A New Hub in Mississippi Canyon

A New Hub in Mississippi Canyon

Delta House A new hub in Mississippi Canyon Supplement to Sponsored by ® Building the FPS 23 Fifteen nations, 12,000 workers and 22 months to build Completing the package 36 The project prepares for first oil Operations 40 Safety and operational integrity are key Delta House 3 Looking Ahead 44 A new hub in In it for the long run Mississippi Canyon The Project Takes Shape 4 Company Profiles 46 A model for development in the Gulf of Mexico Banking on the Bit 8 Visionary financing allows early sanctioning VP, PennWell Custom Publishing Production Manager SPONSORED BY Roy Markum, [email protected] Shirley Gamboa Managing Editor and Principal Writer Circulation Manager Richard Cunningham, [email protected] Tommie Grigg Drilling and Completions 12 Technical Writers PennWell Petroleum Group Mike Strathman, [email protected] 1455 West Loop South, Suite 400 Focused on efficiency and safety Ron Bitto, [email protected] Houston, TX 77027 U.S.A. 713.621.9720, fax: 713.963.6285 Contributing Photographer Redding Communications, Bob Redding, CEO, PennWell Corporate Headquarters [email protected] 1421 S. Sheridan Rd., Tulsa, OK 74112 Geology of the Mississippi Canyon 18 Art Director Chairman Frank T. Lauinger Meg Fuschetti President/CEO Robert F. Biolchini Reading the reservoirs SUPPLEMENT TO ® Delta House A new hub in Mississippi Canyon e earn our money through the drill bit. Our strength is exploration. LLOG geoscientists— mostly former employees of some of the world’s largest oil producers—have a level of experience not seen in many companies our size. Working from the biggest available Wdata sets, our geoscience team develops an understanding of the reservoir that is second to none. It’s not a claim we make lightly. The success of Delta House is just the latest example of their skill at finding oil. Mississippi Canyon is one of the most prolific oil and gas regions in the Gulf of Mexico, and thanks to our lease acquisition team, we have a healthy position there. Our Who Dat field, discovered in 2007, has been a steady producer since 2011. Delta House builds on that success. While every deepwater project has its own unique challenges for the entire project team, Delta House is a showcase of who we are and what we can do. 2 LLOG EXPLORATION DELTA HOUSE LLOG EXPLORATION DELTA HOUSE 3 The Project Takes Shape A model for development in the Gulf of Mexico he Delta House deepwater floating is expected by mid-2015. According to the production system (FPS) and its current plan, at least four more LLOG fields subsea infrastructure are parts of could eventually tie into the host platform. a field development plan that has been one of the most efficient in the Working Against Time Tindustry. Delta House Phase One taps three In early 2010, a handful of joint venture Mississippi Canyon fields where the average partners were just beginning to realize the water depth is around 4,500 feet and reservoirs potential of their recently-acquired portfolio. range from 12,000 to 18,500 feet. First oil The challenge was how to drill them before the 20 or so deepwater leases they’d purchased timed out. They had less than 36 months left on the clock. The schedule would have been tough in any case, but following BP’s Macondo event, operators in the Gulf of Mexico were granted a one-time ‘presidential’ lease “Suspension of Operations” due to the drilling moratorium. While these special Suspension of Operations gave LLOG and its partners more time to study their leases, no one was sure when drilling could resume. “LLOG used the time to study the leases and pick the most valuable ones to explore. While we weren’t able to drill in time to save all the leases, we did save the ones that we felt were 4 LLOG EXPLORATION DELTA HOUSE LLOG EXPLORATION DELTA HOUSE 5 most important.” says Rick Fowler, LLOG vice House became entrenched in everyone’s mind, president of deepwater projects. the only logical name for the hub was Delta House, the fictional fraternity’s home base.” What’s in a name? “It’s typical with a project like this to let the Securing the Leases geologists name the reservoirs based on a The majority of the acreage that makes up Oil Export Delta House common theme, like the names of mountains the Delta House development and some of Gas Export MC 254 “A” PLET or rivers,” Fowler explains. “Others have used its secondary prospects was initially gained Umbilical rock bands or even cartoon characters. Our through a participation agreement with Single 6” Bulk Oil Dual 8” Bulk Oil guys used a movie.” Houston Energy, an exploration company PLET PLET MC 300 Dual 6” Bulk Oil Marmalard that had purchased 26 deepwater blocks from North The informal naming scheme was based ConocoPhillips. loosely on Animal House, a 1978 comedy about PLET a renegade college fraternity in the early 1960s. “We already held some nearby acreage and Umbilical Two of the memorable characters in the film had an interest in the ConocoPhillips blocks, Umbilical Termination Assemblies were named Bluto and Marmalard. but we were beaten to the altar by Houston Dual 6” Bulk Oil MC 300 Energy,” says Mike Altobelli, LLOG vice Marmalard PLET “Around the office, we started calling the president, land. Soon after, we reached a deal South project Bluto,” Fowler says. “The first discovery with Houston Energy that gave us 32.5 percent well became Son of Bluto Two. Now we have a in those leases.” Son of Bluto Three and Son of Bluto Four, but mostly we use the acronyms. Once Animal The problem was, the leases were about to MC 431 S on O f B luto 2 expire. The longest of them had just three years remaining. “The lease exploration Subsea layout of the Delta House Project. “We had to act fast,” Altobelli says. “We dates were staring us in assembled our group of owners, which The BSEE granted “Suspensions of Operation” us in the face. We had to get out there and the face. We had to get included LLOG and the companies in the to the partnership so drilling could proceed, drill wells.” Houston Energy partnership. Together but at least a few of the regulators had doubts out there and drill wells.” we approached the Bureau of Safety and that LLOG could drill the wells in time. After the partnership’s first two discoveries Environmental Enforcement (BSEE) and came in, the same agency granted “Suspension were successful in obtaining a five-block unit “We were very transparent in our presentations of Production” permits to allow time to for one prospect and a separate two-block to the BSEE, and since then, we’ve done complete the development through initial unit for a second prospect to advance our everything we said we were going to do,” production from the unit or lease. LLOG and Rick Fowler, drilling program.” Altobelli says. “It was a pretty dynamic time. its partners’ commitment to developing the LLOG vice president of deepwater projects I’ve never been involved in a project with that fields was the basis for the granting of the much going on in such a condensed period of Suspensions of Production. time. The lease exploration dates were staring 6 LLOG EXPLORATION DELTA HOUSE LLOG EXPLORATION DELTA HOUSE 7 Banking on the Bit Visionary financing allows early sanctioning wo separate groundbreaking deals— partners in a LLOG joint venture, which is signed just days apart—are as much the largest working interest owner of the a part of the Delta House story as subsea wells. the field itself. It’s likely that the agreement to fund the host platform Funding the FPS Tis the first of its kind in the oil industry. Much The seven companies that own the leases do of the credit for the Delta House development not own 100% of the Delta House floating goes to ArcLight Capital Partners, majority production system (FPS). Instead, LLOG and owner of the host platform, and Blackstone, its partners—owners of the fields—pay a When LLOG opened 2012 with two major process the oil and gas we produce. Since we processing fee to the owners of the FPS. While discoveries in the Gulf’s hydrocarbon-rich prefer spending our money on exploration, the that is unusual, the arrangement is not unique Mississippi Canyon, its project team began second option was a better fit.” “We could have put up the within the industry. In the case of Delta House, evaluating ways to produce the reserves. One capital to build it ourselves, but it was a critical step that allowed the whole option was to pipe the oil and gas from subsea An interesting point is that ArcLight does not project to work. The commercial contract, wells onto existing platforms owned by other own any of the reserves, only the FPS and the that would have meant a large which involved a total of eight companies, operators, but the closest potential hosts were export pipelines. If needed, ArcLight could sell investment in the midstream is quite complex. The final agreement runs 26, 29 and 35 miles away. The distances raised the FPS, since the design is suitable for most more than 8,700 pages, yet it was completed in flow assurance questions and other serious deepwater developments in other parts of side of the business.” only six months. issues. Based on the volume of reserves they had the world. That part of the agreement makes found, building a new facility made more sense. the investment more secure, because the FPS “Delta House would have been difficult to The next question was, how best to pay for it? effectively serves as collateral.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    45 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us