
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT SAND /B OULDER /B AJRI MINING PROJECT OF YAMUNA NADI BAYA KINARA RIVER DHAULA KATCH NO.1, TIMLI FOREST RANGE (A REA 40.00 HA) TABLE OF CONTENTS 1.0. EXECUTIVE SUMMARY ________________________________________________________________ 3 1.1. Salient Features Of The Project ______________________________________________________ 3 1.2. Proposed Planning _________________________________________________________________ 4 2.0. INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION ____________ 4 2.1. Identification of Project Proponent ___________________________________________________ 4 2.2. Brief Description Of Nature Of The Project ____________________________________________ 5 2.3. Need For The Project And Its Importance To The Country And/or Region ________________ 6 2.4. Demand-Supply Gap ________________________________________________________________ 6 2.5. Imports vs. Indigenous production ___________________________________________________ 6 2.6. Export Possibility ___________________________________________________________________ 6 2.7. Domestic/ Export Markets ___________________________________________________________ 7 2.8. Employment Generation ____________________________________________________________ 7 3.0. PROJECT DESCRIPTION _______________________________________________________________ 7 3.1. Type Of Project Including Interlinked And Interdependent Projects, If Any ______________ 7 3.2. Location (Map showing general location, specific Location, and project Boundary & Project Site Layout) with Coordinates ______________________________________________________________ 7 3.3. Details Of Alternate Sites considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted _________________ 8 3.4. Size or Magnitude of Operation ______________________________________________________ 8 3.4.1. Mineral Reserves During the Lease Period __________________________________________ 8 3.4.2. Production Parameters ___________________________________________________________ 9 3.5. Project Description With Process Details (a schematic diagram/ flow chart showing the project layout, components of the project etc.) _______________________________________________ 9 3.5.1. method of mining ______________________________________________________________ 11 3.5.2. Blasting _______________________________________________________________________ 12 3.6. Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area Of Final Product/S, Mode Of Transport Of Raw Material And Finished Product ____________________ 12 3.7. Resource Optimization/ Recycling And Reuse ________________________________________ 12 3.8. Availability Of Water Its Source, Energy / Power Requirement & Source ________________ 12 3.8.1. Water Requirement ____________________________________________________________ 12 3.8.2. Power ________________________________________________________________________ 12 3.9. Quantity Of Wastes To Be Generated (Liquid And Solid) And Scheme For Their Management/ Disposal ___________________________________________________________________ 12 3.9.1. Solid Waste Generation & its Disposal _____________________________________________ 13 3.9.2. Liquid Effluent _________________________________________________________________ 13 3.10. SCHEMATIC REPRESENTATIONS OF THE FEASIBILITY DRAWING WHICH GIVE INFORMATION OF EIA PURPOSE ___________________________________________________________ 13 4.0. SITE ANALYSIS _______________________________________________________________________ 14 4.1. Connectivity ______________________________________________________________________ 14 4.2. Landform, Landuse And Land Ownership ____________________________________________ 15 4.2.1. Landform _____________________________________________________________________ 15 4.2.2. Land Use ______________________________________________________________________ 15 4.2.3. Land Ownership _______________________________________________________________ 15 PRE -FEASIBILITY REPORT PAGE 1 SAND /B OULDER /B AJRI MINING PROJECT OF YAMUNA NADI BAYA KINARA RIVER DHAULA KATCH NO.1, TIMLI FOREST RANGE (A REA 40.00 HA) 4.3. Topography _______________________________________________________________________ 15 4.4. Existing Land Use Pattern __________________________________________________________ 16 4.4.1. Environmental Sensitivity _______________________________________________________ 16 4.5. Existing Infrastructure _____________________________________________________________ 17 4.6. Soil Classification __________________________________________________________________ 17 4.7. Climatic Data From Secondary Sources ______________________________________________ 18 4.8. Social Infrastructure _______________________________________________________________ 19 5.0. PLANNING BRIEF _____________________________________________________________________ 19 5.1. Planning Concept __________________________________________________________________ 19 5.2. Assessment Of Infrastructure Demand (Physical & Social) _____________________________ 19 5.3. Amenities/Facilities _______________________________________________________________ 19 5.3.1. Mines Office, Workshop etc. ______________________________________________________ 19 5.3.2. Rest Shelter ___________________________________________________________________ 19 5.3.3. Water Supply __________________________________________________________________ 20 5.3.4. Power Supply __________________________________________________________________ 20 5.3.5. Transport of Men and Material ___________________________________________________ 20 5.3.6. Communication ________________________________________________________________ 20 5.3.7. Security Arrangements __________________________________________________________ 20 6.0. PROPOSED INFRASTRUCTURE _____________________________________________________ 20 6.1. Industrial Area (Processing Area) ___________________________________________________ 20 6.2. Residential Area (Non Processing Area) _____________________________________________ 20 6.3. Green Belt ________________________________________________________________________ 20 6.4. Social Infrastructure _______________________________________________________________ 21 6.5. Connectivity ______________________________________________________________________ 21 6.6. Drinking Water Management _______________________________________________________ 21 6.7. Sewerage System __________________________________________________________________ 21 6.8. Industrial Waste Management ______________________________________________________ 21 6.9. Solid Waste Management ___________________________________________________________ 21 6.10. Power Requirement & Supply/ Source ____________________________________________ 22 7.0. REHABILITATION AND RESETTLEMENT (R&R) PLAN _________________________ 22 8.0. PROJECT SCHEDULE & COST ESTIMATES ________________________________________ 22 8.1. Likely Date Of Start Of Construction And Likely Date Of Completion ____________________ 22 8.2. Estimated Project Cost Along With Analysis In Terms Of Economic Viability Of The Project 22 9.0. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)_______________________ 23 9.1. Financial And Social Benefits With Special Emphasis On The Benefit To The Local People Including Tribal Population, If Any, In The Area _____________________________________________ 23 PRE -FEASIBILITY REPORT PAGE 2 SAND /B OULDER /B AJRI MINING PROJECT OF YAMUNA NADI BAYA KINARA RIVER DHAULA KATCH NO.1, TIMLI FOREST RANGE (A REA 40.00 HA) 1.0. EXECUTIVE SUMMARY The proposed project is for mining of Minor Minerals (sand, boulder and bajri) in an area of 40.00 ha from the river bed of Yamuna Nadi Baya Kinara Dhaula Katch No.1, Timli range forest range, located near village- Kulhan Matak Majri, Tehsil- Vikasnagar, District-Dehradun, Uttarakhand. The project site comes in Timli Range under Dehradun Forest Division of, Dehradun. The river along its course brings huge quantity of material consisting of sand, boulder & bajri during every monsoon. This material has to be removed every year in order to channelize the river course to the middle and to prevent it from widening & thus causing cutting of nearby agriculture & forest land. Uttarakhand Forest Development Corporation (UKFDC) is a statutory body constituted by the Uttarakhand State Government, involved in collection and disposal of minor minerals from the rivers situated inside reserved forest areas. A combined joint inspection was carried out for estimating the total mineable area by a Joint Inspection Committee and an area of 32 ha was sanctioned for mining by Geology & Mining Unit vide letter no. 584/BHU. KHANI.I./2012-13 dated 19 th January, 2013. Copy enclosed as Annexure-I. As the mine lease area falls under reserved forest range for the same forest clearance is required, this is under process. Proposed project will also required NBWL clearance due to presence of Rajaji National park within 10 km radius of study area. Wild life clearance is under process. 1.1. SALIENT FEATURES OF THE PROJECT Project name Sand, Bajri ,Boulder mining from River Bed of Yamuna Nadi Baya Kinara River Dhaula Katch No.1,Timli range forest range Dehradun Mine lease area- 40 ha. Location of mine Yamuna Nadi Baya Kinara river bed Village- Kulhan Matak Majri Tehsil : Vikasnagar District : Dehradun State : Uttarakhand Latitude 30°24'4.30"N to 30°24'57.80"N Longitude 77°34'40.20"E
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages24 Page
-
File Size-