Proposed Redevelopment of Subhash Nagar Under Sra Scheme

Proposed Redevelopment of Subhash Nagar Under Sra Scheme

FORM 1 & 1A ‘ For PROPOSED REDEVELOPMENT OF SUBHASH NAGAR UNDER SRA SCHEME At Land Bearing S. No. 509 & 510 (pt), Village‐ Panchpakhadi, Tal. & Dist. – Thane, Maharashtra. Proposed By Jaykali Developers Pvt. Ltd. Application form for Environmental Clearance Project Name: Redevelopment Project at Subhash Nagar, Thane (W). APPENDIX ‐ I (See paragraph – 6) FORM 1 (I) Basic Information Sr. Item Details No. 1 Name of the project/s Proposed Redevelopment of Subhash Nagar, Thane (W), Maharashtra 2 S. No. in the Schedule 8 (a) 3 Proposed capacity / area/ Total Plot Area 37,370.00 m2 length/tonnage to be handled/ Built‐up Area command area/lease area/ number of wells to be drilled. FSI Area 1,38,493.24 m2 Non FSI Area 1,72,676.61 m2 Total Construction Built 3,11,169.85 m2 Up Area 4 New / Expansion / Redevelopment Project under SRA Scheme Modernization 5 Existing Capacity/ Area etc. Existing Slums 6 Category of project i.e. A or B A category 7 Does it attract the general No condition? if yes, please specify 8 Does it attract the specific No condition? If yes, please specify 9 Location Plot/Survey/ Khasra No. On land Bearing S. No 509 & S. No. 510 (pt) Village Panchpakhadi Tehsil Thane District Thane State Maharashtra 10 Nearest railway station/port Thane Railway station: Approx.: 4.0 km along with distance in kms. 11 Nearest Town, city, District Headquarters along with Thane city distance in kms. 12 Village Panchayat, Zilla Parishad, Municipal Corporation, Local body Thane Municipal Corporation (complete postal addresses with telephone nos. to be given) 13 Name of the applicant Jaykali Developers Pvt. Ltd., Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 1 Application form for Environmental Clearance Project Name: Redevelopment Project at Subhash Nagar, Thane (W). 14 Registered address SP Centre, 41/44, Minoo Desai Marg, Colaba, Mumbai – 400005. 15 Address for correspondence: SP Centre, 41/44, Minoo Desai Marg, Colaba, Mumbai – 400005. Name Shri. Subodh Pagnis Designation(Owner/ Partner/ Sr. Vice President – Regulatory Approvals CEO) Address SP Centre, 41/44, Minoo Desai Marg, Colaba, Mumbai – 400005. Pin code Mumbai – 400005. E‐mail [email protected] Telephone No. 022 – 67490346 Fax No. ‐ 16 Details of alternative sites Village‐District‐State examined, if any. Location of 1. these sites should be shown on a toposheet. 2. 3. Redevelopment of Existing slums/ Structures 17 Interlined projects Not Applicable 18 Whether separate application of interlinked project has been No submitted? 19 If yes, date of submission 20 If No, Reason Stand alone construction project 21 Whether the proposal involves NA. approval/clearance under: if, As per MoEF&CC ESZ Notification No. S.O. 3645(E) yes details of the same and their dated 05.12.2016 our site is outside eco sensitive status to be given zone i.e. (100 m) & at a distance about 1.8 km. Hence a) The Forest the clearance from the standing committee of NBWL (Conservation) Act, is not required. 1980? b) The wildlife (protection) Act, 1972? c) The CRZ Notification, 1991? 22 Whether there is any No Government Order/policy relevant/relating to the site? 23 Forest land involved ( hectares) No Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 2 Application form for Environmental Clearance Project Name: Redevelopment Project at Subhash Nagar, Thane (W). 24 Whether there is any litigation No pending against the project and/or land in which the project is propose to be set up? a) Name of the court b) Case No. c) Orders/ Directions of the court if any and its relevance with the proposed project. Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate Sr. Information/Checklist Yes/No quantities /rates, wherever possible) with No. confirmation source of information data 1.1 Permanent or temporary No Land is reserved for Residential change in land use, land cover Development as per the DP of TMC. or topography including Existing slum/structures will be demolished increase in intensity of land and the demolition quantity will be disposed use (with respect to local land as per District collector guidelines. use plan) 1.2 Clearance of existing land, No No trees on site vegetation and buildings? 1.3 Creation of new land uses? No The plot of project site is already approved for residential development as per local development plan and will be developed as per the local building by‐laws. Hence, no new land use will be created. 1.4 Pre‐construction investigations Yes Hydrogeological assessment and Geophysical e.g. bore houses, soil testing? investigation will be carried out. 1.5 Construction works? Yes Proposed Redevelopment of slums/ structures 1.6 Demolition works? Yes Existing slums/ structures will be demolished and about 40,273 m3 of demolition quantity will be disposed at designated disposal site as approved by the District Collector/TMC. 1.7 Temporary sites used for Yes Temporary sheds will be provided for construction works or Housing workers of construction workers? 1.8 Above ground buildings, Excavation will be carried out for Basement structures or earthworks Yes and foundation purposes. Most of the including linear structures, cut excavated soil will be used for back filling at and fill or excavations project site only. Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 3 Application form for Environmental Clearance Project Name: Redevelopment Project at Subhash Nagar, Thane (W). Details thereof (with approximate Sr. Information/Checklist Yes/No quantities /rates, wherever possible) with No. confirmation source of information data 1.9 Underground works including No mining or tunnelling? 1.10 Reclamation works? No 1.11 Dredging? No 1.12 Offshore structures? No 1.13 Production and manufacturing No Construction project processes? 1.14 Facilities for storage of goods Yes Only construction material will be stored in or materials? temporary storage site 1.15 Facilities for treatment or Yes Existing Facilities: No Sewage & Solid waste disposal of solid waste or treatment facilities are available on site. liquid effluents? Proposed Facilities: Solid waste will be treated by mechanical composting method (Eco bio‐compack). Sewage generated from the proposed complex will be treated in Sewage treatment Plant. The excess treated water will be directly disposed in Municipal Sewer Lines (Existing) The treated water will be used for flushing and Gardening. The dried sludge and compost will be used as manure for landscaping. 1.16 Facilities for long term housing No of operational workers? 1.17 New road, rail or sea traffic Yes Existing road network will be used during during construction or construction and operation phase of project. operation? 1.18 New road, rail, air waterborne No Existing road will be used for the transport or other transport purpose. infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No lines or pipelines? 1.21 Impoundment, damming, No culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 4 Application form for Environmental Clearance Project Name: Redevelopment Project at Subhash Nagar, Thane (W). Details thereof (with approximate Sr. Information/Checklist Yes/No quantities /rates, wherever possible) with No. confirmation source of information data 1.23 Abstraction or transfers of No water form ground or surface waters? 1.24 Changes in water bodies or the No There is no water body within project site. land surface affecting drainage The existing drainage system will be or run‐off? upgraded by providing proper storm water and sewer network. 1.25 Transport of personnel or Yes Construction workers and construction materials for construction, material operation or decommissioning? 1.26 Long‐term dismantling or No decommissioning or restoration works? 1.27 On going activity during Yes Dust generation and increase in Noise levels decommissioning which could during demolitions of existing slums/ have an impact on the structures. environment? 1.28 Influx of people to an area in Yes Construction workers during construction either temporarily or phase and residents during operation phase permanently? 1.29 Introduction of alien species? No No introduction of alien species will occur as this is purely residential project 1.30 Loss of native species or No No threat of species loss will occur. genetic diversity? 1.31 Any other actions? No No 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non‐ renewable or in short supply): Sr.No. Information/checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    36 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us