Connecting Europe – Designhaus Berlin

Connecting Europe – Designhaus Berlin

A fast, efficient and sustainable route between Berlin and Szczecin would be Publisher extremely valuable for Europe. DB Netz AG Elisabeth-Schwarzhaupt-Platz 1 10155 Berlin Photos: Front cover: IVD Ingenieur- und Vermessungsbüro Dimitrov Page 5: Fotolia Maps: Connecting Europe – designhaus berlin Subject to change No responsibility accepted upgrading the for the correctness of the information As of November 2018 Angermünde–Szczecin route Print management: DB Kommunikationstechnik GmbH Karlsruhe, www.dbkt.de Scandinavia-Mediterranean Szczecin What to expect: Baltic Sea-Adriatic project milestones Angermünde 1st section (Angermünde-Passow) Orient-Eastern Mediterranean Construction legislation (planning approval): expected 2021 Start of construction: expected 2021 Berlin–Szczecin Operational: expected 2025 Berlin twin-track improvement 2nd section (Passow-D/PL border) of European rail traffic Construction legislation (planning approval): expected 2022/23 North Sea–Baltic Sea Start of construction: expected 2024 Operational: expected 2026 What do we aim to achieve? As of November 2018 More passengers, more freight transport: increased route capacity Faster and more convenient: Szczecin TEN-V network corridors travel time between Berlin and Szczecin reduced to Route upgrade 90 minutes (including Nordkreuz-Karow upgrade) by Angermünde–D/PL border, 49 kilometres increasing the route speed from 120 km/h to 160 km/h Gumience What does the upgrade of the Zero emission transport: Angermünde–Szczecin route continuous electrification between Berlin and Szczecin mean for Europe? Grenze D/PL What are we doing? A 11 Sustained improvement in transport links between B 2 31 Scandinavia, Central and Western Europe as well as between 1st section (Angermünde–Passow, 19 kilometres) Germany and Poland Replacing the existing overhead power cables Tantow A 20 Improved links between the TEN-V core network corridors Upgrading existing tracks to 160km/h Building a new conversion plant in Angermünde for traction Petershagen Scandinavia-Mediterranean power supply Casekow Gartz North Sea-Baltic Sea Modernising one station Baltic Sea-Adriatic B 166 Building 740 metres of overtaking tracks Schönow Orient-Eastern Mediterranean Equipping the route with ETCS (European Train Control System) Passow Improved hinterland connection to Poland's Baltic Sea ports 2nd section (Passow–D/PL border, 30 kilometres) Improved cross-border rail traffic: development impetus along Building a second track the route, as well as in the metropolitan areas of Szczecin and Installing new overhead power cables (initial electrification) Berlin-Brandenburg Upgrading existing tracks to 160km/h B 198 Future sustainability of the rail connection between Szczecin Modernising four stations Raffinerie and Berlin Building 740 metres of overtaking tracks In conjunction with the A11/E28 motorway and Oder-Havel Canal Equipping the route with ETCS Schwedt/Oder B 2 in Szczecin, the route is the only trimodal TEN-V core network axis 1st construction phase between Poland and Germany. Angermünde 2nd construction phase Flugplatz Crussow.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us