Erosion and Sediment Control Best Management Practices

Erosion and Sediment Control Best Management Practices

EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICE MANUAL WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF WATER AND WASTE MANAGEMENT 2006 REVISED AUGUST 29, 2016 TABLE OF CONTENTS Chapter 1 INTRODUCTION................................................................1-1 Regulatory Requirements.......................................................1-2 State Water Quality Standards ...............................................1-3 Total Maximum Daily Loads (TMDLs) ................................1-4 Local Ordinances ...................................................................1-4 Endangered Species Act ........................................................1-4 Permitting for In-Stream Construction and Wetland Filling .1-5 DNR Stream Activity Application.........................................1-5 Federal Permits ......................................................................1-5 401 Water Quality Certification.............................................1-6 Acknowledgements................................................................1-7 Corrections .............................................................................1-7 Future Updates .......................................................................1-7 Chapter 2 How to Prepare a Sediment Control Plan .........................2-1 Section 1 General Guidelines.................................................2-3 Section 2 Step-By-Step Procedures .......................................2-5 12 Basic Sediment Control Plan Elements ............................2-7 Section 3 Checklist for Sediment Control Plans....................2-13 Chapter 3 Standards and Specifications ..............................................3-1 Erosion Control Preserving Existing Vegetation..............................................3.01-1 Stabilized Construction Entrance...........................................3.02-1 Temporary Construction Road, Work and Parking Area Stabilization...................................................................3.03-1 Safety Fence...........................................................................3.04-1 Rock Check Dams..................................................................3.05-1 Wattles ...................................................................................3.06-1 Commercial Silt Dikes ...........................................................3.07-1 Surface Roughening...............................................................3.08-1 Topsoiling ..............................................................................3.09-1 Temporary Seeding ................................................................3.10-1 Permanent Seeding.................................................................3.11-1 Mulching including Flexible Growth Medium and Bonded Fiber Matrix..............................................................3.12-1 Rolled Erosion Control Products ...........................................3.13-1 Sodding .................................................................................3.14-1 Temporary Diversions ...........................................................3.15-1 Pipe Slope Drain ....................................................................3.16-1 Outlet Protection ....................................................................3.17-1 Right of Way Diversion .........................................................3.18-1 Level Lip Spreader.................................................................3.19-1 Surface Water Control ...........................................................3.20-1 Instream BMPs.......................................................................3.21-1 Dewatering .............................................................................3.22-1 Riprap.....................................................................................3.23-1 Geotextiles .............................................................................3.24-1 Sediment Control Vegetative Buffer Strip ..........................................................3.25-1 Reserved.................................................................................3.26-1 Silt Fence ..............................................................................3.27-1 Super Silt Fence .....................................................................3.28-1 Sediment Trap ........................................................................3.29-1 Sediment Basin ......................................................................3.30-1 Reserved.................................................................................3.31-1 Reserved.................................................................................3.32-1 Inlet Protection.......................................................................3.33-1 Reserved.................................................................................3.34-1 Access/Low Volume Road/Driveways ..................................3.35-1 Chapter 4 Urban Hydrology for Small Watersheds (TR-55) ............4-1 Chapter 5 Design Examples ..................................................................5-1 Sediment Basin Design Example...........................................5-1 Stormwater Management Pond Design Example ..................5-6 Chapter 6 Sample plans.........................................................................6-1 Individual house.....................................................................6 Typical Site grading ...............................................................6 Utility line ..............................................................................6 Chapter 7 Stream Restoration Standard Guidelines and Specifications .............................................7-1 Stream Restoration Introduction ............................................7 7-2 In-Stream Structures, Riffles and Pools.................................7.01-1 Constructed Benches and Floodplains ...................................7.02-1 New Channel Construction ....................................................7.03-1 Transporting Material on the Stream Bed..............................7.04-1 Chapter 8 Steep Slope Construction Guidelines in Areas Of High Slip Potential Soils ……............................................. 8-1 Steep Slope Construction Guidelines.....................................8-2 Drain Requirements .............................................................8-3 Bleeder Drain and Outlet Detail ............................................8-4 Bleeder Drain Parallel to Pipeline..........................................8-5 Trench Plug Drain Overview..................................................8-6 Trench Plug Drain Details. .....................................................8-7 Side Hill Construction.............................................................8-8 Side Hill Construction Drain...................................................8-9 Drain Outlet Requirements.....................................................8-10 Subsurface Drain (French Drain)............................................8-11 Seep Intercept Drain (Parallel to Trench)...............................8-12 Appendix A Glossary ................................................................................A-1 Appendix B Miscellaneous (MS4s and Endangered Species)................B-1 Appendix C References .............................................................................C-1 Appendix D High Slip Potential Soils by County....................................D-1 LIST OF TABLES Table 3.04.1 Physical Properties of Plastic Safety Fence ...........................3.04-1 Table 3.10.1 Temporary Seed Chart ...........................................................3.10-3 Table 3.11.1 Permanent Seeding.................................................................3.11-4 Table 3.11.2 Nurse Crops ...........................................................................3.11-6 Table 3.11.3 Permanent Seeding Requirements .........................................3.11-7 Table 3.12.1 Organic Mulch Materials and Application Rates...................3.12-5 Table 3.13.1 ECTC Standard Specification for Temporary Rolled Erosion Control Products .......................................................3.13-5 Table 3.13.2 ECTC Standard Specification for Permanent Rolled Erosion Control Products .......................................................3.13-6 Table 3.13.3 Permissible Velocities for Earth Linings ...............................3.13-7 Table 3.13.4 Permissible Velocities for Grass-lined Channels...................3.13-8 Table 3.15.1 Channel Cross Section Requirements ....................................3.15-4 Table 3.15.2 Channel Stabilization Requirements......................................3.15-4 Table 3.15.3 Permissible Velocities for Grass-lined Channels...................3.15-5 Table 3.15.4 Maximum Permissible Design Velocities..............................3.15-6 Table 3.16.1 Pipe Sizes for Pipe Slope Drain .............................................3.16-1 Table 3.17.1 Permissible Velocities for Grass-Lined Channels .................3.17-5 Table 3.17.2 Permissible Velocities for Earth Linings ...............................3.17-6 Table 3.18.1 Right-of-way Diversion Spacing ...........................................3.18-1 Table 3.21.1 Average Slope of Watershed .................................................3.21-7 Table 3.21.2 Stream Diversion Linings ......................................................3.21-9

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    354 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us