Shri Narendra Modi Hon’ble Prime Minister NEW RAILWAYS New Jharkhan A progressive journey since 2014 Koderma Parliamentary Constituency PREFACE Indian Railways is the lifeline of the Nation and a catalyst for India’s progress and economic development. It plays a significant role in the socio-economic development of every region of the country including the state of Jharkhand. With a view to improve railway infrastructure and to extend the railway network in Jharkhand, Ranchi Railway Division was formed in the year 2003. The Government of Jharkhand always extends necessary support and cooperation to Indian Railways towards development of the state and improvement of services for the people. Godda Shivpur Sanki Tatisilwai Map not to scale In a mission mode, railways have achieved many visible milestones in Jharkhand in the last seven years in different fields i.e. construction of new lines, doubling, development of stations etc. On the freight side, loading has reached a new milestone where the potentiality of the state enriched with minerals played the lead role. The changing face of transport sector in Jharkhand and the expectations of its people are being fulfilled with topmost priority. In the wake of COVID-19 pandemic, Indian Railways is playing a significant role by taking various measures to combat the situation. With a view to contain the spread of Novel Coronavirus, Indian Railways is producing PPE Kits, Reusable Face Masks, Hand Sanitizer etc. In addition, coaches have been converted to COVID Care Centres. Some of the recent achievements of railways and ongoing projects parliamentary constituency-wise in the state of Jharkhand are being highlighted in this Pamphlet. It may be noted that the budget allocated to various projects is not apportioned state wise but ref lects the cost of the project. INPUTS BY RAILWAY IN KODERMA CONSTITUENCY KODERMA PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS : Koderma, Barkatha, Dhanwar, Bagodar, Jamua & Gandey B. WORKS COMPLETED IN LAST SEVEN YEARS: B.1 Infrastructural Developments: u N ew Line from Nawadih to Maheshmunda (76.93 KM), from Koderma to Hazaribagh (80 KM) commissioned at a cost of Rs.242.44 crores u R eplacement of diamond crossing by fan-shaped points crossing from DN GC at Gujhandi u Panel interlocking work at Mahesmunda u Electrification of 61.803 TKM including Koderma-Rema section of 56.577 TKM commissioned u CCTV has been installed at Koderma for Surveillance system under Nirbhaya Fund u Construction of new Crew Lobby & Running Room at Koderma at the cost of Rs. 4.25 Crore. B. 2 Passenger Amenities u 4 to ilets at Hazaribagh Road & Parsasbad Station at a cost of Rs.0.060 crores u Station Ticket Booking Agent (STBA) at Sarmatand and Gajhandi stations u Parking stand at south side of Koderma Station u FOB constructed at Dhanwar, Jamua, Koderma town, Nawadih & Rema u Lift installed at PF No.1 and south side circulating area at Koderma u Pay & Use toilet provided at south side circulating area at Koderma u Platform raising at Parsabad u Wi-Fi facility has been provided at 9 stations (Chaudhuri Bandh, Chichaki, Hazaribagh Road, Chaube, Parasabad, Sarmatanr, Hirodih, Koderma and Gujandhi). C. ON GOING WORKS: u N e w line from Kanwar to Maheshmunda in Koderma-Giridih New Line at a cost of Rs.295.00 crores u Electrification of New Broad Gauge Line Koderma excluding - Urwan including at a cost of Rs.19.35 crores u Electrification of Maheshmunda excluding Giridih, Kanwar including, Koderma excluding at a cost of Rs.136.70 crores u Koderma to Tilaiya New Line (15.256 KM)at a cost of Rs. 200.00 crores u Provision of RPF Barrack at Hirodih, Sarmatand, Parsabad, Choube, Choudharibanh, Chichaki, Hazaribagh Road in GC Section at a cost of Rs.1.55 crores u Replacement of STM -1 by STM - 4 for upgradation of Optic Fiber Cable Communication System a t Mahesmunda in Asansol Dsivision u Provision of Road Over Bridger at 6 LC Gate. between Dasarah BH-Parsabad, 1 between Koderma Town-Maheshpur, 2 between Koderma Town-Maheshpur, 3 between Nawalsahi-Nawadih, 4 between Nawalsahi-Nawadih, 5 between Nawadih-Rakeshbagh u Provision of Limited Height Subways at 9 Level Crossing Gate. between Dasarah BH-Parsabad, between Yadudih-Sarmatanr, between Yadudih-Sarmatanr, between Sarmatanr-Hirodih, between Sarmatanr-Hirodih, between Hirodih-Larabad, between Hirodih-Larabad, between Koderma-Gujahandi, between Gujahandi-Lalbagh BH. SOME IMPORTANT PHOTOS Constructed new Crew Lobby & Running Room at Koderma Enhance Passenger Amenities at Koderma Station New Station Facade at Hazaribagh Town Station.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages4 Page
-
File Size-