R&B Department,Kashmir

R&B Department,Kashmir

Financial details of CRF schemes during 2015-16 R&B Department,Kashmir (Rs in lakh) Physical Revised Date of Progressiv Year of Target progress Expdt Pending cost if Cost of Sanctio e expdt to S.No Name of the project/works commen year of of work during payment any/date work n the end of cement completion in the year s of the year percent revised 1 2 5 5 6 Impvt/ upgrd of road from Khanyar Qamarwari Gogjwara 1 1585.72 Mar-09 2009-10 com 100% 87.00 1585.72 0.00 1585.72 (Nallah Mar) road incl additional bridge over River Jehlum Impvt/ upgrd of Baghi-Ali Mardan 2 612.97 Mar-09 2009-10 com 100% 0.00 612.97 0.00 612.97 Khan Hazratbal road Widening of NH from Qamarwari 3 Chowk to Parimpora Bypass 1379.39 Mar-10 2010-11 com 100% 100.00 1379.39 0.00 1379.39 Junction as four lane Construction of 4-lanning of 4 Boulevard road from nehru Park 3377.00 Mar-15 2016-17 2019-20 1% 50.00 50.00 3327.00 3377.00 to Kralsangri RD 2000-7000 Const of bridge on River Jhelum 5 1513.00 Mar-11 2011-12 com 100% 0.00 1513.00 0.00 1513.00 at Malroo Const of Zero Bridge on River 6 1130.00 Mar-11 2011-12 com 100% 0.00 1130.00 0.00 1130.00 Jhelum (Now Convent) Const of new bridge over River 7 Jhelum at Zainakadal bridge 831.00 Mar-11 2011-12 com 100% 0.00 831.00 0.00 831.00 location, Srinagar Bugroo Khansahib Dodpathri 8 1997.00 Mar-08 2008-09 com 100% 198.35 2195.35 0.00 2195.35 Road Widening/upgradation of 9 1624.00 Mar-15 2016-17 2018-19 3% 50.00 50.00 1574.00 1624.00 Chadoora Khanda road Impvt/ upgrd of Beehama 9 1556.81 Mar-10 2010-11 2016-17 97% 50.00 1506.81 50.00 1556.81 Safapora road Ranga Sangam to Holy Amar Nath 10 1997.39 Mar-2005 2006-07 13% 0.00 250.50 1746.89 1997.39 Ji Cave Constr of 4x37 mtr intermediate 11 lane arch type Bridge at 1556.00 Mar-14 2014-15 2018-19 35% 540.65 540.65 1015.35 1556.00 Watalbagh Bobsipora Ganderbal Widening/upgradation of 12 610.00 Mar-15 2016-17 2018-19 8% 50.00 50.00 560.00 610.00 Safapora Hakbara road Widening/upgradation of Nadihal- 13 1057.00 Mar-15 2016-17 2018-19 0% 0.00 0.00 1057.00 1057.00 Erin Bandipora road Const of road from Warpora to 14 fruit mandi via Saidpora and 1881.98 Mar-10 2010-11 2017-18 89% 200.00 1667.40 214.58 1881.98 Model Town Sopore Upgrd of Lasser Yarbugh Soin 15 605.75 Mar-13 2013-14 2019-20 54% 230.00 330.00 275.75 605.75 Sadnara road Const/ upgrd of Boniyar Trikanjan 16 461.61 Mar-10 2010-11 com 100% 0.00 461.61 0.00 461.61 Maidanan road Const of Ladoora Juhama bridge 17 1087.00 Mar-11 2011-12 com 100% 0.00 1087.00 0.00 1087.00 over river Jhelum Construction/upgradation of 18 Hafrada Astan Wali Hatchimarg 1905.00 Mar-15 2016-17 2018-19 2% 40.00 40.00 1865.00 1905.00 Tumina Marsarai including Construction/upgradation of 19 Dhani Tadd upto Paradda Pandov 1566.00 Mar-15 2016-17 2018-19 0% 0.00 0.00 1566.00 1566.00 including Surmapadi road Const of Khanabal Junction to 20 466.00 Mar-11 2011-12 2016-17 89% 50.00 416.00 50.00 466.00 Mahandi Kadal road Upgradation of Larkipora 21 1955.00 Mar-15 2016-17 2018-19 3% 50.00 50.00 1905.00 1955.00 Zaldoora Lisser road Km 1 to 11 Upgrd of road from NH at 22 Sangam to Industrial Growth 750.00 Mar-13 2013-14 2016-17 88% 400.00 660.40 89.60 750.00 Centre Lassipora Pulwama Widening/upgradation of 23 1430.00 Mar-15 2016-17 2018-19 3% 50.00 50.00 1380.00 1430.00 Awantipora Tral road via Dadsara Widening/upgradation of 24 692.00 Mar-15 2016-17 2018-19 7% 50.00 50.00 642.00 692.00 Lassipora Arihal Khamri road G.TOTAL 33627.62 0.00 2196.00 16507.80 17318.17 33825.97 Page 1 of 1.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us