New Activities

New Activities

Project name: Tamil Nadu and Puducherry Coastal Disaster Risk Reduction Project- PUDUCHERRY COMPONENT New Activities Loan: CREDIT 5279-IN-PUDUCHERRY Modified Activities Procurement Plan Version: 2014-2 Public Disclosure Authorized Canceled Activities Status: Approved Activities without Modification Date of Last Change of Status: 07/05/2015 Category Works: Activities ShowHide Total days of Process (between Bid Opening and Contract Description Reference # District E/A Amount in u$s No Objection Documents Publication / Invitation Bid Opening Evaluation of Bids No Objection to Evaluation Report Contract Signature Date Signature Date) End of Contract (Completed) Comment P.P. - Executing Agency: 2014-2-PIA-PUDUCHERRY-CDRRP - PIA-PUDUCHERRY-CDRRP Method: NCB (National Competitive Bidding) PIA-PUDUCHERRY-Construction of Modern CDRRP-PUDUCHERRY-2-NCB-O- Puducherry Est. 3,409,847.00 N/A 07/08/14 08/09/14 17/11/14 N/A 15/12/14 98 30/06/16 Public Disclosure Authorized and Hygienic Fish Market in Karaikal ( Expected Add Comment Package - 4) Post Review Actual PIA-PUDUCHERRY-Construction of Slipway, CDRRP-PUDUCHERRY-3-NCB-O- Puducherry Est. 1,525,283.00 N/A 11/08/14 29/09/14 10/12/14 N/A 31/12/14 93 30/12/16 Quay, Boat Repair Yard, Power Room and Winch Room for Puducherry Fishing Expected Add Comment Harbour. (Package - 12) Post Review Actual PIA-PUDUCHERRY-Designing, Providing, CDRRP-PUDUCHERRY-4-NCB-O- Puducherry Est. 622,089.00 N/A 03/09/14 15/10/14 25/12/14 N/A 25/12/14 71 15/01/16 Construction, Erection & Commissioning, startup and performance trail run for 3 months followed by 1 year free O & M of 1 MLD capacity Effluent treatment plant Public Disclosure Authorized (ETP) based on SBR Technology for Puducherry Fishing Harbour on DBOT basis. (Package - 14) Expected Add Comment Post Review Actual PIA-PUDUCHERRY-Construction of Slipway, CDRRP-PUDUCHERRY-5-NCB-O- Puducherry Est. 1,050,553.00 07/08/14 22/08/14 21/09/14 30/11/14 15/12/14 14/01/15 115 29/12/15 Estimated Amount Update ($1050553.00) Power Room, Winch Room and Boat Repair and/or method (National Competitive yard for Karaikal Fishing Harbour (Package - Bidding) 02/01/2015 03:18 16) Contract under execution Add Comment Prior Review Actual 05/11/14 20/11/14 23/12/14 14/02/15 03/03/15 14/05/15 142 PIA-PUDUCHERRY-Construction of Chill CDRRP-PUDUCHERRY-6-NCB-O- Puducherry Est. 916,272.00 N/A 07/08/14 08/09/14 17/11/14 N/A 15/12/14 98 29/07/15 Estimated Amount Update ($916272.00) Plant, Fish Processing Unit and Two Sumps and/or method (National Competitive for Karaikal Fishing Harbour (Package - 17) Bidding) 02/01/2015 03:21 Public Disclosure Authorized Evaluation under execution Add Comment Post Review Actual N/A 20/11/14 23/12/14 23/04/15 N/A PIA-PUDUCHERRY-Designing, Providing, CDRRP-PUDUCHERRY-7-NCB-O- Puducherry Est. 726,880.00 N/A 07/08/14 08/09/14 17/11/14 N/A 15/12/14 98 29/12/16 Construction, Erection & Commissioning, startup and performance trail run for 3 months followed by 1 year free O & M of 1 MLD capacity Effluent treatment plant (ETP) based on SBR Technology for Karaikal Fishing Harbour on DBOT Basis under CDRRP. (Package - 18) Ongoing Activity Add Comment Post Review Actual N/A 05/05/15 PIA-PUDUCHERRY-Improvements to the CDRRP-PUDUCHERRY-8-NCB-O- Puducherry Est. 447,605.00 N/A 22/09/14 05/12/14 25/01/15 N/A 15/02/15 72 14/09/15 existing fish market in Puducherry (Balance work) under CDRRP.(Package - 19) Expected Add Comment Post Review Actual PIA-PUDUCHERRY-Construction of the CDRRP-PUDUCHERRY-9-NCB-O- Puducherry Est. 58,882.00 N/A 12/01/15 23/02/15 04/05/15 N/A 24/05/15 90 23/02/16 work shelters in Narambai and M.Pudukuppam fishing villages along the Pondicherry (Balance work) coasts under Expected Add Comment CDRRP. (Package - 21) Post Review Actual PIA-PUDUCHERRY-Construction of the CDRRP-PUDUCHERRY-10-NCB-O- Puducherry Est. 44,079.00 N/A 12/01/15 23/02/15 04/05/15 N/A 24/05/15 90 23/02/16 work shelters in Periaveerampattinam and Pudukuppam fishing villages along the Puducherry (Balance work) coasts under Expected Add Comment CDRRP. (Package - 20) Post Review Actual PWD-PUDUCHERRY-Strengthening and CDRRP-PUDUCHERRY-11-NCB-O-PKG- Puducherry Est. 2,483,034.00 30/07/14 11/08/14 25/09/14 04/12/14 15/12/14 15/01/15 112 14/03/16 rehabilitation of the existing old bridge in CDRRP/PIA/ PWD/BR/01 Nonankuppam, Puducherry. PKG-CDRRP/PIA/ PWD/BR/01 Expected Add Comment Prior Review Actual PWD-PUDUCHERRY-Strengthening and CDRRP-PUDUCHERRY-14-NCB-O-PKG- Puducherry Est. 798,353.00 N/A 11/08/14 25/09/14 04/12/14 N/A 05/01/15 102 04/03/16 rehabilitation of the existing old CDRRP/PIA/ PWD/BR/02 Ariyankuppam bridge in Ariyankuppam river, Puducherry. PKG-CDRRP/PIA/ PWD/BR/02 Expected Add Comment Post Review Actual PWD-PUDUCHERRY-Reconstruction of the CDRRP-PUDUCHERRY-15-NCB-O- Puducherry Est. 632,219.00 N/A 11/08/14 25/09/14 04/12/14 N/A 05/01/15 102 04/12/15 existing old bridge in Cuddalore road near CDRRP/PIA/ PWD/BR/03 Thavalakuppam, Puducherry. PKG-CDRRP/PIA/ PWD/BR/03 Expected Add Comment Post Review Actual PWD-PUDUCHERRY-Reconstruction of CDRRP-PUDUCHERRY-16-NCB-O- Puducherry Est. 174,933.00 N/A 11/08/14 25/09/14 04/12/14 N/A 05/01/15 102 04/09/15 culvert in Vaithkuppam road over CDRRP/PIA/ PWD/CL/01 Karuvadikuppam drain near old distilleries, Puducherry. PKG-CDRRP/PIA/ PWD/CL/01 Expected Add Comment Post Review Actual ELE.DEPT-PUDUCHERRY-HT interlink CDRRP-PUDUCHERRY-17-NCB-O- Puducherry Est. 1,958,333.00 04/09/14 14/09/14 24/09/14 24/12/14 09/01/15 30/01/15 128 30/01/16 provision for the newly constructed 110/ PKG.01/CDRRP/PIA/ELEC 11 KV substation to part of town (Coastal area of Muthialpet, Solain Nagar, Vaithikuppam and Kuruchikuppam)- Expected Add Comment PKG.01/CDRRP/PIA/ELEC Prior Review Actual PWD-PUDUCHERRY-Reconstruction of CDRRP-PUDUCHERRY-18-NCB-O- Puducherry Est. 161,460.00 N/A 11/08/14 25/09/14 04/12/14 N/A 05/01/15 102 04/09/15 Culvert in Vaithikuppam Road Near old CDRRP/PIA/ PWD/CL/02 Maravadi street, Solai nagar, Puducherry. PKG-CDRRP/PIA/ PWD/CL/02 Expected Add Comment Post Review Actual ELE.DEPT-PUDUCHERRY- Conversion of low CDRRP-PUDUCHERRY-19-NCB-O- Puducherry Est. 1,300,732.00 N/A 11/11/14 21/12/14 11/02/15 N/A 02/03/15 71 30/08/15 tension over head line into U.G. cable PKG.02/CDRRP/PIA/ELEC system with service connection and street lights in Ganapathichetti kullam, Chinnaklapet and Pillaichavady (Kalapet O&M) on Puducherry coastal area (under CDRRP) -PKG.02/CDRRP/PIA/ELEC Expected Add Comment Post Review Actual ELE.DEPT-PUDUCHERRY- Conversion of low CDRRP-PUDUCHERRY-20-NCB-O- Puducherry Est. 1,946,108.00 N/A 05/02/15 16/02/15 27/03/15 N/A 08/06/15 112 06/12/16 tension over head line into U.G. cable PKG.03/CDRRP/PIA/ELEC system with service connection and street lights in Muthupillai nagar, Abdoul kalam nagar,PWD Quaters and Thangaithittu main road (Mudiyaliyarpet O&M) in Puducherry (under CDRRP) -PKG.03/CDRRP/PIA/ELEC Expected Add Comment Post Review Actual ELE.DEPT-PUDUCHERRY- Conversion of CDRRP-PUDUCHERRY-21-NCB-O- Puducherry Est. 1,829,674.00 N/A 06/12/15 15/01/16 05/03/16 N/A 25/03/16 70 24/09/17 Low Tension Over head line into U.G.Cable 04/CDRRP/PIA/ELEC system with service connection and street lights in Pudhunagar, Purushothaman nayakar street and Mudaliyarpet (Mudiyaliyarpet O&M) in Puducherry (under CDRRP scheme) - Expected Add Comment PKG.04/CDRRP/PIA/ELEC Post Review Actual ELE.DEPT-PUDUCHERRY- Conversion of CDRRP-PUDUCHERRY-22-NCB-O- Puducherry Est. 1,081,171.00 N/A 25/05/15 04/07/15 25/08/15 N/A 15/09/15 73 14/03/17 Low Tension Over head line into U.G.Cable 05/CDRRP/PIA/ELEC system with service connection and street lights in Murungapakkam and Nainarmandabam (Murungapakkam O&M) in Puducherry (under CDRRP scheme)- PKG.05/CDRRP/PIA/ELEC Expected Add Comment Post Review Actual ELE.DEPT-PUDUCHERRY- Conversion of CDRRP-PUDUCHERRY-23-NCB-O- Puducherry Est. 1,314,038.00 N/A 14/08/15 23/09/15 13/11/15 N/A 03/12/15 71 02/06/17 Low Tension Over head line into U.G.Cable 06/CDRRP/PIA/ELEC system with service connection and street lights in Ariyankuppam, Bharathi nagar and Toll gate ( Ariyankuppam O&M) in Puducherry (under CDRRP scheme) - PKG.06/CDRRP/PIA/ELEC Expected Add Comment Post Review Actual ELE.DEPT-PUDUCHERRY- Conversion of CDRRP-PUDUCHERRY-24-NCB-O- Puducherry Est. 1,829,674.00 N/A 18/06/16 28/07/16 15/09/16 N/A 05/10/16 69 04/04/18 Low Tension Over head line into U.G.Cable 07/CDRRP/PIA/ELEC system with service connection and street lights in Manaveli ( Ariyankuppam O&M )in Puducherry (under CDRRP scheme) - PKG.07/CDRRP/PIA/ELEC Expected Add Comment Post Review Actual ELE.DEPT-PUDUCHERRY- Conversion of CDRRP-PUDUCHERRY-25-NCB-O- Puducherry Est.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us