Application �For Approval � of Adjustment� in Ratesbased on the Tariff Glide Path on Energy Rlgw A

Application �For Approval � of Adjustment� in Ratesbased on the Tariff Glide Path on Energy Rlgw A

Republic of the Philippines ENERGY REGULATORY COMMISSION Pacific Center Building San Miguel Avenue, Pasig City IN THE MATTER OF THE APPLICATION FOR APPROVAL OF ADJUSTMENT IN RATESBASED ON THE TARIFF GLIDE PATH ON ENERGY RLGW A. ORY COMMj,sc THE FOURTH TO SIXTH 1. \\ ¶ n: REGULATORY YEARS OF ! '/ c: I THE FIRST REGULATORY JU[ 9 O1R PERIODFOR THE FIRST \\liy1 , ENTRANT ELECTRIC 00Chj:r i R COOPERATIVES UNDER THE TARIFF GLIDE PATH (TGP) RULES, WITH MOTION FOR PROVISIONAL AUTHORITY 2018 - 081 ERC Case No. RC SURIGAO DEL NORTE ELECTRIC COOPERATIVE,INC. (SURNECO), Applicant. APPLICATION WITH MOTION FOR PROVISIONAL AUTHORITY APPLICANT, SURIGAO DEL NORTE ELECTRIC COOPERATIVE, INC. (SURNECO), through counsel, unto this Honorable Commission, respectfully alleges, that: THE APPLICANT 1 I P a V. C 1. SURNECO is a non-stock, non-profit electric cooperative, duly organized and existing under and by virtue of Philippine laws, with principal office address at Narciso corner Espina Streets, Surigao City. 2. It holds an exclusive franchise from the National Electrification Commission, to operate an electric light and power distribution service in Surigao City as well as certain municipalities in the province of Surigao del Norte, namely: Alegria, Bacuag, Claver, Gigaquit, Mainit, Malimono, Placer, San Francisco, Sison, Taganaan and Tubod. NATURE OF THE APPLICATION 3. The instant application is being filed for the approval of Applicant's proposed adjustment in its Distribution, Supply and Metering (DSM) Rates based on the tariff glide path for the fourth to sixth regulatory years of the First Regulatory Period for Electric Cooperatives belonging to the First Entrant Group under the Tariff Glide Path Rules (TGP Rules), as well as other pertinent laws and rules. STATEMENT OF FACTS 4. Sometime in 2013, Applicant filed with the Honorable Commission an application for approval of proposed adjustment in its DSM Rates pursuant to the TGP Rules, docketed as ERC Case No. 2013- 121 RC; 5. In the said application, the cooperative prayed for approval of either of the following two (2) proposed alternative DSM rates, to be made effective starting January 2014 and up to December3l,2016, towit: A.WITH PERFORMANCE INCENTIVE "S" CUSTOMER TYPE Low Higher UNITS Residential Voltage Voltage Distribution Charges: Demand Charge PhP/kW - - 197.06 Distribution System Charge PhP/kWh 0.5333 0.5324 - Supply Charges: Retail Customer Charge PhP/Customer/Mo - 43.15 43.15 Supply System Charge PhPikWh 0.6044 - - Metering Charges: Retail Customer Charge PhP/Meter/Mo. 5.19 32.34 32.34 Metering System Charge PhP/kWh 0.3805 - - 2] P a g e B) EXCLUDING PERFORMANCE INCENTIVE "S" CUSTOMER TYPE Low Higher UNITS Residential Voltage Voltage Distribution Charges: Demand Charge PhP/kW - - 190.03 Distribution System Charge PhP/kWh 0.5143 0.5134 - Supply Charges: Retail CustomerCharge PhP/Customer/Mo - 41.61 41.61 Supply System Charge PhP/kWh 0.5828 - - Metering Charges: Retail Customer Charge I PhP/MeterlMo. 5.00 31.19 31.19 Metering System Charge I PhP/kWh 0.3669 6. Foregoing application was Applicant's initial application for DSM rate adjustment pursuant to the TGP Rules, under which electric cooperatives (EC5)are given an opportunity to adjust their rates once every three (3) years, which may occur at the start of the fourth year of the first Regulatory Period and every three years thereafter. 7. Applicant belongs to the First Entrant Group under the TGP Rules, whose First Regulatory Period is from January 1, 2011 to December 31, 2016. Having filed its initial application for DSM rate adjustment in 201 3based on the tariff glide path for the first to third regulatory years of the First Regulatory Period, the cooperative is filing the instant application for the proposed adjustment of its OSM ratesbased on the tariff glide path for the fourht to sixth regulatory years of the First Regulatory Period, the proposed adjustment to be made effective on the first to third regulatory years of the Second Regulatory Period for the First Entrant ECs. 8. SURNECO's first TGP application under ERC Case No. 2013-121 RC is still being evaluated by the Honorable Commission but despite the pendency thereof, the cooperative adopted and used the proposed DSM rates in said pending application as bases in computing the proposed adjustment in the instant Application. THE PROPOSED OSM RATE ADJUSTMENT 9. Under the TGP Rules, the concerned electric cooperative shall use the following formula in determining the TGP for the fourth to sixth years of the Regulatory Period, to wit: - 3].Page TGPB= TGP + TGPn+i TGP-2 where TGP Ir,Xn + Sn n= the fourth year of ther Regulatory Period and succeeding Regulatory Periods The TGP calculated for each of the three years will be summed to determine the possible rate adjustment starting on the First Year of the next Regulatory Period. 10. Applying the methodology embodied in the TGP Rules, herein Applicant calculated the values of the "I", "X" and "S" and came up with the following results, to wit: TOP B W. "1" "5" TOP B (Excluding "5") Year 2014 3.27% 0.00% 1.10% 4.37% 3.27% Year 2015 14.93% 2.17% 0.70% 13.46% 12.76% Year 2016 0.00% 2.86% 0.70% -2.16% -2.86% Net Results 15.67% 13.17% 11. Utilizing the above values would result in adjustments on Applicant's DSM Rates effective on the first to third years of the Second Regulatory Period for electric cooperatives belonging to the First Entrant Group, to wit: AWITH PERFORMANCE INCENTIVE "S" CUSTOMER TYPE Low Higher UNITS Residential Voltage Voltage Distribution Charges: Demand Charge PhP/kW 227.94 Distribution System Charge PhP/kWh 0.6169 0.6158 Supply Charges: Retail Customer Charge PhP/Customer/Mo 49.91 49.91 Supply System Charge PhP/kWh 0.6991 Metering Charges: Retail Customer Charge PhPIMeter/Mo. 6.00 37.41 37.41 Metering System Charge PhPfkWh 0.4401 4IPage B) EXCLUDING PERFORMANCE INCENTIVE "S" CUSTOMER TYPE Low Higher UNITS Residential Voltage Voltage Distribution Charges: Demand Charge PhP/kW 215.06 Distribution System Charge PhP/kWh 0.5820 0.6810 Supply Charges: Retail Customer Charge PhP/Customer/Mo 47.09 47.09 Supply System Charge PhP/kWh 0.6596 Metering Charges: Retail Customer Charge PhP/Meter/Mo. 5.66 35.30 35.30 Metering System Charge PhP/kWh 0.4152 12. Consequently, Applicant respectfully prays that it be allowed to implement either of the above two (2) calculated alternative DSM rates, to be made retroactive starting January 1, 2017and upto December 31, 2019. SUPPORTING DATA AND DOCUMENTS 13. In support of the foregoing computations, Applicant is submitting herewith the following documents, whióh are being made integral parts hereof, to wit: Annex Markings Nature of Document Proposed TGP Calculation and supporting documents A using the prescribed templates: Index 1" Calculation Efficiency Factor "X" Calculation Performance Incentive "S" Calculation B MFSR - Sections B and E (2012-201 5) Billing Determinants Template C (2012-2015) (kWh Sales, No. of Customers, kW Demand) D Sample Bills per customer type (201 2-201 5) E Regional CPI (201 2-2015) F RFSC Utilization (2013-2015) Consumer Complaints Summary or Tracking Form G (2013-2015) H Audited Financial Statements (2013-2015) 5 IPage ALLEGATIONS IN SUPPORT OF THE MOTION FOR PROVISIONAL AUTHORITY 14. Applicant respectfully repleads herein the foregoing allegations; 15. Applicant respectfully prays that it be allowed to implement the proposed rate adjustment while the application is pending, considering that it is expressly prescribed under the TGP Rules' provision on Regulatory Period and Process, which provides in part, as follows: '2. Regulatory Period and Process 2.1 On or before each Fourth month of the Third and Sixth regulatory year of their respective Regulatory Periods, the electric cooperative may file before the Commission an application for a rate adjustment reflecting the values for the "F', "X" and "5" as determined in accordance with these rules. The initial tariff caps of the respective ECs shall be adjusted by the "I, 'X" and "5" effective at the start of the Fourth Regulatory Year of the First Regulatory Period and succeeding regulatory periods and the First Year of the Second Regulatory Period and succeeding regulatory periods. However, the adjustment for the First year of the Second Regulatory Period and succeeding Regulatory Periods will be subject to the revised tariff caps calculated in accordance with Section 3 of these Rules.(Emphasis ours) 16. Under the TGP Rules, the regulatory period is six (6) years for each entry Group. For the First Entrant Group, the first regulatory period is from January 1, 2011 to December 31, 2016 and the start of the Fourth Regulatory Year is January 1, 2014. Applicant belongs to the First Entrant Group, accordingly, its initial DSM Rates under the TGP Rules should be adjusted through the proposed TGP B Rates starting January 1, 2017; 17. Aside from the foregoing, Applicant further prays for provisional authority to implement the proposed rates during the pendency of the instant application, considering that the cooperative urgently needs additional funds to be able to cope with the rising costs of its operations. Among the major factors that added to its operating costs is the implementation of the Sitio Energization Program (SEP) of the government consisting of massive extension of 61 P a g e its distribution lines up to the remotest and far-flung areas which considerably increased its operations and maintenance costs and likewise resulted to increased system losses which the cooperative is constrained to absorb; 18. Further, the rising cost of materials, tools, equipment, supplies, fuel and other costs incidental to its daily operations has considerably increased these past several years and the funds being generated from the cooperative's DSM rates granted by the Honorable Commission way back in Year 2010 by virtue of the Rules for Setting the Electric Cooperatives' Wheeling Rates (RSEC-WR), is no longer sufficient to cover those costs, and if not addressed accordingly with the adjustment of its rates, Applicant's service to its consumers will be prejudiced.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us