO Bus Terminal and Finch GO Bus Terminal, bypassing Richmond Hill Centre Terminal. By 2019, rapidway construction on Yonge Street will be complete. Viva blue will operate in rapidways between Highway 7 and 19th Avenue/Gamble Road, and between Mulock Drive and Davis Drive. Viva purple (Highway 7 East) In 2017, Viva purple will continue current operations between York University and Markham Stouffville Hospital, along the completed rapidways on Highway 7 between Bayview Avenue and Warden Avenue. Upon opening of the Spadina Subway extension, Viva purple will be restructured to operate between Richmond Hill Centre Terminal and Markham Stouffville Hospital. Viva orange will be restructured to serve Highway 7, west of Richmond Hill Centre Terminal. Existing Viva purple service between York University and Richmond Hill Centre Terminal will be replaced by a conventional service, the York University Shuttle. YORK REGION TRANSIT REGION YORK ANNUAL2017 SERVICE PLAN 68 Moving to 2020 YRT/Viva 2016-2020 Strategic Plan Update By 2018, Viva purple will be restructured to In 2019, Viva orange will operate along the operate two branches of service between completed rapidways on Highway 7 from Town Centre Boulevard and Kennedy Road. Edgeley Boulevard to Yonge Street. Viva While the current branch operates along orange will be extended to operate between Enterprise Boulevard, a new branch will Highway 50 and Richmond Hill Centre be added along Highway 7. Viva purple will Terminal, with a branch operating between operate only on the Highway 7 branch during Highway 50 and Finch GO Bus Terminal. weekday rush hours, and will alternate between the Highway 7 and Enterprise Viva green (Leslie Street/Major Mackenzie Boulevard branches at all other times. Viva Drive) purple will also be extended from Markham From 2017 to 2019, Viva green will continue Stouffville Hospital to the Cornell Terminal current operations between Don Mills when construction is complete in 2018. Subway Station and Highway 7/McCowan Road, during weekday rush hours only. Viva pink (Yonge and Highway 7 East) From 2017 to 2019, Viva pink will continue In 2020, Viva green will be restructured to current operations between Finch GO Bus operate along the Leslie Street and Major Terminal and Unionville GO Station, along the Mackenzie Drive corridors. Viva green will completed rapidways on Highway 7 between operate all day service on Leslie Street Bayview Avenue and Warden Avenue. between Don Mills Subway Station and Major Mackenzie Drive, and on Major Mackenzie In 2020, Viva pink will be extended eastward Drive between Leslie Street and Yonge to operate between Finch GO Bus Terminal Street. The route will operate in mixed traffic and Highway 7/McCowan Road, along with transit priority measures and curbside Enterprise Boulevard. vivastations. Viva orange (Highway 7 West) Viva silver (Jane Street/Major Mackenzie Prior to the opening of the Spadina Subway Drive) extension, Viva orange will continue current In 2019, a new service will be implemented operations between Martin Grove Road and along the Jane Street and Major Mackenzie York University, with a weekday rush hour Drive corridor. Viva silver will operate all branch operating between York University day between Vaughan Metropolitan Centre and Downsview Subway Station. and Richmond Hill GO Station. The route will operate in mixed traffic with transit priority Prior to the opening of the Spadina Subway measures, and curbside vivastations. extension, a new branch of Viva orange will operate between Martin Grove Road and Promenade Terminal, along the completed rapidways on Highway 7 West, between Edgeley Boulevard and Bowes Road. Upon opening of the Spadina Subway extension, the York University branch will TRANSIT REGION YORK ANNUAL2017 SERVICE PLAN be restructured to operate between Martin 69 Grove and Richmond Hill Centre Terminal. 2017 Annual Service Plan Cornell Terminal Table 8: VNEP Annual Operating Cost and Fleet Projections The Cornell Terminal is being constructed Peak Fleet Annual Hours Annual Cost near Highway 7 and 9th Line in Markham. Route Difference Difference Difference ($) The terminal is being built to facilitate 2017 connections between YRT/Viva routes and orange (Martin Grove future connections with Durham Region 6 36,169 $3,616,900 Transit and GO Transit bus service. The to Promenade) facility will act as the eastern terminus for Sub-Total 6 36,169 $3,616,900 YRT/Viva routes. 2018 In 2017, route alignments will be reviewed purple (to Richmond -10 -44,971 -$3,372,825 to restructure service into the terminal. Hill Centre Terminal) Detailed service plans will be included under orange (Martin Grove the 2018 Annual Service Plan. to Richmond Hill -1 2,498 $187,350 Centre Terminal) Construction Mitigation During construction of the rapidways along purple (Hwy 7 branch Highway 7 West in Vaughan, and along Yonge between Town Centre 0 0 $0 Street in Richmond Hill and Newmarket, Blvd and Kennedy Rd) YRT/Viva services will be monitored to Sub-Total -11 -42,473 -$3,185,475 ensure contiuned reliability. 2019 Management of construction impacts may orange (Finch station 5 46,599 $4,659,900 include the following measures: to Hwy 50) > Operational adjustments in construction corridors silver 10 59,066 $5,906,600 > Operation of additional fleet along Sub-Total 15 105,665 $10,566,500 construction corridors to maintain 2020 frequency > Adjustments to scheduled travel times to green 3 24,697 $2,469,700 reflect on-street conditions pink (extension to 2 4,564 $456,400 McCowan Rd) Implementation schedule, fleet requirements, and annual difference in hours Sub-Total 5 29,261 $2,926,100 and cost for VNEP are shown in Table 8. Grand Total 15 128,622 $13,924,025 As of July 2016 YORK REGION TRANSIT REGION YORK ANNUAL2017 SERVICE PLAN 70 Moving to 2020 YRT/Viva 2016-2020 Strategic Plan Update 5.2 | Spadina Subway Transit Figure 5: Spadina Subway Extension Strategy The TTC Spadina Subway extension is VAUGHAN METROPOLITAN planned to be operational by year-end CENTRE STATION 2017, extending the existing Spadina VIVA RAPIDWAY HIGHWAY 7 Subway northwards by 8.6 kilometres from Downsview Station to the Vaughan Metropolitan Centre in York Region, as shown HIGHWAY 407 HIGHWAY 407 in Figure 5. STATION This extension brings high-capacity, frequent transit service into the Region, seamlessly KEELE ST. crossing the municipal boundary between HYDRO CORRIDOR York Region and Toronto. YRT/Viva bus STEELES AVE. YORK routes will be restructured to support PIONEER VILLAGE UNIVERSITY connections to the three new subway STATION STATION stations (Pioneer Village Station, Highway YORK 407 Station, and the Vaughan Metropolitan UNIVERSITY Centre Station), along with York University. DUFFERIN ST. Upon opening of the Spadina Subway HYDRO CORRIDOR extension, the YRT/Viva network will be FINCH WEST LRT CN / GO BARRIE LINE FINCH AVE. restructured to provide integrated service FINCH WEST along, and connecting to, the subway. The STATION Don River integration will focus on route directness, Black Creek JANE ST. service frequency, and ease of fare payment. DOWNSVIEW Proposed route changes are shown in PARK STATION Table 9. Additional fleet, and annual difference in hours and costs are shown in DOWNSVIEW SHEPPARD PARK Table 10. SHEPPARD AVE. WEST STATION (CURRENTLY DOWNSVIEW) ALLEN RD. EXISTING YONGE- UNIVERSITY- RAPID TRANSIT SPADINA WILSON SUBWAY INTERCHANGE KEELE ST. YARD STATION WILSON WILSON AVE. STATION YORK REGION TRANSIT REGION YORK ANNUAL2017 SERVICE PLAN 71 2017 Annual Service Plan Table 9: Restructured Routes under the SSTS Subway Station Route

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us