A New European Rapid Railway Line in Sicily

A New European Rapid Railway Line in Sicily

A New European Rapid Railway Line in Sicily Faculty of Civil and Industrial Engineering Department of Civil Constructional and Environmental Engineering Master’s degree in Transport Systems Engineering Supervisor: Candidate: Prof. Stefano Ricci Atieh KianiNejadOshah 1734077 Co-Supervisor: Ing. Pierangelo Rivoli A.A 2017-2018 Contents List of Figures: ........................................................................................................................................... 5 List of Tables: ............................................................................................................................................ 8 Acronyms .................................................................................................................................................. 9 Acknowledgments ................................................................................................................................... 10 1 Abstract ............................................................................................................................................ 11 2 Introduction and purpose of the research ...................................................................................... 12 2.1.1 Main constraints of the existing line: ............................................................................... 14 2.1.2 Objective: Improvement of Railway Accessibility in Palermo-Catania ............................ 16 3 General review of Capacity Methodologies .................................................................................... 20 3.1 Synthetic Method: .................................................................................................................... 22 3.1.1 UIC’s Compression Method – LEAFLET 406: ..................................................................... 22 3.1.2 Calculation of Capacity Consumption ............................................................................... 32 3.2 Analytical Method .................................................................................................................... 33 3.2.1 UIC's analytical method-leaflet 405R ................................................................................ 34 3.3 Analogical Method ................................................................................................................... 36 3.4 Result of Analysed Capacity Calculation Methods: .................................................................. 36 3.4.1 Combined Analytical- Analogical Approach ...................................................................... 37 3.4.2 Future Development: Utilization of UIC’s Leaflet 406 for Calculation Capacity ............... 38 4 Analysed Scenarios .......................................................................................................................... 38 4.1 Existing scenario ....................................................................................................................... 38 4.1.1 Overview of The Sicilian Network ..................................................................................... 38 4.1.2 Existing Line Characteristic ............................................................................................... 39 4.1.3 Existing Operation Plan ..................................................................................................... 44 4.1.4 Existing Rolling Stock......................................................................................................... 44 4.1.5 Existing Travel Time .......................................................................................................... 46 4.1.6 Existing Line Capacity ........................................................................................................ 48 4.2 Corridor D1-(SABIR): Doubling of The Existing Line in The Fiumetorto – Bicocca .................... 52 4.2.1 Functional Analysis of Corridor D1 ................................................................................... 53 4.2.2 Results of Corridor D1 ....................................................................................................... 59 2 4.3 Corridor A: Double Track Castelbuono-Pollina-Catenanuova .................................................. 60 4.3.1 Functional Analysis of doubling Castelbuono-Pollina ....................................................... 60 4.3.2 Result of Corridor A: ......................................................................................................... 61 4.4 Corridor B: Double Track Castelbuono-Pollina- New Enna ...................................................... 65 4.4.1 Functional Analysis of Corridor B ...................................................................................... 65 4.4.2 Results of Corridor B ......................................................................................................... 66 4.5 Corridor C-(Highway): Double Track Enna-Fiumetorto ............................................................ 68 4.5.1 Functional Analysis of Corridor C: ..................................................................................... 68 4.5.2 Result of Corridor C ........................................................................................................... 69 4.6 Scenario D2 -(Future Corridor): Existing Line Upgrade+ New Rapid Single Track .................... 70 4.6.1 Future Line Characteristic ................................................................................................. 72 4.6.2 Future Operating Model ................................................................................................... 83 4.6.3 Future Rolling Stock .......................................................................................................... 86 4.6.4 Future Travel Times .......................................................................................................... 87 4.6.5 Future Capacity ................................................................................................................. 90 5 Evaluation of scenarios through AHP method-Expert choice Software and Cost-Benefit Analysis: 95 5.1 Implementation of the AHP Methodology............................................................................... 97 5.1.1 Computing the vector of criteria weights ......................................................................... 97 5.1.2 Computing the matrix of option scores ............................................................................ 98 5.1.3 Ranking the options .......................................................................................................... 99 5.1.4 Checking the consistency .................................................................................................. 99 5.1.5 Automating the pairwise comparisons ........................................................................... 100 5.1.6 Implementation of AHP method for selection of optimal scenarios in the Sicilian network: ......................................................................................................................................... 101 5.2 Result of analysed Corridors (D1, A, B, C, D2) ........................................................................ 101 6 Operation Methodology and Opentrack® Software ...................................................................... 106 6.1 Input data: .............................................................................................................................. 108 6.1.1 Rolling Stock: ................................................................................................................... 108 6.1.2 Infrastructural Data ......................................................................................................... 115 6.1.3 Timetable ........................................................................................................................ 120 3 6.2 Simulation............................................................................................................................... 120 6.3 Output Data: ........................................................................................................................... 121 6.3.1 Result of Simulated Options by Opentrack® ................................................................... 122 7 Results ............................................................................................................................................ 130 8 Conclusions .................................................................................................................................... 131 9 Bibliography ................................................................................................................................... 132 4 List of Figures: Figure 1:Timetable for the master thesis during a period of 11 months ............................................... 11 Figure 2: European high speed corridor n.5 ........................................................................................... 12 Figure 3: local network ........................................................................................................................... 13 Figure 4: TEN-T core network corridors. corridor n°5 Helsinki-La Valletta ........................................... 14 Figure 5: Comparison means of transport (Minuetto train and bus services) ......................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    135 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us