The Cassini-Huygens Mission

The Cassini-Huygens Mission

International Project Management: The Cassini-Huygens Mission NASA Case Study NASA Academy of Program/Project & Engineering Leadership http://appel.nasa.gov How would you explore the moons of Saturn? (watch a video: http://saturn.jpl.nasa.gov/video/videodetails/?videoID=19) http://appel.nasa.gov Cassini-Huygens ¾ U.S. - European mission to explore Saturn ¾ NASA and Italian Space Agency: Cassini spacecraft ¾ European Space Agency: Huygens probe ¾ Launched October 1997 ¾ 6.7 year voyage to Saturn http://appel.nasa.gov Cassini and Huygens Cassini Huygens • Delivered Huygens • Released by Cassini to probe to Titan land on surface of • Remained in orbit Saturn’s moon Titan around Saturn for • Investigated detailed studies of the characteristics of Titan’s planet, its rings and atmosphere and surface satellites (moons) Cassini Huygens Saturn Titan http://appel.nasa.gov Cassini-Huygens: the Complex Project Environment Complex Project-Based Functional Organization Organization Problems Novel Routine Technology New/invented Improved/more efficient Team Global, multidisciplinary Local, homogeneous Cost Life cycle Unit Schedule Project completion Productivity rate Customer Involved at inception Involved at point of sale Survival skill Adaptation Control/stability Discussion point: does this model describe Cassini-Huygens? http://appel.nasa.gov Defining Project Complexity at NASA PROGRAMMATIC TECHNICAL Budget Interfaces/systems engineering • Congressional appropriations • Changing agency Technological readiness constraints and priorities One-of-a-kind systems Contractual Harsh environment federal regulations Software Schedule Long operational • Launch windows lifetimes • Science/operational requirements Unique test facilities & eqpt. Sustained commitment High performance • Administration PEOPLE requirements • Congress It has to work • Public • Partners - academia, international, industry the first time http://appel.nasa.gov (adapted from Vern Weyers, 2006) Technical Complexity: Zero Room for Error ¾ Journey to Saturn included “gravity assists” (slingshot acceleration effects) from Venus, Earth and Jupiter - incredibly precise timing ¾ Cassini orbiter would “insert” Cassini trajectory to Saturn Huygens probe in orbit of Titan (one of Saturn’s moons) ¾ Complex communications among Cassini, Huygens, Deep Space Network, and ground system Huygens descent to surface of Titan http://appel.nasa.gov Organizational Complexity Italian Space Agency NASA ESA Cassini high-gain Cassini orbiter; Huygens probe antenna; radio launch vehicle and associated subsystem and associated communications equipment integration & test equipment on Cassini orbiter http://appel.nasa.gov Case Study: International Collaboration 1998: New project manager 8 months after launch Challenge #1 ¾ Adding scientific activities during multi-year “cruise” to Saturn 9 Pressure from scientists - planetary fly-bys posed unique opportunity 9 Project could “exercise” systems before Saturn 9 Existing agreements: no additional budget or schedule 9 Multi-party negotiations with international science team Solution: Science was added at no cost to the mission http://appel.nasa.gov Case Study: International Collaboration Challenge #2 ¾ Adding full test of data communications system between Cassini and Huygens ¾ Some key stakeholders considered test unnecessary ¾ Test result: failure in telemetry system ¾ Significant data from Huygens about Saturn’s moon Titan would be lost Solution: Required changing Cassini’s trajectory as it entered orbit around Titan 9 Major technical challenge 9 Used much of Cassini’s fuel reserve http://appel.nasa.gov Case Study: International Collaboration Challenge #2a: Regulations prohibited exchange of funds between NASA and ESA to solve the data communications problem Solution: Instead of funds, ESA sent engineers to the Jet Propulsion Lab to work with the NASA team there ¾ ESA engineers encounter Cassini team of 200+, more complex and time-consuming processes ¾ Language barriers with ESA’s non-English native speakers ¾ ITAR and post-9/11 security environment in U.S. http://appel.nasa.gov Outcome: Mission Success A close encounter with Titan http://appel.nasa.gov "It is difficult to say what is impossible, for the dream of yesterday is the hope of today and the reality of tomorrow.” - Robert Goddard http://appel.nasa.gov THIS SLIDE LEFT BLANK http://appel.nasa.gov.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us