Lean Practitioners Certification Training

Lean Practitioners Certification Training

Lean Practitioners Certification for Manufacturing (5 Days) Program Participants: MODULE-6 (Standardization) This program is designed for the managers, engineers and • What is an standardized system professionals working in the manufacturing and transactional • Advantages of standardization environment, who want to equip themselves with the knowledge and • Degrees of standardization skills necessary to be effective change Agents and Lean Advocates • Development of Standard Operation Procedure and Practitioners in their organization. MODULE-7 Program Overview (Visual Management) • Why Visual Management Lean Program which is often known simply as "Lean", is a generic • Benefits of Visual Management process management philosophy derived mostly from the Toyota • Levels and steps of Visual Management Production System (TPS). It is a powerful method that allows Tools of Visual Display and Visual Control MODULE-8 organizations to improve the productivity, efficiency, and quality of MODULE-8 their products or services. Companies today, from a wide range of (Poka Yoke) industries, government agencies and other areas are finding ways to • Poka Yoke Philosophy apply the principles of lean as a means of producing goods and • Error & Defect delivering services that creates value for the customer with the • Poka Yoke Devices minimum amount of waste and the highest level of quality. Our • Poka Yoke System simulation-based, hands-on workshop will present you with essential MODULE-9 principles, tools and applications of Lean in any environment – (Flow and Work Cell Design) Manufacturing and Transactional. • What’s Flow? • Traditional layout & Lean layout Program Objective • What’s Workcell? Upon the completion of this program, the participants will be able • Prerequisite of Workcell to: • 9 steps for Workcell Design .Understand the Lean Principles and Tools MODULE-10 .Discuss the Lean Deployment Strategy and Framework (Standardized Work) .Conduct Value Stream Maps of the Current State and Develop a • What is Standardized Work Future State • Difference between Work Standard & Standardized Work .Identify Wastes and use critical Lean Tools to Eliminate Wastes • Steps of Standardized Work .Define the Improved Flow and Process in Simulated Manufacturing & MODULE-11 Transactional Environments. SMED (Quick Change Over) .Apply the Lean Principles and Tools at their Workplace and Lead • What is SMED Projects. • Waste during Change Over (C/O) or Setups .Improve the Overall Efficiency of the Factory Operations including • Benefits gained from reducing C/O times the Support Areas. • Procedures for observing & recording internal & external C/O activities Program Outline • Methods for reducing C/O times MODULE-1 MODULE-12 (Introduction to Lean) (Pull System Introduction) • Why “Lean” • What is “Pull” • History of lean5 principles of lean • Prerequisites of Pull System • Lean and Toyota Production System • Order Analysis • Lean and six sigma • How to choose different Pull systems MODULE-2 • Pull System Rules (Waste Identification) • Introduction of Supermarket Model • Define Customer Value-add and Business-Value add MODULE-13 • 7 wastes (Kanban) • Identify the causes of 7 wastes • What’s Kanban? • Muda, Mura & Muri • Kanban Functions MODULE-3 • Kanban Types and Application (Value Stream Mapping) • Kanban Calculation • What is value stream MODULE-14 • The purpose of a Value Stream Map (VSM) (Pacemaker & Heijunka Determine Pacemaker) • Develop a Current State Value Stream • Why Heijunka • Map of a process • Heijunka Elements &Sequence • Analyze a Current State Map for quick wins • Heijunka Box • Develop a Future State Map • Water Spider Route • How to implement VSM • Heijunka Application MODULE-4 MODULE-15 (5S-Workplace Organization) (Upstream Process Pull) • Why 5S • Manage upstream process from Pacemaker • What is 5S • Trigger Withdrawal Kanban • Step by step 5S Implementation • Control upstream batch process from Supermarket MODULE-5 MODULE-16 (Total Productive Maintenance) (Kaizen) • What is TPM & TPM Metrics • What is Kaizen • Six Losses of Equipment and OEE calculation • Kaizen Spirit • 4 phases of TPM • Main Kaizen Activity • 7 steps of TPM .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us